GovChime
Notice ID: 6bae987195d43cce0d2dea5189a6b3e2Award NoticeAwarded

Y--Rehabilitate Boundary Fence, Badlands National Par

Awarded on September 19, 2018. Full description on SAM.gov.

Awarded tounder 140P6318C0030 (source: SAM.gov award notice)• $468.7K

Overview

Posted
September 19, 2018
Notice type
Award Notice
NAICS
238990: All Other Specialty Trade Contractors
Agency
Department of the InteriorNATIONAL PARK SERVICE

Notice details

Office
DSC CONTRACTING SERVICES DIVISION
Place of performance
Badlands National Park<br />Interior<br />SD<br />57750<br />USA<br /> 57750 USA
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Nov 30, 2025
Award date
Sep 19, 2018
Award amount (SAM.gov award notice)
$468.7K

Identifiers

Solicitation number
140P6318B0007
Notice ID
6bae987195d43cce0d2dea5189a6b3e2
Award number (PIID)
140P6318C0030

Description

IGF::OT::IGF X:NOGRN Rehabilitate Boundary Fence, Badlands National Park

Full description on SAM.gov

Award Overview

Award Number

140P6318C0030

Award Amount (SAM.gov award notice)

$468.7K

Award Date

Sep 19, 2018

Awardee

Awardee UEI

K32QW9MAY2Y7

Original Solicitation

Notice ID: 6bae987195d43cce0d2dea5189a6b3e2

Posted Date: Sep 19, 2018

Original Response Deadline: Not specified

Contacts

Documents

No documents available.

Lifecycle

Solicitation:140P6318B0007
  1. Market Research
  2. Pre-Solicitation
  3. Solicitation
  4. Awarded

This opportunity has been awarded.

  1. Market ResearchMar 28, 2018

    Y--Rehabilitate Boundary Fence, Badlands National Park

    Notice 466105adf711b429c1a4a5a5fda4601b on SAM.gov

  2. 7×
    Pre-SolicitationJul 26, 2018

    Y--Rehabilitate Boundary Fence, Badlands National Par

    Notice 3e8544aa5ce98899d950bdfa0d3e14d7 on SAM.gov

  3. SolicitationSep 10, 2018

    Y--Rehabilitate Boundary Fence, Badlands National Par

    Notice d74d9874041bf04b6fcc102cd1029399 on SAM.gov

  4. AwardedCurrentSep 19, 2018

    Y--Rehabilitate Boundary Fence, Badlands National Par

    Notice 6bae987195d43cce0d2dea5189a6b3e2 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
PGMB Security Gate - Amendment 4 provides the questions and answers collected following the site visit conducted on 10/26/2026. Quotes remain due on November 23, 2026, at 2:00 PM MST.
-Combined Synopsis11/23/2026
This description is intended to summarize the project at a high level for procurement purposes. Interested parties must refer to the full SOW for complete technical requirements, detailed scope elements, design and construction deliverables, environmental obligations, safety standards, and administrative procedures. The SOW governs all expectations for this procurement. Project Overview The National Laboratory of the Rockies (NLR) is soliciting design‑build services for installation of new perimeter fencing along the North boundary of the South Table Mountain (STM) Campus. The work includes designing and installing new fencing, removing designated sections of existing chain‑link fence, and completing all related construction activities in accordance with NLR’s design standards, construction specifications, and DOE site requirements. Portions of the work require coordination with the State Historic Preservation Office (SHPO). Interested parties must reference the full Statement of Work (SOW) for all detailed scope, technical requirements, and performance expectations. Design‑Build Requirements The Subcontractor shall develop and submit design documents consistent with NLR’s required 50% and 90% design reviews, followed by preparation of a complete 100% Issued‑for‑Construction package. All design work must comply with applicable codes, NLR Design Standards, and required CAD/BIM formats. Throughout the effort, the Subcontractor must maintain alignment with NLR’s design‑to‑cost objectives and utilize Procore for all project documentation, including drawings, specifications, RFIs, and submittals. Construction Requirements All construction activities must comply with NLR’s safety, security, and environmental guidelines, including requirements for site access, personnel qualifications, and safe work practices. The Subcontractor is responsible for completing all utility locates before performing any excavation and must implement erosion control, material handling, and environmental protection measures as required. Waste prevention, recycling, and proper tracking of off‑site disposal activities must be performed in accordance with the SOW and associated exhibits. Management, Coordination, and Quality Assurance The Subcontractor shall provide qualified project management and on‑site supervision, maintain an approved Quality Assurance Plan, and participate in all required meetings, field observations, testing, and commissioning activities. The Subcontractor is responsible for coordinating deliveries, securing access authorization for personnel, and following all NLR and DOE security protocols. At project completion, the Subcontractor must deliver accurate as‑built documentation, testing records, and turnover materials in accordance with NLR standards and support NLR’s Beneficial Occupancy process.
-Solicitation11/11/2026
PROJECT: Lowline Area Burned Fence Construction Project -GMUG NF in Gunnison County, Colorado *******READ EACH OF THE DOCUMENTS THAT ARE LOCATED IN THE ATTACHMENTS/LINKS SECTION****************** POC'S: JANICE KING, CONTRACT SPECIALIST, at janice.king@usda.gov and LUCAS DAHLMAN, CONGTRACTING OFFICER, at lucas.dahlman@usda.gov Questions shall be submitted via email to Janice King at janice.king@usda.gov and to Lucas Dahlman at lucas.dahlman@usda.gov no later than November 16, 2026, at 9:00 a.m. Mountain Time. Quotes shall be submitted via email to Janice King at janice.king@usda.gov and to Lucas Dahlman at lucas.dahlman@usda.gov no later than December 3, 2026, at 9:00 a.m. Mountain Time. DESCRIPTION: The project will consist of constructing approximately 16,414 feet of four wire fence in the vicinity of the 2023 Low Line Fire, Gunnison County, Colorado. The purpose and need are to replace existing fences damaged by the 2023 Low Line Fire with a friendly wildlife fence and provide removal of old and damaged fence materials. See the SOW, SOI, SPECS and Diagram for more details. There is a Site Visit scheduled for this project for November 9, 2026, at 10:00 a.m.Mountain Time. Additional details regarding the Site Visit are located in this solicitation.
-Combined Synopsis12/03/2027
This is a fixed price solicitation set aside for Indian Small Business Economic Enterprises (ISBEE) firms. Tohaali Community School requires the front entrance sidewalk to be repaired to enhance student safety. The contractor will be responsible for supervision, labor, provision of equipment and materials, insurance, and transportation, in accordance with the statement of work provided. Project performance is expected within 30 days. The estimated magnitude of this project ranges from $25,000 to $100,000. Site visit will be schedule on Thursday, November 19, 2026, at 10:00 am. at the Tohaali Community School. Any questions related to this requirement must be submitted to the email listed in Section 3.1 above no later than: Wednesday, December 2, 2026, close of business. Technical and Price Quote due on Monday, December 14, 2026, close of business. Bid Bonding requirements apply to all quotes exceeding $35,000
-Combined Synopsis12/14/2026
The Red Wolf Recovery Program¿s Sandy Ridge Facility uses 16 holding pens to temporarily house red wolves and coyotes for treatment, acclimation, and other management needs. The facility¿s 2,500-foot double-perimeter fence has deteriorated over time, reducing its effectiveness at containing wildlife and preventing outside access. The project will remove the damaged inner fence, repair the existing outer fence, and remove one deteriorated holding pen to allow a section of fence to be relocated from standing water to higher ground.
-Pre-Solicitation11/24/2026

Additional Details

Solicitation Number

140P6318B0007

Archive Date

Oct 4, 2018

Office Address

Denver, CO, 80225