RGFO ROADS ADMIN AND REC SITE IDR 2022

Archived on April 16, 2022. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
5:00 PM UTC−06:00
Posted
March 4, 2022
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of the InteriorBUREAU OF LAND MANAGEMENT

Notice details

Office
COLORADO STATE OFFICE
Place of performance
Canon City, CO, 81212
Last updated
Dec 4, 2025

Identifiers

Solicitation number
140L1722R0001
Notice ID
b21155115f344db6b065e73167a93031

Description

RGFO ROADS ADMIN AND REC SITE IDR 2022

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:140L1722R0001
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 2×
    Pre-SolicitationFeb 18, 2022

    Y--RGFO ROADS ADMIN AND REC SITE IDR 2022

    Notice 610543c9eea245398120dbd4599c488d on SAM.gov

  2. SolicitationCurrentMar 4, 2022

    RGFO ROADS ADMIN AND REC SITE IDR 2022

    Notice b21155115f344db6b065e73167a93031 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. PROJECT NAME: CO BR UCPO Blue Mesa Road(1) Blue Mesa Road Blue Mesa Road is a 1.44-mile corridor located in Gunnison County, CO and provides access to the Bureau of Reclamation (BOR) Power Plant and Pine Creek Trailhead recreational activities on the Curecanti National Recreational Area. SCOPE OF THE WORK Schedule A: Proposed rehabilitation of 0.86 miles to replace existing gravel roadway with asphalt concrete pavement. Reconstruction/Rehabilitation, as needed, for 0.24 miles of existing asphalt to incorporate raising roadway profile at US 50 intersection, drainage improvements including replacement and/or lining of damaged culverts, relocation of traffic counters, formalize parking area with ADA stalls, signing and striping, ditch reconditioning, rockfall mitigation. Option X: Proposed rehabilitation of 0.34 miles to replace existing gravel roadway with asphalt concrete pavement from BOR gate to Blue Mesa Power Plant, drainage improvements to include replacement of damaged culverts, signing and striping, ditch reconditioning, installation of 6” electrical conduit for purposes of future automatic gate installation. Option Y: Proposed 6-inch electric conduit installation and 2 ft x 2 ft max trenching for 2,215 LF miles from the electric security gate to The Blue Mesa Power Plant. Conduit will provide future access for BOR to provide electric connection to security gate. PRINCIPAL WORK ITEMS: Schedule A: 15225-0000 Slope, Reference, and Clearing and Grubbing Control: 1.051 MILE 20301-1900 Removal of Pipe Culvert: 5 EACH 20401-0000 Roadway Excavation: 1,500 CU YD 30201-2000 Roadway Aggregate, Method 2: 2,500 CU YD 30302-1000 Ditch Reconditioning: 3,280 LN FT 40301-0100 Asphalt Concrete Pavement, Type 1: 2,500 TON 60103-0140 Concrete, Headwall for 24-Inch Pipe Culvert (L-Shaped): 3 EACH 60103-0160 Concrete, Headwall for 30-Inch Pipe Culvert: 1 EACH 60103-0280 Concrete, Headwall for 66-Inch Pipe Culvert (Includes Wingwalls): 1 EACH 60201-0800 24-Inch Pipe Culvert: 255 LN FT 60201-0900 30-Inch Pipe Culvert: 45 LN FT 60707-1200 Lining 66-Inch Pipe Culvert (HDPE Slipline): 110 LN FT 60707-1300 Lining 72-Inch Pipe Culvert (HDPE Slipline): 190 LN FT 63401-0300 Pavement Markings, Type B, Solid: 46,000 LN FT Option X: 15225-0000 Slope, Reference, and Clearing and Grubbing Control: 0.38 MILE 20420-0000 Embankment Construction: 200 CU YD 30201-2000 Roadway Aggregate, Method 2: 700 CU YD 40301-0100 Asphalt Concrete Pavement, Type 1: 650 TON 56603-0000 Reinforced Shotcrete: 180 SQ YD 60704-0000 Cleaning Culvert in Place: 7 EA 63401-0300 Pavement Markings, Type B, Solid: 8,500 LN FT Option Y: 63610-3410 Conduit, 6-Inch, HDPE (Schedule 40): 2,215 LN FT 63621-1000 Utility Box, Pullbox: 6 EA 63622-0000 Utility Trench: 2,215 LN FT ANTICIPATED SCHEDULE Advertisement: November 2026 Award: January 2027 NTP: April 2027 Construction: May 2027- October 2027 ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000 A NON-MANDATORY PRE-BID SITE VISIT WILL BE HELD NOVEMBER 4TH, 2026 AT 10:00AM. PLEASE SEE ATTACHEMENTS FOR ADDITIONAL INFORMATION
70%
Pre-SolicitationOpen
OR FS FREWN602 28(1), Road 28 Reconstruction Total Small Business Set-Aside This work consists of full depth reclamation of the existing roadway, aggregate surfacing and drainage. Base: will reconstruct approximately 8.3 miles of full depth reclamation of the existing roadway, aggregate surfacing and drainage. Option X: includes an additional 3.4 miles of full depth reclamation Option Y: includes an additional 14.1 miles of full depth reclamation Option Z: includes 7.5 miles of minor asphalt patches. Project Location: This project is located approximately six miles south of Silver Lake, OR. Estimated Price Range: Between $5,000,000 and $10,000,000 Tentative Solicitation Date: January/February 2027 Tentative Fixed Completion Date: Base: July 2027 Option X: July 2027 Option Y: September 2027 Option Z: August 2027 INTERESTED VENDORS LIST: The Interested Vendor List on SAM.gov is viewable only by users who are linked to an entity with an active Unique Entity Identifier (UEI) and hold an assigned role (such as Contract Opportunities Administrator, Data Viewer, or Data Entry). The Federal Government does not maintain or provide a separate plan holders list. If you need assistance, go to https://www.fsd.gov/gsafsd_sp. PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the INVITATION FOR BIDS (IFB) (specifications and plans) will be posted at this link.
65%
Pre-SolicitationOpen
This project involves the repair and resurfacing of three parking lots on the Arapaho and Roosevelt National Forest and Pawnee National Grassland including crack sealing, pavement patching, seal coating and re-striping. NAICS code 237310 - Highway, Street, and bridge Construction as a 100% SB Set Aside. Size standard $45 Million. PSC Code Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, Questions Due: November 6th, 2026 at 14:00 Eastern Standard Time(EST). Quotes Due:November 23rd, 2026 at 14:00 Eastern standard Time (EST). All questions and quotes relating to this Solicitation shall be submitted to Contract Specialist, Jordan Carlsen at Jordan.Carlsen@usda.gov by the deadlines stated above. Late quotes will be rejected.
65%
Solicitation11/23/2026
PROJECT DESCRIPTION: The Office of Missile Air Defense Program (OMAD) is a Defense Access Road (DAR) program used by the Department of Defense (DoD) to fund the annual maintenance and improvements on certified gravel roads. FHWA works with the Military Surface Deployment and Distribution Command (SDDC) to support the Air Force Intercontinental Ballistic Missile Program (Minuteman). These Minuteman Missile Access Roads are located in 6 counties within North Dakota. SCOPE OF THE WORK: The work includes roadway reconditioning and adding four inches of aggregate surface course as well as the replacement of culverts. All proposed work is to stay on the existing roadway bench. The proposed typical section consists of reconditioning the existing gravel roadway per Section 303 and adding an additional 4-inches of Aggregate Surface Course with a maximum width of 24-feet. A 4% crown is proposed or as approved by the CO. The Contractor will need to taper down the proposed aggregate surface, per the typical section, at applicable locations.
64%
Solicitation12/02/2026
PROJECT DESCRIPTION: Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles. SCOPE OF THE WORK: The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items: Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats. Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project. Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project. The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement. PRINCIPAL WORK ITEMS: Roadway Aggregate: 1,600 TONS Ditch Reconditioning: 2,000 LNFT Full Depth Reclamation: 1.3 MILE Asphalt Concrete Pavement: 3,600 TON 18-Inch Pipe Culvert: 100 LNFT 24-Inch Pipe Culvert: 175 LNFT Boulder: 100 EACH ANTICIPATED SCHEDULE: Advertisement – October 2026 Award-January - 2027 Construction – January 2027 through October 2027 ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000
64%
Solicitation11/17/2026

Additional Details

Solicitation Number

140L1722R0001

Archive Date

Apr 16, 2022

Office Address

Lakewood, CO, 80225