GovChime
Notice ID: 6ca6f2a8671e4d7cb5522a7c45c41902SolicitationArchived

Noyes Cut Ecosystem Restoration Phase Two

Archived on August 27, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM EDT
Posted
August 14, 2025
Notice type
Solicitation
Set-aside
No Set aside used
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W074 ENDIST SAVANNAH
Place of performance
Brunswick
Last updated
Nov 9, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W912HN25B5008
Notice ID
6ca6f2a8671e4d7cb5522a7c45c41902

Description

The abstract is posted as of 14 August 2025. Amendment 0002: changes the bid submission location from PIEE to the Contract Specialist and Contracting Officer email addresses. SEE INSTRUCTIONS TO BIDDERS #9 (SUBMISSION OF BID INSTRUCTIONS) Amendment 0001: publishes Pre-Bid Conference slides, Attendee List and updated specs and drawings(posted 18July), The contractor will be required to close one man-made cut in the salt marsh north of the Satilla River in Camden County, GA: Noyes Cut (approximate location: 31.0101 N, 81.5466 W). This work is part of the Noyes Cut Ecosystem Restoration Project and has the objective of increasing tidal exchange throughout the system, restoring salinity gradients to Dover Creek, and reducing shoaling in Umbrella Creek. The site is remote and only accessible by water. It is located approximately 10 linear miles south of Brunswick, GA and is 11 linear miles from the Woodbine boat ramp located at 103 E 1st St, Woodbine, GA, 31569 and 8 linear miles from the Tidelands Nature Center boat ramp located at 100 S Riverview Dr, Jekyll Island, GA 31527. The site is subject to large tidal variations typical to the GA coast and the site may not be accessible at all tide stages for all types of equipment. The contractor will verify site accessibility for selected equipment. Vessel traffic in the vicinity of the site is expected to be minimal and limited to occasional recreational boaters and small commercial crab fishing boats. The cut closure structure will consist of a trapezoidal rubble mound-type structure with a 3:1H:V slope and an approximately length of 495 ft at Noyes Cut. The width at the crest will be approximately 6 ft for each structure. The structure will be made entirely of GDOT Type I riprap. The current estimate for rock quantities is approximately 21,000 tons for Noyes Cut. The contractor will be responsible for furnishing, stockpiling, and placement of all rock. The rock will be carefully placed within the template using approved equipment in a manner to produce a wellgraded mass of rock and to minimize impacts to fish and wildlife. The contractor will install aids to navigation consisting of signs and other markings mounted on pile foundations at each cut closure location.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (8)

  • W912HN25B5008 Noyes Cut Phase 2 OFFICIAL BID ABSTRACT.pdf

    169 KBAdded in Solicitation version 8Posted
    Download
  • Noyes Cut Phase 2_Amendment 0002 Mod Copy W912HN25B5008.pdf

    609 KBAdded in Solicitation version 6Posted
    Download
  • Noyes Cut Phase 2 Pre-Bid Conference Attendees (MS Teams).pdf

    36 KBAdded in Solicitation version 5Posted
    Download
  • Noyes Cut Phase 2 Pre-Bid Conference Slides.pdf

    2.5 MBAdded in Solicitation version 5Posted
    Download
  • Noyes Cut Phase 2_Amendment 0001 Mod Copy W912HN25B5008.pdf

    358 KBAdded in Solicitation version 5Posted
    Download
  • W912HN-25-B-5008_SPECS.pdf

    22 MBAdded in Solicitation version 4Posted
    Download
  • W912HN-25-B-5008_DRAWINGS.pdf

    13 MBAdded in Solicitation version 4Posted
    Download
  • Solicitation Noyes Cut Phase II_W912HN25B5008.pdf

    1.4 MBAdded in Solicitation version 2Posted
    Download

Lifecycle

  1. 3
    Version 3PresolicitationArchived

    Noyes Cut Ecosystem Restoration Phase Two

    Notice 24db63f4a3824c4ea5b466e0f172ba62 on SAM.gov

  2. 2
    Version 2SolicitationArchived

    Type changed from Presolicitation to Solicitation

    Noyes Cut Ecosystem Restoration Phase Two

    Notice 82758c05b50248e48137b01ffe4e98cb on SAM.gov

  3. 4
    Version 4SolicitationArchived

    Noyes Cut Ecosystem Restoration Phase Two

    Notice 5d001e2dfdf043dca8cb761d4c6b9e19 on SAM.gov

  4. 5
    Version 5SolicitationArchived

    Noyes Cut Ecosystem Restoration Phase Two

    Notice 76a0849d19904a6d8665cb2bcb5d13cb on SAM.gov

  5. 6
    Version 6SolicitationArchived

    Noyes Cut Ecosystem Restoration Phase Two

    Notice e1ae00472d8b43dd929945f2ad6ecedf on SAM.gov

  6. 8
    Version 8SolicitationArchivedCurrent

    Noyes Cut Ecosystem Restoration Phase Two

    Notice 6ca6f2a8671e4d7cb5522a7c45c41902 on SAM.gov

  7. 11
    Version 11Award NoticeArchived

    Type changed from Solicitation to Award Notice

    Noyes Cut Ecosystem Restoration Phase Two

    Notice e14b7693ec40483193055a6b65f73c35 on SAM.gov

Other notices for this solicitation

  1. Pre-SolicitationRelated noticeJun 16, 2025

    Noyes Cut Section 1135 Ecosystem Restoration Phase II

    Notice ef851994b7244296b2cea904f106611b on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912HN25B5008

Archive Date

Aug 27, 2025