GovChime
Notice ID: 73b0335254dd4fe0b3c1c99b75069fccSolicitation

WWYK250096 - Repair Stormwater Spill Gate 11 Structure

Responses closed . Full description on SAM.gov.

Overview

Response deadline
2:00 PM CDT
Posted
July 23, 2026
Notice type
Solicitation
Set-aside
Women-Owned Small Business Sole Source
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Air Force

Notice details

Office
AIR FORCE MATERIEL COMMAND.AIR FORCE SUSTAINMENT CENTER.FA8137 AFSC PZIOC
Place of performance
S Coffeyville, Oklahoma, 73145
PSC
Z2KA: REPAIR OR ALTERATION OF DAMS
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
FA813726R0032
Notice ID
73b0335254dd4fe0b3c1c99b75069fcc

Description

UPDATE 10 July 2026

The PRE-BID RFI responses have been uploaded. 

The proposal due date is 10 Aug 2026 NLT 02:00PM CST. 

UPDATE 22 June 2026 

The site visit sign in sheet has been posted. The RFI due date is 25 June 2026 at 2:00 PM CST. 

This posting is for Tinker AFB – WOSB construction contractors with NAICS 237990.

Project Solicitation Number:  FA813726R0032


Project Title: WWYK250096 - Repair Stormwater Spill Gate 11 Structure

Project Location: Tinker Air Force Base

WWYK250096 - Repair Stormwater Spill Gate 11 Structure- The work to be performed under the terms of this Order consists of furnishing all materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish the repair of the concrete spill gate structure (Spill Gate 11 / Outfall 9) to reestablish the existing channel flow that conveys stormwater upstream from within TAFB outside the perimeter fence via Solider Creek at Tinker Air Force Base (AFB), Oklahoma (reference the project drawings for additional location information).

Project specific documents are attached to this posting.

If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission.  In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to.  Do not include any Sub-Contractor email addresses.

After review of the attached project specific documents, if you are interested to attend the Initial Site Visit, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. The POC emails are austin.elm@us.af.mil and sharla.flowers_brandon.1@us.af.mil.  Your RSVP email must be received by 2:00pm CT on 12 June 2026.  In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access.  If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. 

After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated.

You must attend the Initial Site Visit for the project to be considered eligible to propose.

The proposal will be due 20 July 2026 at 2:00PM CST.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (13)

  • 250095-Pre BID RFIs.pdf

    1.6 MBAdded in Solicitation version 4Posted
    Download
  • 250096-Site Vist Sign in Sheet.pdf

    5.0 MBAdded in Solicitation version 3Posted
    Download
  • Solicitation - FA813726R0032.pdf

    663 KBAdded in Solicitation version 2Posted
    Download
  • 250096- EAL List - BLANK to Contractors.xlsx

    62 KBAdded in Solicitation version 2Posted
    Download
  • Att 10_250096_SOW.pdf

    370 KBAdded in Solicitation version 2Posted
    Download
  • Att 12_250096_Drawings.pdf

    9.7 MBAdded in Solicitation version 2Posted
    Download
  • WD.pdf

    206 KBAdded in Solicitation version 2Posted
    Download
  • Att 4_250096_RMDFco.pdf

    297 KBAdded in Solicitation version 2Posted
    Download
  • Att 11_250096_Submittal Register.pdf

    132 KBAdded in Solicitation version 2Posted
    Download
  • 2020 TAFB Facility Standard.pdf

    5.8 MBAdded in Solicitation version 2Posted
    Download
  • 2026 TAFB Mechanical Standard.pdf

    1.2 MBAdded in Solicitation version 2Posted
    Download
  • 2026 TAFB Electrical Standard - Signed.pdf

    523 KBAdded in Solicitation version 2Posted
    Download
  • 2026 TAFB FIRE PROTECTION STANDARD.pdf

    341 KBAdded in Solicitation version 2Posted
    Download

Lifecycle

  1. 1
    Version 1Presolicitation

    WWYK250096 - Repair Stormwater Spill Gate 11 Structure

    Notice 7e21517455bc40d3bb59cda19f0f4706 on SAM.gov

  2. 2
    Version 2Solicitation

    Type changed from Presolicitation to Solicitation

    WWYK250096 - Repair Stormwater Spill Gate 11 Structure

    Notice 2d8c203613064f04a5316d24437c1632 on SAM.gov

  3. 3
    Version 3Solicitation

    WWYK250096 - Repair Stormwater Spill Gate 11 Structure

    Notice acc8f76bb0e746f39f7327c5d2c82148 on SAM.gov

  4. 4
    Version 4Solicitation

    WWYK250096 - Repair Stormwater Spill Gate 11 Structure

    Notice 584c301cc18244e98749e4ef1f18551a on SAM.gov

  5. 5
    Version 5SolicitationCurrent

    WWYK250096 - Repair Stormwater Spill Gate 11 Structure

    Notice 73b0335254dd4fe0b3c1c99b75069fcc on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

FA813726R0032

Archive Date

Jun 5, 2027

Office Address

TINKER AFB, OK, 73145-9125