Z1DA--Replace Roofs and Repair Facades Phase 1 at Northport VA Medical Center 79 Middleville RD, Northport, NY 11768

Overview

Response deadline
10:00 AM EDT
Posted
April 28, 2025
Notice type
Solicitation
NAICS
238160: Roofing Contractors
Agency
Department of Veterans Affairs

Notice details

Office
242-NETWORK CONTRACT OFFICE 02 (36C242)
Place of performance
Northport VA Medical Center 79 Middleville Road, Northport, 11768
Last updated
Nov 15, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
36C24225B0015
Notice ID
fdff85e81c6b4920a72959fd8c7e403b

Description

Replace Roofs and Repair Facades Phase 1; Solicitation No. 36C24225B0015; Project No. 632-16-103 at Northport VA Medical Center, 79 Middleville Rd, Northport, NY 11768. The purpose of this amendment is to provide responses to Request for Information (RFI) and Questions, RFIs and Questions responses are hereby included. Please see below for detailed information. Request for Information/Question Responses 1. Based on the proposed phasing plan, it shows that we ll be required to proceed with the front of Buildings 61 & 62 for phase 1, and the back of Buildings 61 & 62 or phase 2. Is there any way we would be able work on both the front & back of Buildings 61 & 62 concurrently? Response: As per contract documents, the Phase 1 is a streetside of the buildings 61&62 and the Phase 2 is a courtyard of the building 61&62. It was concerns of the extent of site disturbance, and if the GC could complete both sides concurrently which requires multiple dumpsters and staging on both sides of the building (due to the tunnels between buildings limiting the ease of access from one side of the building to the other). The construction work will proceed in accordance with the terms outlined in the existing contract. The GC will provide construction phasing during project submittal phase for approval. If we cannot work on the entirety of both buildings at once, would it be acceptable for phase 1 to completely finish Building 61, and then move to Building 62 for phase 2? Response: See response above. 2. Can you please provide the most recent asbestos / lead report? Response: See attached Environmental Report. 3. Can the Superintendent fulfill the Quality Control Manager (QCM) role? Response: The project superintendent will be held responsible for the equality of work. The QCM or CQC System manager should be on the site at all times during construction and is employed by the GC. It shall be provided alternate to serve in the event of the SDQC manager s absence. The requirements for alternate the same as for CQC Manager. 4. Is the QCM required to be onsite full-time, or can they make site visits as required for inspections? Response: See response above. 5. Can the Superintendent fulfill the Site Safety & Health Officer (SSHO) role? Response: The Competent person to fulfill the Site Safety & Health Officer (SSHO) role can have collateral duties as the superintendent. 6. What is the actual linear footage for the repointing? Response: Per the G002 General Notes F & G Contactor to verify all site dimensions and existing conditions prior to work occurring. Contractors shall report any discrepancies to the govt prior to starting construction. Commencement of the work by the contractor shall imply his acceptance of all existing conditions. contractor shall verify all conditions and dimensions at the job site prior to the star of construction 7. What is the actual linear footage for the rebricking? Response: Per the G002 General Notes F & G Contactor to verify all site dimensions and existing conditions prior to work occurring. Contractors shall report any discrepancies to the govt prior to starting construction. Commencement of the work by the contractor shall imply his acceptance of all existing conditions. contractor shall verify all conditions and dimensions at the job site prior to the star of construction 8. What is the actual linear footage for the lintels? Response: Per the G002 General Notes F & G Contactor to verify all site dimensions and existing conditions prior to work occurring. Contractors shall report any discrepancies to the govt prior to starting construction. Commencement of the work by the contractor shall imply his acceptance of all existing conditions. contractor shall verify all conditions and dimensions at the job site prior to the star of construction Lintel quantities and approx. sizes are notes on the Hazardous Materials Lead sheets (HL100 thru HL107) 9. What is the actual linear footage of the windowsills? Response: Per the G002 General Notes F & G Contactor to verify all site dimensions and existing conditions prior to work occurring. Contractors shall report any discrepancies to the govt prior to starting construction. Commencement of the work by the contractor shall imply his acceptance of all existing conditions. contractor shall verify all conditions and dimensions at the job site prior to the star of construction 10. Does this scope require pipe scaffolding for safety, or will a lift be acceptable in some areas? Response: Per specification, the scaffolding shall be as approved by a professional engineer contracted by the GC. Therefore, the GC s engineer would need to review and advise. Please note Scaffolding requirements are further noted within spec section 01 35 26 as well as within G002 demo notes U , V , & AK 11. Please confirm if the replacement roof will require a 10, 20, or 30 year warranty. Response: All warranty requirements are as noted within the specifications. Per spec section 07 31 13 ASPHALT SHINGLES section 1.7 warranty notes a 30 year warranty as well as wind & algae warranty requirements. Per spec section 07 53 23 EPDM Roofing section 1.10 warranty notes a 30 year warranty. 12. Sign-in Sheet Request. Response: No Further Questions.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Yingjie Yeung
Contract Specialist

Documents

Files (9)

  • Environmental Report 21-1742 The Pettit Group - Buildings 61 62.pdf

    3.2 MBAdded in Solicitation version 3Posted
    Download
  • 36C24225B0015 0001.docx

    436 KBAdded in Solicitation version 3Posted
    Download
  • Attachment 6 - Wage Determination__Suffolk County__New York.pdf

    45 KBAdded in Solicitation version 2Posted
    Download
  • Attachment 5 Participation Goals for Minorities and Females.pdf

    414 KBAdded in Solicitation version 2Posted
    Download
  • Attachment 4 632-16-103 RoofFacadePhase1 SPECS.pdf

    3.4 MBAdded in Solicitation version 2Posted
    Download
  • Attachment 3 632-16-103 RoofFacadePhase1 Drawings.pdf

    24 MBAdded in Solicitation version 2Posted
    Download
  • Attachment 2 52.225-2 Buy American Certificate.pdf

    124 KBAdded in Solicitation version 2Posted
    Download
  • Attachment 1 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING CERTIFICATION.pdf

    158 KBAdded in Solicitation version 2Posted
    Download
  • 36C24225B0015_1.docx

    137 KBAdded in Solicitation version 2Posted
    Download

Lifecycle

  1. 1
    Version 1SolicitationArchived

    Z1DA--Replace Roofs and Repair Facades Phase 1 at Northport VA Medical Center 79 Middleville RD, Northport, NY 11768

    Notice 189a45def1c34f688147b42387f8fe47 on SAM.gov

  2. 3
    Version 3SolicitationArchivedCurrent

    Z1DA--Replace Roofs and Repair Facades Phase 1 at Northport VA Medical Center 79 Middleville RD, Northport, NY 11768

    Notice fdff85e81c6b4920a72959fd8c7e403b on SAM.gov

Other notices for this solicitation

  1. Pre-SolicitationRelated noticeFeb 13, 2025

    Z1DA--Replace Roofs and Repair Facades Phase 1 at Northport VA Medical Center 79 Middleville RD, Northport, NY 11768

    Notice 4fc43a01c424465995ed43a127ed17e8 on SAM.gov