Notice ID: 6c5311ec6f13858708166963f50790e2Award NoticeAwarded
Z--CME Radio Building Rehabilitation
Awarded on September 24, 2018. Full description on SAM.gov.
Awarded tounder 140R6018P0068 (source: SAM.gov award notice)• $54.5K
Overview
- Posted
- September 26, 2018
- Notice type
- Award Notice
- NAICS
- 238990: All Other Specialty Trade Contractors
- Agency
- Department of the Interior
Notice details
- Place of performance
- Bureau of Reclamation <br />Wyoming Area Office<br />Attn: Tonya A. Pittsley<br />P.O. Box 1630<br />Mills<br />WY<br />82644<br />USA<br /> 82644 USA
- PSC
- Z: MAINT, REPAIR, ALTER REAL PROPERTY
- Last updated
- Sep 10, 2025
- Award date
- Sep 24, 2018
- Award amount (SAM.gov award notice)
- $54.5K
Identifiers
- Solicitation number
- 140R6018Q0065
- Notice ID
- 6c5311ec6f13858708166963f50790e2
- Award number (PIID)
- 140R6018P0068
Description
WCF-IGF::OT::IGF - Other Functions - WY-Casper Mountain East Radio Building Roof Rehabilitation
Award Overview
Award Number
140R6018P0068
Award Amount (SAM.gov award notice)
$54.5K
Award Date
Sep 24, 2018
Awardee
Awardee UEI
GYDZALWNJJL5
Original Solicitation
Notice ID: 6c5311ec6f13858708166963f50790e2
Posted Date: Sep 26, 2018
Original Response Deadline: Not specified
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
140R6018Q0065- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- Pre-SolicitationJul 16, 2018
Z--WCF-WY-CME Radio Building Rehabilitation
- SolicitationAug 7, 2018
Z--CME Radio Building Rehabilitation
- Pre-SolicitationAug 7, 2018
Z--CME Radio Building Rehabilitation
- AwardedCurrentSep 26, 2018
Z--CME Radio Building Rehabilitation
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
PGMB Security Gate - Amendment 3 extends the quote submission deadline from November 9 to November 23, 2026, at 2:00 PM MST. | - | Combined Synopsis | 11/23/2026 |
This description is intended to summarize the project at a high level for procurement purposes. Interested parties must refer to the full SOW for complete technical requirements, detailed scope elements, design and construction deliverables, environmental obligations, safety standards, and administrative procedures. The SOW governs all expectations for this procurement. Project Overview The National Laboratory of the Rockies (NLR) is soliciting design‑build services for installation of new perimeter fencing along the North boundary of the South Table Mountain (STM) Campus. The work includes designing and installing new fencing, removing designated sections of existing chain‑link fence, and completing all related construction activities in accordance with NLR’s design standards, construction specifications, and DOE site requirements. Portions of the work require coordination with the State Historic Preservation Office (SHPO). Interested parties must reference the full Statement of Work (SOW) for all detailed scope, technical requirements, and performance expectations. Design‑Build Requirements The Subcontractor shall develop and submit design documents consistent with NLR’s required 50% and 90% design reviews, followed by preparation of a complete 100% Issued‑for‑Construction package. All design work must comply with applicable codes, NLR Design Standards, and required CAD/BIM formats. Throughout the effort, the Subcontractor must maintain alignment with NLR’s design‑to‑cost objectives and utilize Procore for all project documentation, including drawings, specifications, RFIs, and submittals. Construction Requirements All construction activities must comply with NLR’s safety, security, and environmental guidelines, including requirements for site access, personnel qualifications, and safe work practices. The Subcontractor is responsible for completing all utility locates before performing any excavation and must implement erosion control, material handling, and environmental protection measures as required. Waste prevention, recycling, and proper tracking of off‑site disposal activities must be performed in accordance with the SOW and associated exhibits. Management, Coordination, and Quality Assurance The Subcontractor shall provide qualified project management and on‑site supervision, maintain an approved Quality Assurance Plan, and participate in all required meetings, field observations, testing, and commissioning activities. The Subcontractor is responsible for coordinating deliveries, securing access authorization for personnel, and following all NLR and DOE security protocols. At project completion, the Subcontractor must deliver accurate as‑built documentation, testing records, and turnover materials in accordance with NLR standards and support NLR’s Beneficial Occupancy process. | - | Solicitation | 11/11/2026 |
PROJECT: Lowline Area Burned Fence Construction Project -GMUG NF in Gunnison County, Colorado *******READ EACH OF THE DOCUMENTS THAT ARE LOCATED IN THE ATTACHMENTS/LINKS SECTION****************** POC'S: JANICE KING, CONTRACT SPECIALIST, at janice.king@usda.gov and LUCAS DAHLMAN, CONGTRACTING OFFICER, at lucas.dahlman@usda.gov Questions shall be submitted via email to Janice King at janice.king@usda.gov and to Lucas Dahlman at lucas.dahlman@usda.gov no later than November 16, 2026, at 9:00 a.m. Mountain Time. Quotes shall be submitted via email to Janice King at janice.king@usda.gov and to Lucas Dahlman at lucas.dahlman@usda.gov no later than December 3, 2026, at 9:00 a.m. Mountain Time. DESCRIPTION: The project will consist of constructing approximately 16,414 feet of four wire fence in the vicinity of the 2023 Low Line Fire, Gunnison County, Colorado. The purpose and need are to replace existing fences damaged by the 2023 Low Line Fire with a friendly wildlife fence and provide removal of old and damaged fence materials. See the SOW, SOI, SPECS and Diagram for more details. There is a Site Visit scheduled for this project for November 9, 2026, at 10:00 a.m.Mountain Time. Additional details regarding the Site Visit are located in this solicitation. | - | Combined Synopsis | 12/03/2027 |
The Red Wolf Recovery Program¿s Sandy Ridge Facility uses 16 holding pens to temporarily house red wolves and coyotes for treatment, acclimation, and other management needs. The facility¿s 2,500-foot double-perimeter fence has deteriorated over time, reducing its effectiveness at containing wildlife and preventing outside access. The project will remove the damaged inner fence, repair the existing outer fence, and remove one deteriorated holding pen to allow a section of fence to be relocated from standing water to higher ground. | - | Pre-Solicitation | 11/24/2026 |
Amendment 0002 to the Solicitation for Scaffolding for Repair and Repoint Chalmette Monument, Louisiana. See Amendment 0002 for details. | - | Combined Synopsis | 11/13/2026 |
Additional Details
Solicitation Number
140R6018Q0065
Archive Date
Oct 9, 2018
Office Address
DENVER, CO, 80225