GovChime
Notice ID: 7201f349d29a4d4584c6ad802a3a9a69SolicitationArchived

Storage Aid System at Grissom ARB, IN, Building 209

Archived on September 23, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
4:00 PM EDT
Posted
September 3, 2025
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
333922: Conveyor and Conveying Equipment Manufacturing
Agency
Department of WarDepartment of the Air Force

Notice details

Office
FA8601 AFLCMC PZIO
Place of performance
Grissom ARB, 46971
Last updated
Nov 8, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
FA860425RB032
Notice ID
7201f349d29a4d4584c6ad802a3a9a69

Description

Mechanized Material Handling Systems (MMHS) and Storage Aid Systems (SAS) include commercial off the shelf (COTS) and modified COTS products configured for the mission needs of customers Air Force (AF) wide. MMHS and SAS are provided with the goal of improving the productivity, quality, and customer service of AF supply chain management functions. MMHS and SAS designs aim to modernize and equip existing and new facilities, increase efficiency in the flow of materials, consolidate operations, reduce operating costs, prevent material damage, improve safety, and reduce personnel requirements. The systems shall include the design, delivery, installation, testing, and orientation to provide a turn-key system. This is a solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. Solicitation Number FA8604-25-R-B032 is issued as a Request for Proposal (RFP). This solicitation document incorporates provisions and clauses in effect through Federal Acquisition Circular 2024-03/02-23-2024 and DPN 20240326. This acquisition is 100% set aside for small business. The NAICS CODE for this solicitation is 333922. This solicitation is subject to FAR Clause 52.219-14, Limitations on Subcontracting (DEVIATION 2020-O0008). FAR Clause 52.219-14 states that, for Supplies, (other than procurement from a non-manufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 50 percent subcontract amount that cannot be exceeded.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (17)

  • VGR301- Appendix F- Support Equipment (REV1).pdf

    154 KBAdded in Solicitation version 5Posted
    Download
  • Grissom MMHS RFI Response Log.xlsx

    14 KBAdded in Solicitation version 5Posted
    Download
  • VGR301- Contractor Information.pdf

    82 KBAdded in Solicitation version 2Posted
    Download
  • Solicitation - FA860425RB032.pdf

    2.3 MBAdded in Solicitation version 1Posted
    Download
  • Combo Synopsis-Solicitation (Grissom MMHS).pdf

    230 KBAdded in Solicitation version 1Posted
    Download
  • Cover Purchase Description.pdf

    238 KBAdded in Solicitation version 1Posted
    Download
  • Technical Proposal Questionnaire.pdf

    139 KBAdded in Solicitation version 1Posted
    Download
  • Appendix A- Pallet Rack.pdf

    161 KBAdded in Solicitation version 1Posted
    Download
  • Appendix B- Cantilever Rack.pdf

    162 KBAdded in Solicitation version 1Posted
    Download
  • Appendix C- Bin shelving.pdf

    158 KBAdded in Solicitation version 1Posted
    Download
  • Appendix D- Rider Reach.pdf

    194 KBAdded in Solicitation version 1Posted
    Download
  • Appendix E- Orderpicker.pdf

    234 KBAdded in Solicitation version 1Posted
    Download
  • Appendix F- Support Equipment .pdf

    152 KBAdded in Solicitation version 1Posted
    Download
  • Appendix G- Removal of Existing Equipment.pdf

    2.2 MBAdded in Solicitation version 1Posted
    Download
  • VGR301-01.pdf

    45 KBAdded in Solicitation version 1Posted
    Download
  • VGR301-02.pdf

    23 KBAdded in Solicitation version 1Posted
    Download
  • Addendums.pdf

    537 KBAdded in Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1SolicitationArchived

    Storage Aid System at Grissom ARB, IN, Building 209

    Notice 19883352f78844478b66709a8e7ceda9 on SAM.gov

  2. 2
    Version 2SolicitationArchived

    Storage Aid System at Grissom ARB, IN, Building 209

    Notice cc8ed925448047f18939c1aee2a28495 on SAM.gov

  3. 3
    Version 3SolicitationArchived

    Storage Aid System at Grissom ARB, IN, Building 209

    Notice c6af1c2b9fda4f289adc45c9328b413d on SAM.gov

  4. 5
    Version 5SolicitationArchivedCurrent

    Storage Aid System at Grissom ARB, IN, Building 209

    Notice 7201f349d29a4d4584c6ad802a3a9a69 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

FA860425RB032

Archive Date

Sep 23, 2025