Notice ID: 513380077c584a1d82688f0fc6be3721Award NoticeAwardedArchived

J041--Chiller Plant Maintenance

Awarded on May 1, 2026. Full description on SAM.gov.

Awarded tounder 47QSWA20D002A36C25026F0407 (source: SAM.gov award notice)• $1.3M

Overview

Posted
May 5, 2026
Notice type
Award Notice
NAICS
334290: Other Communications Equipment Manufacturing
Agency
Department of Veterans Affairs

Notice details

Office
250-NETWORK CONTRACT OFFICE 10 (36C250)
Place of performance
Department of Veterans Affairs Louis Stokes Cleveland VA Medical Center, Cleveland, Ohio, 44106
Last updated
Oct 30, 2026
First published
Last updated on SAM.gov
Award date
May 1, 2026
Award amount (SAM.gov award notice)
$1.3M

Identifiers

Solicitation number
36C25026Q0354
Notice ID
513380077c584a1d82688f0fc6be3721
Award number (PIID)
47QSWA20D002A36C25026F0407

Description

Description This is a Request for Quotes (RFQ) for commercial items prepared in accordance with the format in RFO Federal Acquisition Regulation (FAR) Part 12, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation. This solicitation is issued as an RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular: 2025-06. The associated North American Industrial Classification System (NAICS) code for this procurement is 238220 Plumbing, Heating, and Air-Conditioning Contractors with a small business size standard of $19 Million. The FSC/PSC is J041 Maintenance, Repair and Rebuilding of Equipment: Refrigeration, Air Conditioning, and Air Circulating Equipment. Contracting Office Address Department of Veterans Affairs Network Contracting Office (NCO) 10 3140 Governor s Place Blvd. Suite 210 Kettering, Ohio 45428

Full description on SAM.gov

Award Overview

Award Number

47QSWA20D002A36C25026F0407

Award Amount (SAM.gov award notice)

$1.3M

Award Date

May 1, 2026

Awardee

Awardee UEI

QJFJBF8ZBUM8

Awardee CAGE Code

60532

Awardee Address

WHITE BEAR LAKE, MN 55110, MN

Line Item Number

165

Original Solicitation

Notice ID: 513380077c584a1d82688f0fc6be3721

Posted Date: May 5, 2026

Original Response Deadline: Not specified

Contract Details

Contract data not yet available

Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.

Contacts

Contracting Officer

Primary Contact

Chad Kemper
Contracting Officer

Documents

Files (4)

  • Wage Determination 2015-4727.pdf

    4.8 MBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • 36C25026Q0354.pdf

    895 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • 47QSWA20D002A 36C25026F0407_1.docx

    13 KBAdded in Award Notice version 6Posted
    Download
  • 36C25026Q0354_1.docx

    16 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download

Lifecycle

  1. 4
    Version 4Combined Synopsis/SolicitationArchived

    J041--Chiller Plant Maintenance 11/01/2025 36C25021C0041 Follow On - Chad Kemper

    Notice 21bed580b5c64c24bae57f065b5ee477 on SAM.gov

  2. 6
    Version 6Award NoticeArchivedCurrent

    Type changed from Combined Synopsis/Solicitation to Award Notice

    J041--Chiller Plant Maintenance

    Notice 513380077c584a1d82688f0fc6be3721 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Pre-solicitation notice for Chiller Plant Preventative Maintenance at the Richarde L. Roudebush VA Medical Center, 1481 W. 10th Street, Indianapolis, IN 46202.
68%
Pre-Solicitation08/21/2026
Replace Chillers in AHUs 1 & 2 558-22-172
62%
AwardedOpen
STATEMENT OF WORK Project Number: 558-22-172 Replace Chillers for AHU 1 and 2 Scope: The scope of work shall generally consist of but not limited to the following: providing all labor, materials, tools, equipment, permits, testing, and reports required to complete the replacement of chillers that serves AHU 1 and 2 and associated equipment and structural upgrades as shown in the drawings and specifications. Construction Period - Pre-Construction Meeting: Contractor shall participate in and facilitate a Pre-Con in conjunction with the Contracting Officer, COR, A&E, and building stakeholders as needed. Contractor to hold weekly Construction Progress Meetings via Microsoft Teams or in-person and include the COR and CO as principal participants. Contractor provides Meeting Minutes within no less than 7 days following each Construction Progress Meeting. As-Built Drawing Submission: Provide Red-line drawings to A/E that include the contractor’s mark-ups in PDF formats. Hours of Operation and Phasing: Construction should be phased and timed such that: General Operation of the affected areas is not interrupted The facility operates on a 24-hour, 7 day per week schedule Contractor will conduct operations during 1st, 2nd and 3rd shifts such that minimal interruption of function occurs. 1st shift construction activities will be allowed with approval of the COR. Contractor to develop and coordinate phasing plan with input from staff and final approval of COR. Any construction work that necessitates a utility outage must be scheduled for the second shift or during the weekend. Please coordinate all shutdowns with the VA COR and submit a written shutdown request at least 20 days in advance of the proposed shutdown date. Storage: No storage of any material will be allowed on VA property unless approved by the COR. Period of Performance: Contractor shall complete this project no later than 270 days after issue of notice to proceed (NTP). Utility and System or Service Outages: No utility services such as water, gas, steam sewers or electricity, parking, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized in accordance with VA Lock-out Tag-out requirements. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the Medical Center Director’s prior knowledge and written approval. The contractor shall submit a request to interrupt any such services to COR, in writing, 20 days in advance of proposed interruption. General Requirements The contractor’s employees shall not enter the work site without appropriate badges and identification. They may also be subject to inspection of their personal effects when entering or leaving the project site. Execute work to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied jointly by patients or medical personnel, and Contractor’s personnel, except as permitted by COR where required by limited working space. Means of Egress: Do not block existing egress for occupied buildings, including paths from exits to roads per NFPA 101 and VA requirements. Minimize disruptions and coordinate with COR. All buildings will be occupied during performance of work. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the installation period. Hot Work: Perform and safeguard hot work operations in accordance with NFPA 241 and NFPA 51B. Coordinate with COR. Obtain permits from facility Safety Manager at least 48 hours in advance. New work shall be installed and connected to existing work neatly, safely and professionally. Contractor to coordinate periodic VA inspection to ensure satisfactory workmanship of GC and Subcontractors. Any portion of the VAMC that is disturbed or damaged shall be replaced or repaired to its prior condition. The contractor is required to notify the COR upon arrival and departure of personnel at the work site every day work is performed during the execution of this project. END OF SCOPE OF WORK
62%
Solicitation08/27/2026
62%
AwardedOpen
62%
AwardedOpen

Additional Details

Solicitation Number

36C25026Q0354

Archive Date

Jul 4, 2026

Office Address

DAYTON, OH, 45428