GovChime
Notice ID: efc238d4771a49e68c3f148d894e43faSolicitationArchived

Uninterruptable Power Supply (UPS)

Archived on May 20, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
3:00 PM GMT+3
Posted
April 28, 2025
Notice type
Solicitation
NAICS
335999: All Other Miscellaneous Electrical Equipment and Component Manufacturing
Agency
Department of WarDepartment of the Air Force

Notice details

Office
FA5702 379 ECONS
Last updated
Nov 15, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
FA570225R0002
Notice ID
efc238d4771a49e68c3f148d894e43fa

Description

* Note please see the following attachments for this admendment: Consolidated Solicitation Questions for UPS, FA5702-19-C-0022 Construct 763 ERS IC As Build - Attach G14462.00.32 OL15 BL14.1 Facility Installation Document Rev A 379 ECONS is seeking proposals from qualified contractors for the design, procurement, installation, testing, and commissioning of Uninterruptible Power Supply (UPS) systems at Buildings B5506 and B5507, Al Udeid Air Base, Qatar. This project will provide reliable power protection to critical equipment within these facilities. Project Title: Uninterruptible Power Supply (UPS) Installation Project Location: Al Udeid Air Base, Qatar Magnitude of Construction: Between $250,000 and $500,000 Scope of Work: The selected contractor will be responsible for all aspects of the UPS system implementation, including: Design: Developing a detailed UPS system design, including load calculations, equipment specifications, and compliance documentation. Procurement: Procuring all necessary UPS system components (UPS units, battery banks, bypass systems, transformers, power distribution equipment, cabling, and conduit). Installation: Installing the UPS systems in accordance with industry standards and regulations. Testing and Commissioning: Conducting comprehensive testing to ensure system functionality and performance. Documentation: Providing complete as-built drawings, test reports, operation and maintenance manuals, and warranty information. Key Requirements: Offerors must have experience designing and installing UPS systems of similar size and complexity. All proposed equipment must meet specified technical requirements and be from approved manufacturers. All technicians and electricians must be factory-certified and possess required security clearances. The project is designated as mission-essential, requiring compliance with DODI 3020.37. Information Requested: Interested parties are strongly encouraged to review the attached Solicitation documents, including the Statement of Work (SOW), and submit responses accordingly. The solicitation package contains detailed information on the technical requirements, submission instructions, evaluation criteria, and terms and conditions. Disclaimer: This solicitation is not authorization to begin performance, and in no way obligates the Government for any costs incurred by the offeror associated with developing a proposal. The Government reserves the right not to award an order in response to this solicitation. Prior to commencement of any activities associated with performance of this requirement, the Government will issue a written directive or contractual document signed by the Contracting Officer with appropriate consideration established.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

Files (8)

  • FA5702-19-C-0022 Construct 763 ERS IC As Build - Attach.pdf

    15 MBAdded in Solicitation version 4Posted
    Download
  • Consolidated Solicitation Questions for UPS.pdf

    91 KBAdded in Solicitation version 4Posted
    Download
  • B5507. 58 -FA5702-19-C-0022 Construct 763 ERS IC - As Build - Attach (1).pdf

    15 MBAdded in Solicitation version 4Posted
    Download
  • Solicitation - FA570225R0002.pdf

    1.6 MBAdded in Solicitation version 1Posted
    Download
  • Attachment 1 B5507 Electrical Requirements.pdf

    711 KBAdded in Solicitation version 1Posted
    Download
  • Attachment 2 Functional Performance Test Example.pdf

    239 KBAdded in Solicitation version 1Posted
    Download
  • Attachment 3- Floor Plans.pptx

    379 KBAdded in Solicitation version 1Posted
    Download
  • STATEMENT OF WORK.pdf

    122 KBAdded in Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1SolicitationArchived

    Uninterruptable Power Supply (UPS)

    Notice 26a8ed14d1d7432d91b67d83365ec4e4 on SAM.gov

  2. 2
    Version 2SolicitationArchived

    Uninterruptable Power Supply (UPS)

    Notice 92a5147c65304112b788a85d7ef07fb1 on SAM.gov

  3. 4
    Version 4SolicitationArchivedCurrent

    Uninterruptable Power Supply (UPS)

    Notice efc238d4771a49e68c3f148d894e43fa on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

FA570225R0002

Archive Date

May 20, 2025

Place of Performance Country

QAT

Office Address

APO, AE, 09309-0000