GSU Transformer Supply, Oahe Dam, SD & Ft Peck Dam, MT
Awarded on February 20, 2026. Full description on SAM.gov.
Overview
- Posted
- February 20, 2026
- Notice type
- Award Notice
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 335311: Power, Distribution, and Specialty Transformer Manufacturing
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTHWESTERN.ENDIST OMAHA.W071 ENDIST OMAHA
- Place of performance
- Fort Pierre, South Dakota, 57532
- PSC
- 6120: TRANSFORMERS: DISTRIBUTION AND POWER STATION
- Last updated
- Nov 2, 2026
- First published
- Last updated on SAM.gov
- Award date
- Feb 20, 2026
- Award amount (SAM.gov award notice)
- $57.0M
Identifiers
- Solicitation number
- W9128F25RA053
- Notice ID
- bf258e856bcc489f94af379fde8194f7
- Award number (PIID)
- W9128F26CA013
Description
Project Description: Ft Peck Supply of the generator step-up (GSU) transformers 4 and 5 located in switchyard #2 at the Fort Peck Dam. The final suppy contract for the Fort Peck transformers will include:
* Design and manufacturing of two new GSU transformers.
* Design and manufacturing of ancillary and control components.
* Performance of Factory Acceptance Testing (FAT).
* Delivery to the Fort Peck power plant, offloading at the transformer temporary storage and staging location, transformer reassembly, oil processing and filling, and movement to final operating location as the location is made available by the separate installation contractor.
* Final acceptance testing and commissioning of transformer after interconnection to the power plant is performed by the separate installation contractor.
Oahe Supply of all GSU transformers locatd at Oahe Dam. The supply contract for the Oahe transformers will include:
* Design and manufacturing of 10 new GSU transformers.
* Design and manufacturing of ancillary and control components.
* Performance of Factory Acceptance Testing (FAT).
* Delivery to the Oahe Dam power plant, offloading at the transformer temporary storage and staging location, transformer reassembly, oil processing and filling, and movement to final operating location as the location is made available by the separate installation contractor.
*Final acceptance testing and commissioning of transformer after interconnection to the power plant is performed by the separate installation contractor.
Award Overview
Award Number
W9128F26CA013
Award Amount (SAM.gov award notice)
$57.0M
Award Date
Feb 20, 2026
Awardee
Awardee UEI
J93QMNBEQPY5
Awardee CAGE Code
6ND96
Awardee Address
Gilbert, AZ 85234, UNITED STATES
Original Solicitation
Notice ID: bf258e856bcc489f94af379fde8194f7
Posted Date: Feb 20, 2026
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Showing 10 of 29 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Solicitation | DEPT OF THE ARMY | Feb 20, 2026 | 148.02 KB | |||
| Solicitation | DEPT OF THE ARMY | Feb 20, 2026 | 10.67 MB | |||
| Solicitation | DEPT OF THE ARMY | Feb 20, 2026 | 3.24 MB | |||
| Solicitation | DEPT OF THE ARMY | Feb 20, 2026 | 1021.38 KB | |||
| Solicitation | DEPT OF THE ARMY | Feb 20, 2026 | 141.03 KB | |||
| Solicitation | DEPT OF THE ARMY | Feb 20, 2026 | 632.76 KB | |||
| Solicitation | DEPT OF THE ARMY | Feb 20, 2026 | 1.92 MB | |||
| Solicitation | DEPT OF THE ARMY | Feb 20, 2026 | 706.09 KB | |||
| Solicitation | DEPT OF THE ARMY | Feb 20, 2026 | 181.97 KB | |||
| Solicitation | DEPT OF THE ARMY | Feb 20, 2026 | 938.62 KB |
Showing 1 to 10 of 29 results
Lifecycle
- 2Version 2SolicitationArchived
GSU Transformer Supply, Oahe Dam, SD & Ft Peck Dam, MT
- 5Version 5Award NoticeArchivedCurrent
Type changed from Solicitation to Award Notice
GSU Transformer Supply, Oahe Dam, SD & Ft Peck Dam, MT
Similar Opportunities
Additional Details
Solicitation Number
W9128F25RA053
Archive Date
Mar 7, 2026
Office Address
OMAHA, NE, 68102-4901