Z--BLM-CO RGFO PARK CENTER WELL VALVE REPLACEMENT
Awarded on September 25, 2026. Full description on SAM.gov.
Overview
- Posted
- September 25, 2026
- Notice type
- Award Notice
- NAICS
- 213112: Support Activities for Oil and Gas Operations
- Agency
- Department of the InteriorBUREAU OF LAND MANAGEMENT
Notice details
- Office
- COLORADO STATE OFFICE
- Place of performance
- Latitude 38.521286, Longitude -105.214619, Canon City, CO, 81212
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
- Award date
- Sep 25, 2026
- Award amount (SAM.gov award notice)
- $790.0K
Identifiers
- Solicitation number
- 140L1726Q0022
- Notice ID
- 5840fe9556024fad810c6b83a4959d74
- Award number (PIID)
- 140L1726C0001
Description
Award Overview
Award Number
140L1726C0001
Award Amount (SAM.gov award notice)
$790.0K
Award Date
Sep 25, 2026
Awardee
Awardee UEI
V7FAN2J2XPR7
Awardee CAGE Code
23LR4
Awardee Address
3040 E MAIN ST, Canon City, CO 81212, UNITED STATES
Original Solicitation
Notice ID: 5840fe9556024fad810c6b83a4959d74
Posted Date: Sep 25, 2026
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $790.0KSigned Sep 25, 2026
Contacts
Contracting Officer
Primary Contact
Documents
Files (21)
- Download
Sol_140L1726Q0022_Amd_0006.pdf
203 KBAdded in Solicitation version 8Posted - Download
B11_COMPREHENSIVE_QA_PARK_CENTER_WELL_0006.pdf
167 KBAdded in Solicitation version 8Posted - Download
Sol_140L1726Q0022_Amd_0005.pdf
211 KBAdded in Solicitation version 6Posted - Download
B08_140L1726Q0022_UPDATED_SECTION_M_0005.pdf
60 KBAdded in Solicitation version 6Posted - Download
B08_140L1726Q0022_UPDATED_SECTION_C_0005.pdf
48 KBAdded in Solicitation version 6Posted - Download
B08_140L1726Q0022_UPDATED_SECTION_L_0005.pdf
76 KBAdded in Solicitation version 6Posted - Download
B08_140L1726Q0022_UPDATED_SECTION_B_0005.pdf
67 KBAdded in Solicitation version 6Posted - Download
B08_SCHEDULE_OF_ITEMS_PARK_CENTER_WELL_v07_30_2026_0005.pdf
288 KBAdded in Solicitation version 6Posted - Download
A05_SOO_PARK_CENTER_WELL_MAIN_VALVE_REPLACEMENT_v07_31_26_0005.pdf
2.8 MBAdded in Solicitation version 6Posted - Download
Sol_140L1726Q0022_Amd_0004.pdf
202 KBAdded in Solicitation version 5Posted - Download
Sol_140L1726Q0022_Amd_0003.pdf
206 KBAdded in Solicitation version 4Posted - Download
Sol_140L1726Q0022_Amd_0002.pdf
206 KBAdded in Solicitation version 3Posted - Download
A06_Park_Center_Well_Specs_pgs__34_-_88_0002.pdf
624 KBAdded in Solicitation version 3Posted - Download
A06_Park_Center_Well_Drawings_89_-_100_0002.pdf
2.6 MBAdded in Solicitation version 3Posted - Download
B08_Park_Center_Well_Main_Valve_Replacement_-_Schedule_of_Items_V6_24_26_0002.pdf
119 KBAdded in Solicitation version 3Posted - Download
Sol_140L1726Q0022_Amd_0001.pdf
201 KBAdded in Solicitation version 2Posted - Download
A05_SOO_PARK_CENTER_WELL_MAIN_VALVE_REPLACEMENT_v6_22_26_0001.pdf
2.1 MBAdded in Solicitation version 2Posted - Download
B08_Park_Center_Well_Main_Valve_Replacement_-_Schedule_of_Items_0001.pdf
108 KBAdded in Solicitation version 2Posted - Download
Sol_140L1726Q0022.pdf
404 KBAdded in Solicitation version 1Posted - Download
B03_CO20260003.pdf
1.9 MBAdded in Solicitation version 1Posted - Download
A05_SOO_PARK_CENTER_WELL_MAIN_VALVE_REPLACEMENT.pdf
2.1 MBAdded in Solicitation version 1Posted
Lifecycle
- 2Version 2SolicitationArchived
Z--PARK CENTER WELL VALVE REPLACEMENT
- 5Version 5Award NoticeArchivedCurrent
Type changed from Solicitation to Award Notice
Z--BLM-CO RGFO PARK CENTER WELL VALVE REPLACEMENT
Other notices for this solicitation
- SolicitationRelated noticeJun 22, 2026
Z--PARK CENTER WELL VALVE REPLACEMENT
- SolicitationRelated noticeJun 22, 2026
PARK CENTER WELL VALVE REPLACEMENT
- SolicitationRelated noticeJun 24, 2026
Z--PARK CENTER WELL VALVE REPLACEMENT
- SolicitationRelated noticeJul 6, 2026
Z--PARK CENTER WELL VALVE REPLACEMENT
- SolicitationRelated noticeJul 13, 2026
Z--PARK CENTER WELL VALVE REPLACEMENT
- SolicitationRelated noticeAug 4, 2026
Z--PARK CENTER WELL VALVE REPLACEMENT
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
YOSE 22866 Rehabilitate Hodgdon Meadows Water System and YOSE 196755 Extend Hodgdon Meadow Campground Sewer | - | Market Research | 11/02/2026 |
See Amendment and Attachments. | - | Solicitation | 11/06/2026 |
DEPARTMENT OF VETERANS AFFAIRS NETWORK CONTRACTING OFFICE 21 (NCO 21) Description: THIS IS A PRE-SOLICITATION NOTICE FOR A REQUEST FOR QUOTE (RFQ). VA Southern Nevada Health Care System (VASNHCS) has a future need for fuel tank cleaning, inspection, sampling, testing of fuels quality, restoration and fueling of 9 underground diesel fuel tanks for the VA Palo Alto Health Care System (VASNHCS) located at 6900 North Pecos Road, North Las Vegas, NV 89086-4400. Solicitation Number 36C26127Q0089 for this effort will be posted to SAM.GOV (https://sam.gov) on or about October 23, 2026. This solicitation will contain all necessary specifications and information necessary to quote the project. See solicitation for when questions must be submitted. Quotes are tentatively scheduled to be due on November 6, 2026 (see solicitation when available for specific time/date). Point of Contact: Gary Christensen, Contract Specialist, gary.christensen@va.gov. Questions regarding this notice may be submitted via e-mail to gary.christensen@va.gov. | - | Pre-Solicitation | 11/06/2026 |
The Contractor shall provide FJI Diesel fuel, JIS K2204-1997-1-GO, Pour point requirement of a maximum of -2.5 C. | - | Solicitation | 11/13/2026 |
E-Seal Technology from Los Alamos National Laboratory offers a transformative answer to the world’s aging wells. E-Seal is a liquid sealant that flows like water until an applied electric field steers its engineered micelles directly into the sub-millimeter cracks where cement and polymer treatments physically cannot reach, then transforms into a durable, jammed plug that holds even after the power is switched off. With an estimated tenfold cost advantage over current sealants, the ability to mitigate galvanic corrosion of well casings, and an AI-guided control system that adjusts voltage in real time as the seal forms, E-Seal stands as the first intelligent, actively steered wellbore repair platform built for the leak pathways that define modern well failure. Overview E-Seal begins as a low-viscosity, water-like fluid carrying specially engineered surfactant micelles and stabilized colloidal particles. When an electric field is applied across the target zone, three electrokinetic forces act in concert: Electrophoresis pulls the charged micelles toward the fracture, electro-osmosis drives bulk fluid flow into tight constrictions, and dielectrophoresis uses non-uniform field gradients to push larger micelle clusters into the narrowest gaps. As the micelles concentrate inside the crack, the dispersion transitions from a flowing liquid into a jammed, high-viscosity network that bridges the fracture wall-to-wall and resists pressure-driven flow even after the field is removed. Technology Description At the molecular scale, surfactant molecules in the E-Seal fluid self-assemble into micelles above the critical micelle concentration, and cement surfaces in downhole brine naturally develop an electrical double layer that interacts with these approaching charged carriers. In high-salinity brines containing divalent cations such as calcium and magnesium, the double layer compresses, inter-particle repulsion drops and micelles aggregate and adsorb onto the cement face; silica or alumina nanoparticles then reinforce the network as physical anchoring points, producing a mechanically robust plug that maintains low permeability over time. Optional additives further tune the sealant to site conditions. Trivalent cations of lanthanum and cerium raise ionic strength, accelerate micelle aggregation and can react with carbonate species in carbonate-bearing brines to precipitate low-solubility mineral phases as a secondary plugging mechanism. Crosslinked polyacrylamide derivatives, sodium polyacrylate and sulfonated polyacrylamide gel particles also can be incorporated to reinforce the seal through polymer crosslinking or by swelling on contact with the leaking fluid. Layered on top of the chemistry is an AI/ML-based real-time control pipeline that monitors sealing progress and dynamically recommends voltage adjustments as conditions evolve in the wellbore, positioning E-Seal as an actively steered rather than passively injected treatment. The applied potential difference carries a second benefit beyond transport: It helps mitigate galvanic corrosion of the well casing, addressing a long-standing integrity concern in parallel with the primary sealing function. Because the underlying transport mechanism is electrokinetic rather than pressure-driven, the same chemistry is well suited to micron-scale defects in any cementitious, porous or fractured medium, including concrete infrastructure, dams, tunnels, underground vaults, waste containment structures, clay and bentonite engineered barrier systems, repository backfill, corroded metallic interfaces, leaky caprocks, fault damage zones, abandoned mine workings and underground storage caverns. Advantages Reaches sub-millimeter microfractures and microannuli that cement squeeze jobs cannot penetrate because of particle bridging at the fracture mouth Maintains sealing performance under the high temperatures, high pressures, and aggressive brine chemistries where polymer and resin sealants typically break down Delivers an estimated tenfold cost advantage over contemporary sealing approaches Mitigates galvanic corrosion of well casings as a built-in secondary benefit of the applied electric field Uses an AI-guided control system that tracks sealing progress and adjusts voltage dynamically for a smarter, more reliable repair Applies broadly beyond wellbores to concrete, containment, and subsurface infrastructure wherever micron-scale leak paths drive failure Market Applications Oil and Gas Recovery (legacy well plugging and abandonment, sustained casing pressure remediation, methane leak compliance) Geothermal Energy (well integrity repair, asset life extension for high-cost geothermal wells) Carbon Capture (caprock and wellbore integrity for long-term CO2 containment) Critical Infrastructure (dams, tunnels, underground vaults, reservoirs) Mining and Subsurface Storage (abandoned mine workings, underground storage caverns, fault zones) S-197080 U.S. Patent pending LA-UR-26-25954 LANL Tech Partnerships: Unlock the Innovative Potential Los Alamos National Laboratory offers a wide range of cutting-edge technologies and capabilities that may provide your company with a competitive edge in the market and unlock the innovative potential that can enhance, refine, and revolutionize your products. LANL’s licensing program focuses on moving inventions developed by our researchers to commercial innovations. Patented and patent pending inventions and copyrighted software are available to existing and start-up companies through exclusive and non-exclusive licensing agreements. For specific discussions, please contact licensing@lanl.gov. Note: This is not a call for external services for the development of this technology. https://www.lanl.gov/engage/collaboration/feynman-center/partner-with-us/licensing-technology m.lanl.gov/tech-search | - | Special Notice | 10/01/2026 |
Additional Details
Solicitation Number
140L1726Q0022
Archive Date
Oct 10, 2026
Office Address
Lakewood, CO, 80225