TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
Responses closed . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM CDT
- Posted
- July 6, 2026
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- AIR FORCE MATERIEL COMMAND.AIR FORCE SUSTAINMENT CENTER.FA8137 AFSC PZIOC
- Place of performance
- S Coffeyville, Oklahoma, 73145
- PSC
- Z2QA: REPAIR OR ALTERATION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- FA813725R0035
- Notice ID
- fb09547ab63e465ca15c4d290359b5b3
Description
Only MAC BOA Holder GCs that have previously submitted proposals for this project will be able to continue forward toward the award.
Updated 06JJuly 2026
Attached Updated Amendment 9 CLIN Description
Revised proposals are due 31 July 2026 with proposal prices valid to 31 October 2026
Only MAC BOA Holder GCs that have previously submitted proposals for this project will be able to continue forward toward the award.
Only MAC BOA Holder GCs that have previously submitted proposals for this project will be able to continue forward toward the award.
Updated 25 June 2026
Attached Amendment 8.
Revised proposals are due 31 July 2026 with proposal prices valid to 31 October 2026
Only MAC BOA Holder GCs that have previously submitted proposals for this project will be able to continue forward toward the award.
Only MAC BOA Holder GCs that have previously submitted proposals for this project will be able to continue forward toward the award.
Updated 24 June 2026
We were just informed by our funding office that funding for this project will not become available until 01 October 2026.
With that said, and the latest project request for proposal prices to be valid to 30 June 2026, we are now going to once again reopen the solicitation with another amendment to all contractors that have provided proposals to allow revised proposals with prices valid till 31 October 2026.
Revised proposals are due 31 July 2026 with proposal prices valid to 31 October 2026
Only MAC BOA Holder GCs that have previously submitted proposals for this project will be able to continue forward toward the award.
Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award.
Updated 5 November 2025.
Government Response to RFI 25A rebuttal has been attached.
Proposal due dates are still 14 November 2025.
Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award.
Updated 24 October 2025.
Still awaiting Government Response to RFI rebuttal received 03 October.
Proposal due dates have been extended from 27 October 2025 to 14 November 2025.
Solicitation Amendment with the proposal due date extension has been attached.
Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award.
Updated 07 October 2025
Still awaiting Government Response to RFI rebuttal received 03 October.
Proposal due dates have been extended from 10 October 2025 to 27 October 2025.
Solicitation Amendment with the proposal due date extension has been attached.
Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award.
Updated 3 October 2025
RFI 25/25A with the Government Response have been posted.
Proposal due dates are still 10 October 2025.
Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award.
Updated 25 September 2025
Government response to RFIs 23, 24 & 25 have been posted with all associated attachments.
Proposal due dates are still 10 October 2025.
Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award.
Updated 18 September 2025
Proposal due date extended from 19 September 2025 to 10 October 2025. Still awaiting additional RFI Government Responses and will post once received or will extend proposal due date if needed.
Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award.
Updated 17 September 2025
RFI 26 has the Government Response and the attachments have been posted. We are currently still awaiting Government Responses for some addtional RFIs that were received.
Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award.
Updated 16 September 2025
Solicitation Amendment with the extension of proposal dates is attached.
Proposal due dates are extended from 19 September 2025 to 10 October 2025.
Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award.
Updated 28 August 2025
Current solicitation proposal due date is suspeneded and offerors will not be required to submit a proposal by 02 September 2025. We are currently still awaiting Government Responses for some addtional RFIs that were received. A proposal due date will be sent out along with a Solicitation Amendment and with the additional RFI Government Responses on a post herein.
Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award.
Updated 14 August 2025
Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award.
Updated 14 August 2025
On the attachment, Solicitation Amendment FA813725R00350004, the cover page states, "The purpose of this amendment is to extend proposal due dates from 15 August 2025 to 01 September 2025". This is incorrect, in the actual solicitation amendment, proposal due dates have been moved from 15 August 2025 to 02 September 2025.
Proposal due dates are 02 September 2025.
Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award.
Updated 13 August 2025
Revised Drawings, Submittal Register, and Deisgn Analysis in response to RFI #22 have been attached.
Solicitation Amendment with the extension of proposal dates is attached.
Proposal due dates are extended from 15 August 2025 to 02 September 2025.
Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award.
Updated 7 August, 2025.
The following is the DOR response to RFI #7:
"The LED Text Sign needs to meet both UFC requirements and Tinker AFB
Standards and have a second line that can scroll message from left to right. The
proposed text sign attached to this RFI will not meet the Tinker AFB Standards. The
LED Text Sign is not required to be Monaco, but will need to meet both UFC and
Tinker AFB Standards.
If the LED Text Sign installed does not meet the required classification, the
enclosure for the LED Text Sign will need to be listed or approved for installation
within a Class 1/Division 1 area. The proposed enclosure does not meet Class
1/Division 1 and the use of a purging/pressurization system to achieve the
classification is not approved. The installation is concerned about using any
enclosure that would drive additional maintenance requirements."
Proposal due dates are still 15 August, 2025.
Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award.
Updated 06 August, 2025
Solicitation Amendment with the extension of proposal dates is attached.
Proposal due dates are extended from 08 August, 2025 to 15 August, 2025
Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award.
Updated 30 July, 2025
Solicitation Amendment with the extension of proposal dates is attached.
Proposal due dates are extended from 31 July, 2025 to 08 August, 2025.
Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award.
Updated 21 July 2025
RFI Responses and 8 new attachments are hereby provided.
Proposals are still due by 31 July, 2025 at 1200 PM CST.
Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award.
Updated 15 July 2025
Solicitation Amendment with the extension of proposal dates is attached.
Proposal due dates are extended from 17 July, 2025 to 31 July, 2025.
Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award.
Updated 15 July 2025
A solicitation amendment will be posted shortly that will extend the proposal due date while we are awaiting for RFI Responses.
Only the MAC BOA Holder GCs that attended Site Visit on 23 June 2025 will be able to continue forward toward the award.
Updated 23 June 2025
The Solicitation, Site Visit Sign In Sheet and all of the Specs Documents have been attached.
Proposals are still due 17 July, 2025.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Updated 13 June 2025.
The initial site visit held on 12 June 2025 was not conducted.
***** Inititial Site Visit is Rescheduled for 23 June 2025 starting at 9:30 through 10:30, meet at main entrance for B2280.
***** You must attend the Initial Site Visit for the project to be considered eligible to propose.
Even if you sent an RSVP for the first initial site visit, request that you send another RSVP and EAL if required, by NOON on 18 June 2025 so that we will know who will be in attendance.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
An RFP amendment will be sent out after the initial site visit to address a revised proposal due date.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Updated June 11, 2025.
Corrected Proposal Due Dates from June 27, 2025 to July 17, 2025.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Project Solicitation Number: FA813725R0035
Project Title: WWYK190068 – REPAIR FIRE SUPPRESSION SYSTEM, B2280
Project Location: Tinker AFB - B2280
Repair the fire suppression system at project location within B2280 at Tinker Air Force Base (AFB) Oklahoma 73145
Project specific documents are attached to this posting.
If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses.
Currently, the Solicitation – Request for Proposal (RFP) is in the draft stage and will be posted once available.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access.
After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated, and the Initial Site Visit is set for Thursday, June 12th at 10:30 A.M. CST on Tinker AFB, B2280.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (96)
- Download
Solicitation Amendment FA813725R00350009 SF 30.pdf
388 KBAdded in Solicitation version 30Posted - Download
Solicitation Amendment FA813725R00350008 SF 30.pdf
1.6 MBAdded in Solicitation version 28Posted - Download
190068_GOVT RESPONSE TO RFI 25A AND REDATED RESPONSE COR.pdf
191 KBAdded in Solicitation version 26Posted - Download
Solicitation Amendment FA813725R00350007 SF 30.pdf
1.3 MBAdded in Solicitation version 26Posted - Download
Solicitation Amendment FA813725R00350006 SF 30.pdf
1.3 MBAdded in Solicitation version 26Posted - Download
GOVERNMENT RESPONSE TO RFI 25_25A COR.pdf
168 KBAdded in Solicitation version 26Posted - Download
WWYK190068_RFI_23-24-25 SEP24.pdf
112 KBAdded in Solicitation version 26Posted - Download
Solicitation Amendment FA813725R00350005 SF 30.pdf
1.3 MBAdded in Solicitation version 26Posted - Download
Capsol LED Text Displays - Capsol.pdf
1.5 MBAdded in Solicitation version 26Posted - Download
Capsol Mini LED Text Displays - Capsol.pdf
1.5 MBAdded in Solicitation version 26Posted - Download
CAPSOL-EXP-LEDM-Text-Display-Data-Sheet-V1.4.pdf_safe.pdf
168 KBAdded in Solicitation version 26Posted - Download
CAPSOL-LEDM-Text-Display-Data-Sheet_1.6.pdf
73 KBAdded in Solicitation version 26Posted - Download
RFI - Light Fixtures in Joist Ceiling RFI 26 COR.pdf
249 KBAdded in Solicitation version 26Posted - Download
RFI 26 zl1d.pdf_safe.pdf
881 KBAdded in Solicitation version 26Posted - Download
RFI 26 WWYK190068_Rev_1_26 51 00.pdf
50 KBAdded in Solicitation version 26Posted - Download
RFI 26 Fixture with Joist.pdf
57 KBAdded in Solicitation version 26Posted - Download
Solicitation Amendment FA813725R00350004 SF 30.pdf
1.3 MBAdded in Solicitation version 26Posted - Download
190068_Attch04_Revised_Design_Analysis.pdf
22 MBAdded in Solicitation version 26Posted - Download
190068_Attch02_Revised_Submittal_Register.pdf
85 KBAdded in Solicitation version 26Posted - Download
190068_Attch01_DRWG.pdf
14 MBAdded in Solicitation version 26Posted - Download
Solicitation Amendment FA813725R00350003 SF 30.pdf
1.3 MBAdded in Solicitation version 26Posted - Download
Solicitation Amendment FA813725R00350002 SF 30.pdf
1.3 MBAdded in Solicitation version 26Posted - Download
190068_PreBid RFI GOVT RESPONSE.pdf
215 KBAdded in Solicitation version 26Posted - Download
000111_F1.pdf
58 KBAdded in Solicitation version 26Posted - Download
190068_IFC_Design Analysis_Final.pdf
21 MBAdded in Solicitation version 26Posted - Download
FP from DACA63-76-C-0111.pdf
2.5 MBAdded in Solicitation version 26Posted - Download
190068_TAFB_IFC_FINAL_SPECIFICATIONS.pdf
1.1 MBAdded in Solicitation version 26Posted - Download
fire prot-01.pdf
725 KBAdded in Solicitation version 26Posted - Download
UFGS 28 31 76.pdf_safe.pdf
227 KBAdded in Solicitation version 26Posted - Download
190068_DD100_Appendix A.pdf
135 KBAdded in Solicitation version 26Posted - Download
190068_DD100_Appendix B.pdf
126 KBAdded in Solicitation version 26Posted - Download
Solicitation Amendment FA813725R00350001 SF 30.pdf
1.3 MBAdded in Solicitation version 26Posted - Download
WWYK190068 2nd SiteVisit Signin 23JUN25.pdf
178 KBAdded in Solicitation version 26Posted - Download
Solicitation - FA813725R0035 for WWYK190068.pdf
1.7 MBAdded in Solicitation version 26Posted - Download
EMS General Awareness Training for Contractors Aug 2018 PDF.pdf
2.3 MBAdded in Solicitation version 26Posted - Download
00 72 00.pdf
5.3 MBAdded in Solicitation version 26Posted - Download
00 71 00.pdf
1.5 MBAdded in Solicitation version 26Posted - Download
01 78 00.pdf
1.4 MBAdded in Solicitation version 26Posted - Download
01 42 00.pdf
10 KBAdded in Solicitation version 26Posted - Download
01 33 00.pdf
856 KBAdded in Solicitation version 26Posted - Download
00 70 00.pdf
897 KBAdded in Solicitation version 26Posted - Download
01 50 00.pdf
300 KBAdded in Solicitation version 26Posted - Download
Tinker General Requirements Specifications_Nov 2022_Change Log.pdf
94 KBAdded in Solicitation version 26Posted - Download
01 45 00.00 10.pdf
36 KBAdded in Solicitation version 26Posted - Download
01 33 16.00 10.pdf
86 KBAdded in Solicitation version 26Posted - Download
00 80 05.pdf
10 KBAdded in Solicitation version 26Posted - Download
01 32 16.00 20.pdf
28 KBAdded in Solicitation version 26Posted - Download
01 78 23.pdf
34 KBAdded in Solicitation version 26Posted - Download
000_TABLE OF CONTENTS.pdf
70 KBAdded in Solicitation version 26Posted - Download
00 80 00.pdf
8.2 KBAdded in Solicitation version 26Posted - Download
UMRL.pdf
686 KBAdded in Solicitation version 26Posted - Download
ERDCITL_TR12-1_r2.pdf
3.4 MBAdded in Solicitation version 26Posted - Download
ERDCITL_TR12-6_r6.pdf
1.5 MBAdded in Solicitation version 26Posted - Download
ufc_3_260_01_2019_c1.pdf
70 MBAdded in Solicitation version 26Posted - Download
ufc_3_535_01_2017_c4.pdf
20 MBAdded in Solicitation version 26Posted - Download
tinkerafb_INRMP.pdf
16 MBAdded in Solicitation version 26Posted - Download
EM_385-1-1.pdf
10 MBAdded in Solicitation version 26Posted - Download
ufc_3_600_01_2016_c6.pdf
9.9 MBAdded in Solicitation version 26Posted - Download
tinkerafb_INRMP_App G.pdf
4.6 MBAdded in Solicitation version 26Posted - Download
dafi21-101_afmcsup_afmcgm2023-01.pdf
2.8 MBAdded in Solicitation version 26Posted - Download
dafman91-203.pdf
2.8 MBAdded in Solicitation version 26Posted - Download
ufc_3_260_04_2018.pdf
2.3 MBAdded in Solicitation version 26Posted - Download
afi91-202_afmcsup.pdf
2.3 MBAdded in Solicitation version 26Posted - Download
ufc_3_601_02_2021.pdf
2.1 MBAdded in Solicitation version 26Posted - Download
dafi91-202.pdf
1.9 MBAdded in Solicitation version 26Posted - Download
tinkerafbi13-204.pdf
1.8 MBAdded in Solicitation version 26Posted - Download
afman32-7003.pdf
1.3 MBAdded in Solicitation version 26Posted - Download
dafi13-213.pdf
1.2 MBAdded in Solicitation version 26Posted - Download
afman40-201.pdf
1.1 MBAdded in Solicitation version 26Posted - Download
tinkerafb_HWMP.pdf
1016 KBAdded in Solicitation version 26Posted - Download
afman48-148.pdf
1.0 MBAdded in Solicitation version 26Posted - Download
dafi13-213_tinkerafbsup.pdf
769 KBAdded in Solicitation version 26Posted - Download
TAFB_SOP_outages_v2.pdf
473 KBAdded in Solicitation version 26Posted - Download
afman91-203_oc-alcsup.pdf
389 KBAdded in Solicitation version 26Posted - Download
afi48-104.pdf
317 KBAdded in Solicitation version 26Posted - Download
tinkerafb_INRMP_App E.pdf
225 KBAdded in Solicitation version 26Posted - Download
tinkerafbi21-100.pdf
213 KBAdded in Solicitation version 26Posted - Download
dodio-2000.16v1_afi10-245-o.pdf
37 KBAdded in Solicitation version 26Posted - Download
1354 Checklist.pdf
82 KBAdded in Solicitation version 26Posted - Download
VEAL Template.pdf
106 KBAdded in Solicitation version 26Posted - Download
Staging Request Form.pdf
92 KBAdded in Solicitation version 26Posted - Download
Recovered Materials Determination Form.pdf
129 KBAdded in Solicitation version 26Posted - Download
EAL Template.pdf
142 KBAdded in Solicitation version 26Posted - Download
017800_Attch1_DD1354.pdf
93 KBAdded in Solicitation version 26Posted - Download
013300_Attch1_TAFBF3000.pdf
234 KBAdded in Solicitation version 26Posted - Download
007200_Attch14_Information for New Boilers.pdf
144 KBAdded in Solicitation version 26Posted - Download
007200_Attch9_EMS Awareness Training.pdf
86 KBAdded in Solicitation version 26Posted - Download
007200_Attch7b_Monthly Hazardous Usage Report.pdf
123 KBAdded in Solicitation version 26Posted - Download
007200_Attch7a_AF3952.pdf
40 KBAdded in Solicitation version 26Posted - Download
007100_Attch1_Airfield Construction Waiver.pdf
192 KBAdded in Solicitation version 26Posted - Download
007000_Attch1_TAFB Outage Request Form.pdf
186 KBAdded in Solicitation version 26Posted - Download
WWYK190068 Canceled SiteVisit Signin 12JUN25.pdf
218 KBAdded in Solicitation version 26Posted - Download
190068_ATT10_Submittal_Register.pdf
176 KBAdded in Solicitation version 26Posted - Download
190068_ATT11_Revised_Drawings.pdf
13 MBAdded in Solicitation version 26Posted - Download
190068_ATT9_SOW.pdf
267 KBAdded in Solicitation version 26Posted - Download
EAL List - 190068.xlsx
62 KBAdded in Solicitation version 26Posted
Lifecycle
- 1Version 1Solicitation
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
- 2Version 2Solicitation
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
- 3Version 3Solicitation
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
- 4Version 4Solicitation
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
- 5Version 5Solicitation
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
- 6Version 6Solicitation
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
- 7Version 7Solicitation
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
- 8Version 8Solicitation
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
- 9Version 9Solicitation
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
- 10Version 10Solicitation
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
- 11Version 11Solicitation
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
- 12Version 12Solicitation
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
- 13Version 13Solicitation
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
- 14Version 14Solicitation
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
- 15Version 15Solicitation
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
- 16Version 16Solicitation
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
- 17Version 17Solicitation
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
- 18Version 18Solicitation
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
- 19Version 19Solicitation
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
- 20Version 20Solicitation
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
- 21Version 21Solicitation
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
- 22Version 22Solicitation
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
- 23Version 23Solicitation
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
- 25Version 25Solicitation
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
- 26Version 26Solicitation
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
- 27Version 27Solicitation
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
- 28Version 28Solicitation
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
- 29Version 29Solicitation
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
- 30Version 30SolicitationCurrent
TINKER AFB MAC BOA WWYK190068 REPAIR FIRE SUPPRESSION SYSTEM, B2280
Similar Opportunities
Additional Details
Solicitation Number
FA813725R0035
Archive Date
Dec 31, 2026
Office Address
TINKER AFB, OK, 73145-9125