B-2 Brake Metering Valve Remanufacture
Archived on February 19, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM MST
- Posted
- February 2, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- No Set aside used
- NAICS
- 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- AIR FORCE MATERIEL COMMAND.AIR FORCE SUSTAINMENT CENTER.FA8203 AFSC PZAAB
- Place of performance
- Hill Air Force Base, Utah, 84056
- PSC
- 4820: VALVES, NONPOWERED
- Last updated
- Nov 3, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- FA8203-26-R-0005
- Notice ID
- 3b80dcb1a1ff4b8aab898d3b7f61b982
Description
B-2 Brake Metering Valve Remanufacture. See attached RFP and associated documents
Amendment_0001:
The purpose of this amendment is to:
1) SOW dated 15 Jan 2026 is hereby established/incorporated. This version will supersede previous version dated 16 Dec 2025, in its entirety. The SOW is revised to make administrative changes (format, section numbering, CDRL references, etc).
2) CDRLs A/B/C 002 through A/B/C 011 have been updated. CDRLs are revised to make administrative changes.
3) CAV_AF reporting requirement document is established/incorporated to support the CDRL requirements.
THE RFQ CLOSING DATE REMAINS UNCHANGED AS A RESULT OF THIS AMENDMENT ALL OTHER TERMS AND CONDITIONS OF THE RFQ REMAIN UNCHANGED AND INEFFECT
Award Overview
No prior contract identified
No matching prior contract was found within an 18-month window using the same agency, NAICS, place-of-performance state, and PSC. This may be a new requirement, or the prior award uses a different classification.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (10)
- Download
FA8203-26-R-0005 (RQR Sol Ver).pdf
595 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
FA8203-26-R-0005 (Packaging).pdf
433 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
FA8203-26-R-0005 (SOW Packaging).pdf
368 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
FA8203-26-R-0005 (IUID Checklist).pdf
156 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
FA8203-26-R-0005 (RDL).pdf
79 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
FA8203-26-R-0005 (GFP).pdf
88 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
FA820326R0005_______0001.pdf
35 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
FA8203-26-R-0005_0001 CDRLs_1_15_2026.pdf
1.6 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
FA8203-26-R-0005_0001 CAV_AF_Reporting.pdf
249 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
FA8203-26-R-0005_0001 SOW_1_15_2026.pdf
327 KBAdded in Combined Synopsis/Solicitation version 3Posted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
B-2 Brake Metering Valve Remanufacture
- 3Version 3Combined Synopsis/SolicitationArchivedCurrent
B-2 Brake Metering Valve Remanufacture
Similar Opportunities
Title | Phase | Deadline |
|---|---|---|
Additional Details
Solicitation Number
FA8203-26-R-0005
Archive Date
Feb 19, 2026
Office Address
HILL AFB, UT, 84056-5825