GovChime
Notice ID: c0cb1dfd93b943448ef26b80ac22f93eSolicitationArchived

FY26 DESIGN-BUILD/DESIGN-BID-BUILD (DB/DBB) GENERAL CONSTRUCTION WEST MULTIPLE AWARD TASK ORDER CONTRACT (MATOC)

Archived on February 20, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM EST
Posted
January 20, 2026
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION SOUTH ATLANTIC.ENDIST CHARLESTON.W074 ENDIST CHARLESTON
Last updated
Nov 4, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W912HP26RA008
Notice ID
c0cb1dfd93b943448ef26b80ac22f93e

Description

0001: The purpose of this amendment is to extend the proposal due date to 28 January 2026 at 2PM Eastern. FY26 DESIGN-BUILD/DESIGN-BID-BUILD (DB/DBB) GENERAL CONSTRUCTION WEST MULTIPLE AWARD TASK ORDER CONTRACT (MATOC)US Army Corps of Engineers Charleston District has a requirement for a 100% Total Small Business Set-Aside: Indefinite Delivery, Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for Design-Build/Design-Bid-Build (DB/DBB) General Construction. This is a 100% Total Small Business Set-Aside. This Solicitation will result in a Firm Fixed Price (FFP) IDIQ MATOC for DB and DBB General Construction for all Charleston District Programs West of the Mississippi River. The MATOC is for a total Not to Exceed amount of $99,000,000 in shared capacity amongst all MATOC Awardees for the life of the contract. The estimated task order range will be from the simplified acquisition threshold to $25,000,000, with a performance period of a three-year base ordering period plus one two-year optional ordering period. The contract will also include one six-month option in accordance with FAR 52.217-8 for a total potential ordering period of 66 months. PROPOSAL REQUIREMENTS: The only authorized transmission method for a proposal in response to this Solicitation is electronically via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. NO OTHER TRANSMISSION METHODS (EMAIL, FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED. Offerors? proposals must be received by the Government by the date/time specified in the Solicitation. Offerors shall submit their proposal via the PIEE website?s Solicitation Module using the following link: https://piee.eb.mil//. IAW FAR 4.1103 Procedures, You must be registered in the System for Award Management (SAM) at the time an offer or quotation is submitted. For additional information, please call 866-606-8220 or visit the SAM website at https://www.sam.gov/.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

Lifecycle

  1. 4
    Version 4PresolicitationArchived

    Multiple Award Task Order Contract for Design Build/Design Bid Build (DB/DBB) West

    Notice 5afc4151388d498f8c4fa686c58aab5e on SAM.gov

  2. 2
    Version 2SolicitationArchived

    Type changed from Presolicitation to Solicitation

    FY26 DESIGN-BUILD/DESIGN-BID-BUILD (DB/DBB) GENERAL CONSTRUCTION WEST MULTIPLE AWARD TASK ORDER CONTRACT (MATOC)

    Notice 297a973161af45b2aa6023c47177b100 on SAM.gov

  3. 6
    Version 6SolicitationArchivedCurrent

    FY26 DESIGN-BUILD/DESIGN-BID-BUILD (DB/DBB) GENERAL CONSTRUCTION WEST MULTIPLE AWARD TASK ORDER CONTRACT (MATOC)

    Notice c0cb1dfd93b943448ef26b80ac22f93e on SAM.gov

Other notices for this solicitation

  1. OtherRelated noticeDec 2, 2025

    Multiple Award Task Order Contract for Design-Build and Design-Bid-Build General Construction West

    Notice dc9259f3467f4e1cb03bc7228f1ea2df on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
*Amendment 0006 issued on 21 MAY 2026 is to provide the finalized SF-1442 with accurate POP calendar days and terms for the 5 year DB MATOC. Amendment 0006 does not extend the receipt of Offers date. *Amendment 0005 issued on 20 MAY 2026 is to revise the number of calendar days for contractor to complete work, as well as Sections 00 22 16 and 00 73 00. Amendment 0005 does not extend the receipt of Offers date. *Amendment 0004 issued on 14 MAY 2026 is to extend the receipt of Offer date to 26 MAY 2026. *Amendment 0003 is issued to establish Phase II. Only those offerors who were selected to move into Phase II will have access to submit their proposals.*Amendment 0002 issued on 12.10.2025, Section 00 22 16 is provided* *Amendment 0001 issued on 11.26.2025, Sections 00 22 00 and 0 22 16 are provided* The U.S. Army Corps of Engineers (USACE), Los Angeles District (SPL) is issuing solicitation for a Design-Build (DB) Multiple Award Task Order Contract (MATOC) for construction services. This is a 100% Small Business Set-Aside. The contract duration is 5 years or a maximum not-to-exceed value of $99,000,000.00, whichever occurs first. This MATOC will cover Sustainment, Restoration, and Modernization (SRM) projects, minor MILCON, and support for military installations, Veteran Affairs, Customs and Border Patrol, and other Civil Works programs within the South Pacific Division (SPD) and primarily for installations and customers within the responsibility of USACE Los Angeles District including but not limited to: March Air Reserve Base (ARB), Edwards Air Force Base (AFB), Vandenberg Space Force Base, Fort Irwin, Port Hueneme, Camp Pendleton, Naval Surface Warfare Center (NSWC), Department of Interior, and Customs and Border Patrol. This DB MATOC will service the Southern California Region to include local public and military customers, although it will be available to Districts within the SPD AOR to include SPN, SPK, and SPA. Accordingly, SPL proposes to award up to six (6) Indefinite Delivery Contracts (IDCs). The Seed Task Order will be issued to the offerors who make it into Phase 2. The DB MATOC will include procedures for On-Off-ramp of its contractors as deemed appropriate. The overall work consists of but not limit to construction activities such as new construction, renovation, repairs, preventative maintenance, and operations.
95%
AwardedOpen
*Amendment 0006 issued on 21 MAY 2026 is to provide the finalized SF-1442 with accurate POP calendar days and terms for the 5 year DB MATOC. Amendment 0006 does not extend the receipt of Offers date. *Amendment 0005 issued on 20 MAY 2026 is to revise the number of calendar days for contractor to complete work, as well as Sections 00 22 16 and 00 73 00. Amendment 0005 does not extend the receipt of Offers date. *Amendment 0004 issued on 14 MAY 2026 is to extend the receipt of Offer date to 26 MAY 2026. *Amendment 0003 is issued to establish Phase II. Only those offerors who were selected to move into Phase II will have access to submit their proposals.*Amendment 0002 issued on 12.10.2025, Section 00 22 16 is provided* *Amendment 0001 issued on 11.26.2025, Sections 00 22 00 and 0 22 16 are provided* The U.S. Army Corps of Engineers (USACE), Los Angeles District (SPL) is issuing solicitation for a Design-Build (DB) Multiple Award Task Order Contract (MATOC) for construction services. This is a 100% Small Business Set-Aside. The contract duration is 5 years or a maximum not-to-exceed value of $99,000,000.00, whichever occurs first. This MATOC will cover Sustainment, Restoration, and Modernization (SRM) projects, minor MILCON, and support for military installations, Veteran Affairs, Customs and Border Patrol, and other Civil Works programs within the South Pacific Division (SPD) and primarily for installations and customers within the responsibility of USACE Los Angeles District including but not limited to: March Air Reserve Base (ARB), Edwards Air Force Base (AFB), Vandenberg Space Force Base, Fort Irwin, Port Hueneme, Camp Pendleton, Naval Surface Warfare Center (NSWC), Department of Interior, and Customs and Border Patrol. This DB MATOC will service the Southern California Region to include local public and military customers, although it will be available to Districts within the SPD AOR to include SPN, SPK, and SPA. Accordingly, SPL proposes to award up to six (6) Indefinite Delivery Contracts (IDCs). The Seed Task Order will be issued to the offerors who make it into Phase 2. The DB MATOC will include procedures for On-Off-ramp of its contractors as deemed appropriate. The overall work consists of but not limit to construction activities such as new construction, renovation, repairs, preventative maintenance, and operations.
95%
AwardedOpen
*Amendment 0006 issued on 21 MAY 2026 is to provide the finalized SF-1442 with accurate POP calendar days and terms for the 5 year DB MATOC. Amendment 0006 does not extend the receipt of Offers date. *Amendment 0005 issued on 20 MAY 2026 is to revise the number of calendar days for contractor to complete work, as well as Sections 00 22 16 and 00 73 00. Amendment 0005 does not extend the receipt of Offers date. *Amendment 0004 issued on 14 MAY 2026 is to extend the receipt of Offer date to 26 MAY 2026. *Amendment 0003 is issued to establish Phase II. Only those offerors who were selected to move into Phase II will have access to submit their proposals.*Amendment 0002 issued on 12.10.2025, Section 00 22 16 is provided* *Amendment 0001 issued on 11.26.2025, Sections 00 22 00 and 0 22 16 are provided* The U.S. Army Corps of Engineers (USACE), Los Angeles District (SPL) is issuing solicitation for a Design-Build (DB) Multiple Award Task Order Contract (MATOC) for construction services. This is a 100% Small Business Set-Aside. The contract duration is 5 years or a maximum not-to-exceed value of $99,000,000.00, whichever occurs first. This MATOC will cover Sustainment, Restoration, and Modernization (SRM) projects, minor MILCON, and support for military installations, Veteran Affairs, Customs and Border Patrol, and other Civil Works programs within the South Pacific Division (SPD) and primarily for installations and customers within the responsibility of USACE Los Angeles District including but not limited to: March Air Reserve Base (ARB), Edwards Air Force Base (AFB), Vandenberg Space Force Base, Fort Irwin, Port Hueneme, Camp Pendleton, Naval Surface Warfare Center (NSWC), Department of Interior, and Customs and Border Patrol. This DB MATOC will service the Southern California Region to include local public and military customers, although it will be available to Districts within the SPD AOR to include SPN, SPK, and SPA. Accordingly, SPL proposes to award up to six (6) Indefinite Delivery Contracts (IDCs). The Seed Task Order will be issued to the offerors who make it into Phase 2. The DB MATOC will include procedures for On-Off-ramp of its contractors as deemed appropriate. The overall work consists of but not limit to construction activities such as new construction, renovation, repairs, preventative maintenance, and operations.
95%
AwardedOpen
*Amendment 0006 issued on 21 MAY 2026 is to provide the finalized SF-1442 with accurate POP calendar days and terms for the 5 year DB MATOC. Amendment 0006 does not extend the receipt of Offers date. *Amendment 0005 issued on 20 MAY 2026 is to revise the number of calendar days for contractor to complete work, as well as Sections 00 22 16 and 00 73 00. Amendment 0005 does not extend the receipt of Offers date. *Amendment 0004 issued on 14 MAY 2026 is to extend the receipt of Offer date to 26 MAY 2026. *Amendment 0003 is issued to establish Phase II. Only those offerors who were selected to move into Phase II will have access to submit their proposals.*Amendment 0002 issued on 12.10.2025, Section 00 22 16 is provided* *Amendment 0001 issued on 11.26.2025, Sections 00 22 00 and 0 22 16 are provided* The U.S. Army Corps of Engineers (USACE), Los Angeles District (SPL) is issuing solicitation for a Design-Build (DB) Multiple Award Task Order Contract (MATOC) for construction services. This is a 100% Small Business Set-Aside. The contract duration is 5 years or a maximum not-to-exceed value of $99,000,000.00, whichever occurs first. This MATOC will cover Sustainment, Restoration, and Modernization (SRM) projects, minor MILCON, and support for military installations, Veteran Affairs, Customs and Border Patrol, and other Civil Works programs within the South Pacific Division (SPD) and primarily for installations and customers within the responsibility of USACE Los Angeles District including but not limited to: March Air Reserve Base (ARB), Edwards Air Force Base (AFB), Vandenberg Space Force Base, Fort Irwin, Port Hueneme, Camp Pendleton, Naval Surface Warfare Center (NSWC), Department of Interior, and Customs and Border Patrol. This DB MATOC will service the Southern California Region to include local public and military customers, although it will be available to Districts within the SPD AOR to include SPN, SPK, and SPA. Accordingly, SPL proposes to award up to six (6) Indefinite Delivery Contracts (IDCs). The Seed Task Order will be issued to the offerors who make it into Phase 2. The DB MATOC will include procedures for On-Off-ramp of its contractors as deemed appropriate. The overall work consists of but not limit to construction activities such as new construction, renovation, repairs, preventative maintenance, and operations.
95%
AwardedOpen
*Amendment 0006 issued on 21 MAY 2026 is to provide the finalized SF-1442 with accurate POP calendar days and terms for the 5 year DB MATOC. Amendment 0006 does not extend the receipt of Offers date. *Amendment 0005 issued on 20 MAY 2026 is to revise the number of calendar days for contractor to complete work, as well as Sections 00 22 16 and 00 73 00. Amendment 0005 does not extend the receipt of Offers date. *Amendment 0004 issued on 14 MAY 2026 is to extend the receipt of Offer date to 26 MAY 2026. *Amendment 0003 is issued to establish Phase II. Only those offerors who were selected to move into Phase II will have access to submit their proposals.*Amendment 0002 issued on 12.10.2025, Section 00 22 16 is provided* *Amendment 0001 issued on 11.26.2025, Sections 00 22 00 and 0 22 16 are provided* The U.S. Army Corps of Engineers (USACE), Los Angeles District (SPL) is issuing solicitation for a Design-Build (DB) Multiple Award Task Order Contract (MATOC) for construction services. This is a 100% Small Business Set-Aside. The contract duration is 5 years or a maximum not-to-exceed value of $99,000,000.00, whichever occurs first. This MATOC will cover Sustainment, Restoration, and Modernization (SRM) projects, minor MILCON, and support for military installations, Veteran Affairs, Customs and Border Patrol, and other Civil Works programs within the South Pacific Division (SPD) and primarily for installations and customers within the responsibility of USACE Los Angeles District including but not limited to: March Air Reserve Base (ARB), Edwards Air Force Base (AFB), Vandenberg Space Force Base, Fort Irwin, Port Hueneme, Camp Pendleton, Naval Surface Warfare Center (NSWC), Department of Interior, and Customs and Border Patrol. This DB MATOC will service the Southern California Region to include local public and military customers, although it will be available to Districts within the SPD AOR to include SPN, SPK, and SPA. Accordingly, SPL proposes to award up to six (6) Indefinite Delivery Contracts (IDCs). The Seed Task Order will be issued to the offerors who make it into Phase 2. The DB MATOC will include procedures for On-Off-ramp of its contractors as deemed appropriate. The overall work consists of but not limit to construction activities such as new construction, renovation, repairs, preventative maintenance, and operations.
95%
AwardedOpen

Additional Details

Solicitation Number

W912HP26RA008

Archive Date

Feb 20, 2026

Office Address

CHARLESTON, SC, 29403-5107