Upgrade UPS & Cooling System
Cancelled on SAM.gov (notice posted June 9, 2026). Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 AM MDT
- Posted
- June 9, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 335999: All Other Miscellaneous Electrical Equipment and Component Manufacturing
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- NATIONAL GUARD BUREAU.JFHQ USPFO WY.USPFO WY PROCUREMENT.W7N9 USPFO ACTIVITY WYANG 153
- Place of performance
- Cheyenne, Wyoming, 82009
- PSC
- 6150: MISCELLANEOUS ELECTRIC POWER AND DISTRIBUTION EQUIPMENT
- Last updated
- Oct 30, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W50S8W-26-Q0001
- Notice ID
- 049bb950f6c24886858645fd4e14f730
Description
The vendor shall provide un-installation of outdated equipment
and installation of brand-new items according to acceptable standards. Contractor
shall provide Uninterruptible Power and Cooling Distribution Unit replacement/
installation and a Site Lead/Project Manager to provide the following critical tasks to
support to the WYANG per the PWS.
• 5.3.3 Capture existing cooling fluid/Re-fill system with cooling fluid.
• 5.3.4 Demo existing piping
• 5.3.5 Run new Pex piping to the in-row coolers.
• 5.3.6 Furnish & install new 350A shut Trip Breaker with nema-1 Enclosure.
Tie existing EPO into new Shunt Trip breaker.
• 5.3.7 Existing 3” Feeder conduit & wire fed from MDP will be shutdown &
locked out. Intercept existing Feeder to line side of new 350A Shunt Trip
Breaker/Enclosure. Install Load side Feeder conduit & wire from new Shunt
Trip Breaker to new UPS.
• 5.3.8 Demo existing UPS, remove from Data Center, Dispose/recycle old
UPS.
• 5.3.9 Install Power Modules and Battery Cabinets
• 5.3.10 Assume the existing structural integrity of raised floor is sufficient to
move old UPS across floor & new UPS installed at old UPS location. All
raised floor modifications by others.
SITE VISIT: 10 JUNE 2026 AT 1300 MDT at 217 Dell Range Blvd, Cheyenne, WY 82009 - IF NO REQUEST FOR SITE VISIT ARE RECIEVED BY 08 JUNE 2026 AT 1200 MDT, IT WILL BE CANCELED.
QUESTIONS DUE: 12 JUNE 2026 AT 1000 MDT
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
Files (4)
- Download
B.08 ATTCH #3 WAGE DETERMINATION.pdf
251 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
B.08 ATTACH #2 PWS.pdf
380 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
B.08 ATTCH #1 CLAUSES.pdf
30 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
B.08 CS UPS & COOLING SYSTEM - Combo (26-Q-0001).pdf
173 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
Upgrade UPS & Cooling System
- 2Version 2Combined Synopsis/SolicitationCancelledArchivedCurrent
Upgrade UPS & Cooling System
Similar Opportunities
Additional Details
Solicitation Number
W50S8W-26-Q0001
Archive Date
Jul 15, 2026
Office Address
CHEYENNE, WY, 82009-4799