PLA Market Survey: FTC Unaccompanied Enlisted Personnel Housing Barracks FY26 & FY27
Archived on September 30, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM EDT
- Posted
- June 23, 2026
- Notice type
- Sources Sought
- Set-aside
- No Set aside used
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION GREAT LAKES AND OHIO.ENDIST LOUISVILLE.W072 ENDIST LOUISVILLE
- Place of performance
- Fort Campbell, Kentucky
- Last updated
- Oct 29, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W912QR-26-UEPH-FY26_FY27
- Notice ID
- f8a3a986b8a143aaa501cc0b10f1e498
Description
W912QR-26-UEPH-FY26_FY27
Description: The Corps of Engineers Louisville District is soliciting comments from the construction community addressing the potential use of Project Labor Agreements (PLAs) from large scale construction projects (exceeding $35 million) for projects consisting of interior and exterior modernization, renovation, and repair of existing residential/commercial construction projects.
The proposed project is to construct two (2) standard design barracks to accommodate 260 unaccompanied enlisted personnel. Primary facilities include living and sleeping quarters, baths, storage, service areas, building, information systems, fire protection and alarm systems, antiterrorism measures, intrusion detection system (EDS), installation and Energy Monitoring Control Systems (ECMS) connection. Supporting facilities include site development, utilities and utility connections, exterior lighting, paving, sidewalks, curbs and gutters, storm drainage, landscaping and signage. Heating and air conditioning will be provided by self-contained system for each living quarters unit along with a central system for common areas. Post construction award services (PCAS) will be provided. Utility connections are required to a privatized electric distribution, natural gas, water, and wastewater systems. Measures in accordance with the Department of Defense (DoD). Minimum antiterrorism for buildings standards will be provided. Building furnishings related interior design services are required. Access for individuals with disabilities will be provided. Cyber security measures will be incorporated into this project. Sustainability/energy measures will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoD’s UFC 1-200-02 including energy efficiencies, building envelope and integrated building systems performance. Demolish two buildings at Ft. Campbell (6,389 total SF).
A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C. 158(f). Federal Acquisition Regulation (FAR) Policy:
Federal Acquisition Regulation (FAR) Policy: Pursuant to Executive Order 14063 and FAR Subpart 22.5, it is the policy of the Federal Government to require the use of Project Labor Agreements (PLAs) on large-scale construction projects (exceeding $35 million) to promote economy and efficiency in Federal procurement. An agency may grant an exception to this requirement only under specific circumstances defined in FAR 22.504(d), such as if a PLA would substantially reduce the number of potential offerors to such a degree that the Government cannot meet its requirements at a fair and reasonable price, or if the project involves specialized construction work available from only a limited number of contractors
In consideration of the above factors, and any others which may be deemed appropriate, the construction community is invited to comment on the use of PLAs. Of particular interest to the Government are responses to the following questions:
1) Do you have knowledge that a PLA has been used in the local area on projects of this kind? If so, please provide supporting documentation.
2) Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project? If so, please elaborate and provide supporting documentation where possible.
3) Are you aware of time sensitive issues/scheduling requirements that would affect the rate at which the referenced project should be completed? If so, please elaborate and provide supporting documentation where possible.
4) Identify specific reasons why or how you believe a PLA would advance the Federal Governments interest in achieving economy and efficiency in federal procurement.
5) Identify specific reasons why you do not believe a PLA would advance the Federal Governments interest in achieving economy and efficiency in federal procurement.
6) Identify any additional information you believe should be considered on the use of a PLA on the referenced project.
7) Identify any additional information you believe should be considered on the non-use of a PLA on the referenced project.
8) Would a PLA requirement substantially reduce the number of potential offerors (including subcontractors) for this project? If yes, please explain how your ability to secure necessary subcontractors would be impacted.
9) Does this project require highly specialized construction work? If so, is this specialized work available from both union and non-union contractors in the local area? Please explain.
10) What is the anticipated cost impact (increase or decrease) of implementing a PLA for this specific project at Ft. Campbell? Please provide an estimated percentage impact and explain the driving factors.
11) How likely are you to submit a proposal on this project if a PLA is required (choose a response):
1 – My company will not submit a proposal if PLA is required.
2 – My company only plans to submit a proposal if PLA is required.
Please provide your comments via e-mail to Ranzel Merideth at Ranzel.L.Merideth@usace.army.mil no later than 1:00 PM EST on 23 June 2026.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
- 1Version 1Sources SoughtArchived
PLA Market Survey: FTC Unaccompanied Enlisted Personnel Housing Barracks FY26 & FY27
- 2Version 2Sources SoughtArchived
PLA Market Survey: FTC Unaccompanied Enlisted Personnel Housing Barracks FY26 & FY27
- 4Version 4Sources SoughtArchivedCurrent
PLA Market Survey: FTC Unaccompanied Enlisted Personnel Housing Barracks FY26 & FY27
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
***ADDRESS HAS BEEN UPDATED in the LOCATION/LOGISTICS SECTION*** The U.S. Army Corps of Engineers (USACE) Louisville District is issuing this special notice to announce an Industry Day for upcoming construction requirement for Construction of a 300-member Army Reserve Center (ARC) at Defense Supply Center, Richmond, VA. The Louisville District is considering Construction Manager at Risk (CMAR) under 10 USC §2808a Other Transaction Authority for this requirement. This notice is for informational and planning purposes to allow interested parties to prepare for and provide feedback prior to the official Request for Qualifications (RFQ) release. INDUSTRY DAYS USACE intends to conduct an Industry Day on 19 November 2026 at 0900 Eastern Time to provide an overview of the project, potential acquisition strategy, and anticipated requirements. This event will provide interested parties with an opportunity to gain additional insight into the project and potential Construction Manager at Risk (CMAR) approach under an Other Transaction (OT) framework, ask questions, and provide input in advance of the official RFQ release. General questions from industry participants will be permitted during the Industry Day; however, all discussions and responses provided during the event are considered unofficial and for informational purposes only. Statements made during the Industry Day do not constitute commitment, authorization, or binding guidance related to the future RFQ. Official Questions and Answers (Q&A) will be accepted and addressed following the release of the RFQ. Contractors and subcontractors interested in participating are requested to submit their Name, Company Name and contact information (email and phone) to the USACE Contracting Specialist no later than 1600 on 17 November 2026. Please use the information below to request Installation/Base access: Step 1: Badge Requests: To obtain pass/badge for one day or more, the contractor shall complete DBIDS pre-registration online using the following link DBIDS Pre-Enrollment or at https://dbids-global-enroll.dmdc.mil/preenrollui/#/landing-page. Once pre-registration has been complete, the visitor/contractor shall record and send the QR code/alpha-numeric code as a PDF/screenshot to the COR/PM via email (if multiple people are visiting or being vetted, the contractor shall compile all QR/alpha-numeric codes into a single email) at least 5 business days prior to visit/start date. The contractor shall include requested dates, times and names of personnel in the email. Failure to provide all the above information may lead to delays in requests being processed which could result in missed site visits, meetings etc. The COR/PM will notify the contractor upon their approval or denial. If approved, the contractor will have 30 days to pick up their visitor pass or project badge. When picking up the project badge the contractor is required to present their QR or alphanumeric code along with a valid form of ID. When filling out the QR code form, for the Service Site - select All. State – Virginia. Filter – Defense Logistics Agency Richmond. Note, a valid DOD ID card (Retired military, CAC etc.) is NOT permitted to be used to enter DCSR for commercial purposes. Step 2: Send a copy of their QR codes to Steven.Hall@DLA.MIL and he can forward them to security for vetting. Usually security will get back within a day or two of the submittal and let me know if they’ve been approved or not and then they are able to come and pick up a badge at the pass office. LOCATION/LOGISTICS Industry Day Presentation Location: 6090 Strathmore Road (Bldg 70), North Chesterfield, VA 23237 (Red, brick building with a large chimney right past the visitors center when you enter the gate) NOTE: Onsite parking space may be limited, overflow parking is available in the vicinity. PROJECT OVERVIEW Project Title: Construction of Army Reserve Center (ARC) Location: Richmond, Virginia Agency: U.S. Army Corps of Engineers, Louisville District NAICS Code: 236220 PROJECT DESCRIPTION Primary facilities include a 56,500 SF Army Reserve Center and 1200 SF Unheated Storage Building. Facilities will be designed in accordance with the Army Reserve Design Guide. Supporting facilities include land clearing, general site improvements, lighting, walks, signage, curbs and gutters, storm drainage, paving, information systems, and utility connections. Sustainability/Energy and cybersecurity measures are included. All fixtures, furnishings, and equipment will be provided. Antiterrorism force protection and physical security measures will be incorporated into the design including minimum standoff distances from roads, parking areas and vehicle unloading areas. Access for individuals with disabilities will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria 1-200-02 including energy efficiencies, building envelope and integrated building systems performance. The project contains options such as: Bona fide need collateral equipment. The Contract Duration is estimated at 790 calendar days from Notice to Proceed on Construction Award. ACQUISITION STRATEGY – PRE-AWARD USACE, Louisville District plans to use a streamlined competitive selection process: Step 1 – White Papers/Qualification Statements: Interested parties will submit a Statement of Qualifications (max # of pages to be defined in formal RFQ. Following evaluation of the qualification packages, the Government intends to down-select a target of three (3) highest qualified firms to proceed to Step 2. Step 2 – Pitch Presentations: Down-selected firms will participate in live pitch meetings. One company will be selected as the Construction Manager for negotiation and award of Agreement 1 for preconstruction services. The Government intends to negotiate a Guaranteed Maximum Price (GMP) for construction of the ARC, which will be added as a bilateral modification at a later date. ACQUISITION STRATEGY – AWARD The agreement would be awarded to the most qualified Construction Manager at Risk (CMAR) to provide preconstruction services and construction. Phase 1 of the CMAR agreement would include pre-construction services. The selected CMAR would act as an expert consultant to the Government, collaborating directly with USACE and the third-party Designer of Record during active design progression. The Government’s intent is to award the Phase I Agreement for Preconstruction Services prior to the 95% design review meeting. Phase 2 of the agreement would include scope for all construction activities necessary to complete the project. The agreement will be Firm-Fixed-Price (FFP). All interested parties should monitor the official solicitation announcement, which will provide complete details and submission instructions. Draft documents may be provided at a future date for feedback and informational purposes only and are subject to change upon issuance of the formal Project RFQ. VIRTUAL PARTICIPATION OPPORTUNITY For those who are unable to attend the Industry Day event in person, the Louisville District plans to stream the event through Microsoft Teams. The details related to the MS Teams event are provided below: Microsoft Teams Meeting Join: https://dod.teams.microsoft.us/meet/993202545806?p=OoGJrDe3gE2XSV5cjy Meeting ID: 993 202 545 806 Passcode: aR7VH6d9 | - | Special Notice | 11/16/2026 |
The U.S. Army Corps of Engineers (USACE) is issuing this special notice to announce an upcoming competition for the design and construction of four (4) Collective Training Enlisted (CTE) Barracks and one (1) Advanced Skills Training (AST) Barracks at Fort Hunter Liggett, CA using Progressive Design-Build (PDB) under 10 USC §2808a Other Transaction Authority for Construction. This notice is for informational and planning purposes to allow interested parties to prepare for and provide feedback prior to the official solicitation release. I. INDUSTRY DAY USACE intends to conduct an Industry Day on 17 November 2026 at 0900 Pacific Time to provide an overview of the project, acquisition strategy, and anticipated requirements. This event will provide interested parties with an opportunity to gain additional insight into the project and proposed Progressive Design-Build (PDB) approach under an Other Transaction (OT) framework, ask questions, and provide input in advance of the official Request for Qualifications (RFQ) release. General questions from industry participants will be permitted during the Industry Day; however, all discussions and responses provided during the event are considered unofficial and are for informational purposes only. Statements made during the Industry Day do not constitute a commitment, authorization, or binding guidance related to the future Request for Qualifications (RFQ). Official Questions and Answers (Q&A) will be accepted and addressed following the release of RFQ. To access Fort Hunter Liggett, please proceed directly to the Main Gate / Access Control Point. You must be a U.S. Citizen and have a REAL ID to complete registration. If you do not have a REAL ID, provide your valid State ID/Driver’s License plus a current U.S. Passport. Please state your business intention “attending the U.S. Army Corps of Engineer’s Industry Day at Bldg. 3300”. Individuals with a valid CAC, should be able to access the installation directly. Fort Hunter Liggett Access Control Point Address: 2Q26+W3C Fort Hunter Liggett, CA 93928; or 36°00'08.3"N 121°14'23.5"W II. LOCATION/LOGISTICS Industry Day Presentation location: Building 3300, Classrooms 118 & 119. Parking is at the rear of the building. Overflow parking is located at Longbow St. and Blackhawk St. Fort Hunter Liggett Building 3300 Address: XQX8+V2, Fort Hunter Liggett, CA 93928; or 36°00'00.0"N 121°14'05.9"W USACE Agency Representative Mr. Robert “Bob” Roy – USACE Project Engineer, Sacramento District (831)710-7154 III. PROJECT OVERVIEW Project Title: Design and Construction of four (4) Collective Training Enlisted (CTE) Barracks and one (1) Advanced Skills Training (AST) Barracks Location: Fort Hunter Liggett, California Agency: U.S. Army Corps of Engineers, Louisville District NAICS Code: 236220 IV. PROJECT DESCRIPTION This acquisition will deliver four (4) Collective Training Enlisted (CTE) Barracks and one (1) Advanced Skills Training (AST) Barracks at Fort Hunter Liggett, CA. The scope of work consists of furnishing all necessary equipment, materials, labor, supervision, quality control, and supplies to demolish and dispose of five (5) existing Barracks and replacing with four (4) CTE Barracks and one (1) AST Barracks. Key features of the project may include: Design and construct four (4) multi-story CTE Barracks (approximately 46,000 total SF each), which will feature open bays, along with integrated officers sleeping rooms, team rooms, laundry facilities, restrooms, showers, storage, and janitorial closets. Supporting facilities may include but not limited to; site development, utilities and connections, lighting, paving, walks, curbs and gutters, storm drainage, electrical, plumbing, fire protection, HVAC, information systems, landscaping, signage, sustainability/energy, cybersecurity, and all required fixtures, furnishings, and equipment. Design and construct one (1) multi-story AST Barracks (approximately 45,000 total SF), which will feature sleeping quarters with bathrooms, study/day rooms, laundry rooms, storage, and janitorial closets. Supporting facilities may include but not limited to; site development, utilities and connections, lighting, paving, walks, curbs and gutters, storm drainage, electrical, plumbing, fire protection, HVAC, information systems, landscaping, signage, sustainability/energy, cybersecurity, and all required fixtures, furnishings, and equipment. Demolish and dispose of five (5) existing multi-story Barracks (approximately 39,000 total SF each). V. ACQUISITION STRATEGY – PRE-AWARD USACE, Louisville District will use a streamlined competitive selection process: Step 1 – White Papers: Interested parties will submit a Statement of Qualifications (max # of pages to be defined in formal RFQ). Following evaluation of the qualification packages, the Government intends to down-select up to three (3) highest qualified firms to proceed to Step 2. Step 2 – Pitch Presentations: Down-selected firms will participate in live pitch meetings. One company will be selected to enter exclusive negotiations. The Agreements Officer will request a detailed price proposal for Phase 1 (100% design) and negotiate the design fee, payment milestones, and Agreement Articles. The Government intends to negotiate a Guaranteed Maximum Price (GMP) for construction, which will be added as a bilateral modification at a later date. VI. ACQUSITION STRATEGY – AWARD The agreement will be awarded to the most qualified Design/Builder to provide design, preconstruction services, and construction. Phase 1 of the Progressive Design Build agreement will include design development and pre-construction services. Phase 2 of the agreement will include scope for all construction activities necessary to complete the project. The agreement will be Firm-Fixed-Price (FFP). All interested parties should monitor the official solicitation announcement, which will provide complete details and submission instructions. Draft documents may be provided at a future date for feedback and informational purposes only and are subject to change upon issuance of the formal Project RFQ. VII. Virtual Participation Opportunity: For those who are unable to attend the Industry Day even in person, the Louisville District plans to stream the event through Microsoft Teams. The details related to the MS Teams event are provided below: Microsoft Teams meeting Join: https://dod.teams.microsoft.us/meet/993167156182?p=0xzCpAMCfJMOR4Ixl1 Meeting ID: 993 167 156 182 Passcode: dd2oQ7zN | - | Special Notice | 11/17/2026 |
| - | Awarded | Open | |
The U.S. Army Corps of Engineers (USACE) Louisville District hereby issues Amendment 0003 to Solicitation No. W912QR26BA019, for procurement, Invitation For Bid, sealed bid for the Design Bid Build Construction of a 23,701 SF Aeromedical Evacuation Squadron (AES) Training facility at Joint Base Charleston, SC for the 315th Airlift Wing. CONSTRUCTION MAGNITUDE: In accordance with DFARS 236.204, the magnitude of this construction project is anticipated to be between $25 million and $100 million. Amdt 0003 extends the proposal due date to 10 AM Eastern Daylight Time on 27 August, 2026. Bid opening is scheduled for 3:30 Eastern Daylight Time on 27 August, 2026.Attachments included in this Amendment: W912QR26BA019_0003 (Signed) 00 10 00 Contract Line Item Number (CLIN) Schedule_Amdt 0003 W912QR26BA019_Plans-0003 W912QR26BA019_Specs-0003 W912QR26BA019_FIO_GeoTech Report-0002ArchCompPlan-0003 | - | Solicitation | 08/27/2026 |
*** 13 October 2026 UPDATE ***: Formal Request for Qualifications has been issued under Notice ID: W912QR279A001. The RFQ was issued 13 October. Responses are currently due 28 October. See RFQ posting for additional details. The U.S. Army Corps of Engineers (USACE) is issuing this special notice to announce an upcoming competition for construction solicitation for Fort Carson ECS using CM@Risk under 10 USC §2808a Other Transaction Authority for Construction. This notice is for informational and planning purposes to allow interested parties to prepare for and provide feedback prior to the official solicitation release. I. INDUSTRY DAY USACE intends to conduct an Industry Day on 06 October 2026 at 0900 Mountain Time to provide an overview of the project, acquisition strategy, and anticipated requirements. This event will provide interested parties with an opportunity to gain additional insight into the project and proposed Construction Manager at Risk (CM@Risk) approach under an Other Transaction (OT) framework, ask questions, and provide input in advance of the official Request for Qualifications (RFQ) release. General questions from industry participants will be permitted during the Industry Day; however, all discussions and responses provided during the event are considered unofficial and are for informational purposes only. Statements made during the Industry Day do not constitute a commitment, authorization, or binding guidance related to the future Request for Qualifications (RFQ). Official Questions and Answers (Q&A) will be accepted and addressed following the release of RFQ. Please use the direct special event link below to register for access to Fort Carson. You must be a U.S. Citizen and have a REAL ID to complete registration. If you do not, you must go the Fort Carson Visitor Control Center (located at Gate 1, located off 115 HW) with your State ID plus a U.S. Passport OR Certified birth certificate and Social Security Card to obtain access. Individuals with a valid CAC, should be able to access the installation directly. Direct Special Event Link https://pass.aie.army.mil/?b=usa&i=carson&e=M6JLHPVK Physical Access Control POC: Mark Elliott (719) 466-1132 mark.d.elliott24.civ@army.mil II. LOCATION/LOGISTICS Industry Day Presentation location: Butts Army Airfield Hangar – 9620 Son Tay Road NOTE: Onsite parking space may be limited, overflow parking is available in the vicinity Site Visit – Primary parking lot is at the CBRN Chamber across the tank trail at the intersection of Minick Ave and Prussman Blvd. Additional parking is available on Minick Ave less than a quarter mile NW of the CBRN Chamber lot. Onsite Directions Link Below. Turn by turn directions and map attached for download. https://maps.app.goo.gl/U4o1XusLDWip4gn87 III. PROJECT OVERVIEW Project Title: Construction of an Equipment Concentration Site (ECS) Complex Location: Fort Carson, Colorado Agency: U.S. Army Corps of Engineers, Louisville District NAICS Code: 236220 IV. PROJECT DESCRIPTION This acquisition will deliver a consolidated, fully functional ECS complex on an undeveloped 48-acre parcel of land at Fort Carson, CO. This site features a comprehensive range of facilities designed to support the mission of ECS-42, which is responsible for the maintenance and storage of key military assets assigned to 83 regional Army Reserve units. The operational readiness of this military equipment is essential for both training Army Reserve Soldiers and equipping units from which the Active component will draw upon for critical warfighting capabilities inherent to deployable combat forces. Core Facilities include: General Purpose Warehouse (GPW): A 39,313 square-foot (SF) secure, clear-span storage facility designed for the protection and preservation of military equipment. Area Maintenance Support Activity (AMSA) Shop: A 26,217 SF vehicle maintenance facility featuring advanced vehicle maintenance exhaust systems, overhead cranes, heavy-duty hoists, and specialized tool rooms. Organizational Storage Building: A 5,000 SF high-bay vertical storage facility. Container Storage Area: A 4,440-square-yard (SY) reinforced concrete layout for secure tactical container storage. Supporting Infrastructure & Specialized Systems include: Heavy Equipment Parking & Site Work: A Military Equipment Parking (MEP) lot featuring extensive heavy-duty concrete pavements designed to withstand high-shear tracked and wheeled tactical vehicle loads, alongside POV parking, security fencing, and utility tie-ins. Tactical Vehicle Wash Facilities: Two dedicated, high-capacity vehicle wash racks/platforms featuring industrial filtration and water-recycling systems. Bi-Level Loading Ramp: A reinforced bi-level loading ramp designed to facilitate the rapid loading and unloading of heavy armored vehicles onto transport carriers. Specialized Foundations: Geotechnical engineering solutions, including deep foundation systems and soil stabilization, to mitigate volatile soil conditions across the 48-acre site. Fire Protection: Advanced fire detection and suppression systems, including specialized solutions for high-bay maintenance areas and hazardous material storage, compliant with all relevant UFC and NFPA standards. Cybersecurity: Facility-related control systems will be designed and implemented in accordance with UFC 4-010-06, ensuring the cybersecurity of all networked building systems. UFC Compliance: The entire facility complex will be designed and constructed to meet all applicable Unified Facilities Criteria (UFC), including AT/FP (Antiterrorism/Force Protection) standards and sustainable design principles as outlined in the Army Sustainable Design and Development Policy. V. ACQUISITION STRATEGY - PRE-AWARD USACE, Louisville District will use a streamlined competitive selection process: Step 1 –White Papers: Interested parties will submit a Statement of Qualifications (max # of pages to be defined in formal RFQ). Following evaluation of the qualification packages, the Government intends to down-select up to three (3) highest qualified firms to proceed to Step 2. Step 2 – Pitch Presentations: Down-selected firms will participate in live pitch meetings. One company will be selected as the Construction Manager for negotiation and award of Agreement 1 for preconstruction services. The Government intends to negotiate a Guaranteed Maximum Price (GMP) for construction of the ECS, which will be added as a bilateral modification at a later date. VI. ACQUSITION STRATEGY – AWARD The agreement will be awarded to the most qualified Construction Manager at Risk (CMAR) to provide preconstruction services and construction. Phase 1 of the CM@Risk agreement will include pre-construction services. The selected CMAR will act as an expert consultant to the Government, collaborating directly with USACE and the third-party Designer of Record during active design progression. The Government’s intent is to award the Phase I Agreement for Preconstruction Services prior to the 65% design review meeting. Phase 2 of the agreement will include scope for all construction activities necessary to complete the project. The agreement will be Firm-Fixed-Price (FFP). All interested parties should monitor the official solicitation announcement, which will provide complete details and submission instructions. Draft documents may be provided at a future date for feedback and informational purposes only and are subject to change upon issuance of the formal Project RFQ. VII. Virtual Participation Opportunity: For those who are unable to attend the Industry Day even in person, the Louisville District plans to stream the event through Microsoft Teams. The details related to the MS Teams event are provided below: Microsoft Teams meeting Join: https://dod.teams.microsoft.us/meet/993580238205?p=NgWECEurH73BprxGc1 Meeting ID: 993 580 238 205 Passcode: kB2Fr9e2 | - | Special Notice | 10/06/2026 |
Additional Details
Solicitation Number
W912QR-26-UEPH-FY26_FY27
Archive Date
Sep 30, 2026
Office Address
LOUISVILLE, KY, 40202-2230