GovChime
Notice ID: 2cb96c4e677844ecb861b9b9bd017e96SolicitationArchived

Oahe IDCC Road Maintenance 2026

Archived on July 30, 2026. Original response deadline: . Full description on SAM.gov.

Description

**Bid Abstract Uploaded**

**Amendment 0001 has been posted with a revised bid schedule adding a line item for Asphalt and Bid Due date has been extended to 9 July 2026.**

**Excel format of Bid Schedule provided. Excel or Word format of Bid Schedule are acceptable for submission with bid.**

Please see the attached solicitaiton for all information.  

Full description on SAM.gov

Overview

Agency:
Department of WarDepartment of the Army
Office:US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTHWESTERN.ENDIST OMAHA.W071 ENDIST OMAHA
Posted:July 13, 2026
NAICS:237310: Highway, Street, and Bridge Construction
Last Updated:Oct 28, 2026
First published:
Last updated on SAM.gov:
PSC:Y1LB: CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Set-Aside:Total Small Business Set-Aside (FAR 19.5)
Type:Solicitation
Place of Performance:Fort Pierre, South Dakota

Award Overview

Possible prior contracts

Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (7)

  • Bid Abstract for W9128F26BA019 Road Maintenence IDCC at Oahe SD.pdf

    437 KBAdded in Solicitation version 6Posted
    Download
  • Amd 0001 for W9128F26BA019 Road Maintenence IDCC at Oahe SD.pdf

    3.8 MBAdded in Solicitation version 4Posted
    Download
  • Revised Bid Schedule in Excel Format.xlsx

    19 KBAdded in Solicitation version 4Posted
    Download
  • 00 10 00 - Bid Schedule-Revised 6July2026.docx

    203 KBAdded in Solicitation version 4Posted
    Download
  • W9128F26BA019 Road Maintenance IDCC at Oahe SD.pdf

    8.0 MBAdded in Solicitation version 2Posted
    Download
  • Specifications W9128F26BA019 OA IDCC Road Maintenance 2026.pdf

    2.0 MBAdded in Solicitation version 2Posted
    Download
  • DB Wage Det SD20260001 1.30.2026.pdf

    31 KBAdded in Solicitation version 2Posted
    Download

Lifecycle

  1. 1
    Version 1Presolicitation

    Oahe IDCC Road Maintenance 2026

    Notice c80f7bdcccce4e18b2fd47c3560fe78a on SAM.gov

  2. 2
    Version 2SolicitationArchived

    Type changed from Presolicitation to Solicitation

    Oahe IDCC Road Maintenance 2026

    Notice 38076007d58b4e3396b2eeea552f25ae on SAM.gov

  3. 3
    Version 3SolicitationArchived

    Oahe IDCC Road Maintenance 2026

    Notice 6afa421159f64048b479c608732a8723 on SAM.gov

  4. 4
    Version 4SolicitationArchived

    Oahe IDCC Road Maintenance 2026

    Notice 9204c5756c7f4d7c8d6c058558bfd6a3 on SAM.gov

  5. 6
    Version 6SolicitationArchivedCurrent

    Oahe IDCC Road Maintenance 2026

    Notice 2cb96c4e677844ecb861b9b9bd017e96 on SAM.gov

  6. 8
    Version 8Award NoticeArchived

    Type changed from Solicitation to Award Notice

    Oahe IDCC Road Maintenance 2026

    Notice 262236fe037c4b8c9a42bf6b9012fefc on SAM.gov

Similar Opportunities

Title
Phase
Agency
NAICS
Set Aside
Posted
Deadline
Location
On or about 4 June 2026, The U.S. Army Corps of Engineers (USACE) - Omaha District, intends to issue an Invitation for Bid (IFB) for a Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) Single Award Task Order Contract (SATOC) for the rehabilitation of roads and grounds of Oahe Dam Project north of Pierre SD. The SATOC will be for a broad range of maintenance, repair, and minor construction work on roadways at Oahe Dam near Fort Pierre, SD. The contractor shall be required to furnish all materials, equipment and personnel necessary to manage and complete the Task Orders. The ask order may include work and materials for reconditioning/resurfacing roads and improving drainage paths include, but is not limited to: Earthwork and Excavation Installation of Geotextile Fabric Cold Milling of Bituminous Pavement Asphalt Crack Sealing Aggregate Base Course Supply and Install Chip Seal/Fog Seal Concrete Pavement (4"-6" depth) and Curb/Gutter Full Depth Reclamation of Asphalt Pavement Pavement Paint Application (Shoulder, Centerline, Parking Area, Stop Line, Handicap Symbols) Seeding and Erosion Blanket Storm Drainage Piping This work will also include the development and implementation of a stormwater prevention plan, construction staking of grades, and maintenance of traffic while working on or around roadways. The contractor will be required to acquire all permits and haul agreements for state and local routes. Work times will be limited to the hours of 7AM to 5PM, Monday through Friday. No work will be permitted on Saturday or Sunday. The contract will be effective for 3 years and 8 months from the date of award, with a total capacity of $1.5M. Task Orders will be issued on the base contract, and the work will be required to commence a short time after the issuance of the Notice to Proceed (NTP). Each task order will be issued with a time of completion and provisions will be included for liquidated damages if required. Performance and payment bonds will be required for each individual task order. Prices will be determined at time of award with estimated quantities and the quantities will be determined based on maintenance needs in each task order. Contracting Office Address: USACE Omaha District 1616 Capital Ave, Omaha, NE 68102-4901 NAICS Code: The Primary North American Industry Classification System (NAICS) code anticipated for solicitation is 237310 Highway, Street, and Bridge Construction, with a size standard for Small Business of $41,500,000.00. All contractors must be registered and have an active and verified account in the System for Award Management (SAM) in order to receive a contract award from any DoD activity. Contractors may access the Internet site at: https://www.sam.gov/ to register and/or obtain information about the SAM program. Contractors must ensure that the applicable NAICS code 237310 is included in their profile prior to submission of offer. Point Of Contact: The point of contact for this pre-solicitation notice is Karen Caskey, who can be reached by email: Karen.L.Caskey@usace.army.mil. Obtaining Solicitation Documents: Solicitation documents will be posted to the web via SAM.gov (https://sam.gov). Find solicitation announcement in SAM.gov (https://sam.gov). Use the ‘All Award Data' to locate the project by entering the solicitation number. 1. By using the ‘login' feature, it allows additional search features and allows you to keep your searches. Login might be required on some solicitations that are considered restricted. 2. Once you have located your project, click on link to solicitation to view the project. Files may be downloaded from the column on the left side reading ‘Attachments/Links’. Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM) database http://www.sam.gov/ exists and directed solicitation provisions concerning electronic annual Representations and Certifications on SAM. Representations and certifications are required to be up-dated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. Solicitation documents will be posted to the web via SAM.gov (sam.gov). Registration is required to access solicitation documents. SAM.gov provides secure access to acquisition-related information, synopsis or pre-solicitation notices and amendments.
Pre-Solicitation237310Total Small Business Set-Aside06/04/202607/07/2026Fort Pierre, SD
THE WORK CONSISTS OF: Furnish all equipment, materials, and labor for the provision and installation of approximately 250 linear feet of new pressure-treated guardrail at Mansfield Hollow Dam, Mansfield, CT in accordance with the following requirements and Statement of Work. The magnitude of construction is between $25,000 and $100,000. For additional information on construction contracts awarded to small businesses please visit: Partnering With Us (army.mil). This procurement is set-aside for small business vendors. The applicable NAICS code is 237310 with a Small Business Size Standard of $45 Million. ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE.
Solicitation237310Total Small Business Set-Aside10/27/202610/30/2026-
*** 20 October 2026 - Amendment W9127N26BA0240006 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement *** This amendment affects changes to the Block 14 (Description of Amendment/Modification): CHANGE IN SOLICITATION SPECIFICATIONS: Solicitation Specifications, Section 01 10 10.00 25 CONTRACTOR'S OPERATIONS AND REQUIREMENTS Paragraph 1.18.4 Traffic Control Plan (TCP) edited. CHANGE IN SOLICITATION ATTACHMENTS: Attachment A16 BN NL Bridge As Builts_combined drawings edited. (SEE ATTACHED AMENDMENT FOR CHANGES) *** 14 October 2026 - Amendment W9127N26BA0240006 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement *** This amendment affects changes to the Block 14 (Description of Amendment/Modification): Solicitation Specifications, Section 01 45 00.00 25 QUALITY CONTROL Paragraph 3.8.1 GOVERNING FIELD TESTING STANDARDS AND FREQUENCIES added. Solicitation Specifications, Section 03 30 00.00 99 CAST-IN-PLACE REINFORCED CONCRETE Paragraph 3.13.1 GENERAL added. Remove drawing C-104 and replace with C-104 - MARK 1 - AMD-0006 – UPDATE TO DEMOLITION NOTES. Remove drawing C-106 and replace with C-106 - MARK 1 - AMD-0006 – UPDATE TO PAVING AREA AND NOTES, MARK 2 - AMD-0006 – UPDATE TO DEFINE FENCING AND GATE. Remove drawing C-102 and replace with C-102 – MARK 1 - AMD-0006 – UPDATE TO DEMOLITION NOTES. (SEE ATTACHED AMENDMENT FOR CHANGES) *** 01 October 2026 - Amendment W9127N26BA0240005 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement *** This amendment effects changes to the Block 14 (Description of Amendment/Modification): The Solicitation Period is extended by 21 calendar days which changes the Solicitation Closing Date from October 8, 2026, to October 29, 2026. Solicitation Specifications, Section 01 10 10.00 25 CONTRACTOR'S OPERATIONS AND REQUIREMENTS, Paragraph 1.18.4 Traffic Control Plan (TCP) edited. Solicitation Specifications, Section 01 45 00.25 25 CONSTRUCTION MANAGEMENT PLATFORM (CMP), Technical Section added in its entirety. (SEE ATTACHED AMENDMENT FOR CHANGES) *** 18 September 2026 - Amendment W9127N26BA0240004 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement *** This amendment effects changes to the Block 14 (Description of Amendment/Modification): Solicitation Specifications, Section 31 68 13.00 99 – GROUND ANCHORS, Part 1 GENERAL, Paragraph 1.5.2 Qualifications are changed as detailed in the SUMMARY OF CHANGES. Solicitation Specifications, Section 31 73 20.00 99 – JET GROUTING, Part 1 GENERAL, Paragraph 1.7.1 Qualifications are changed as detailed in the SUMMARY OF CHANGES. Solicitation Specifications, Section 00 73 00 – Supplementary Conditions, Paragraph L. - COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984), the Period of Performance is amended as detailed in the SUMMARY OF CHANGES. This will allow for work to occur during the 2029 and 2030 In Water Work Window years. Environmental permits remain unchanged by this amendment. Marine Mammal protections as listed in the specification, and as governed by the IHA, included with the Attachments, remain in effect for the permitted years. No in water work, that is governed by IHA, will be allowed beyond the IHA permit years allowed. (SEE ATTACHED AMENDMENT FOR CHANGES) *** 09 September 2026 - Amendment W9127N26BA0240002 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement *** This amendment effects changes to the Block 14 (Description of Amendment/Modification): Solicitation Specifications, Section 01 57 19.00 25 - TEMPORARY ENVIRONMENTAL CONTROLS, Part 3 EXECUTION, Paragraph 3.4.3 PROFESSIONAL ARCHAEOLOGICAL MONITOR. (SEE ATTACHED AMENDMENT FOR CHANGES) *** 03 September 2026 - Amendment W9127N26BA0240002 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement*** This amendment effects changes to block 13 of Standard Form 1442, the Solicitation Specifications, Section 00 21 13 – Instruction to Bidders, and Section 00 21 00 – Instructions. Additionally, it extends the solicitation period and provides for an additional site visit. The Solicitation Period is extended by 20 calendar days which changes the Solicitation Closing Date from September 18, 2026, to October 8, 2026. Site Visit Registration. Send an email to Michael R. Carl via email at michael.r.carl@usace.army.mil and Courney R. Hollins at courtney.r.hollins@usace.army.mil by COB Wednesday, 09 September 2026, to register for the site visit and provide first name, last name, and company/organization name. Site visit attendees must be U.S. citizens and possess a REAL ID to access the site. Acceptable forms of proof of citizenship for anyone born outside the USA are: US Birth Certificate: Must be certified & issued by either a US State or the US State Department. US Passport Undamaged: Issued by the US Dept of State, without limitation, does not need to be current, is/was valid for 10 years for adults and 5 years for children under 16. US Passport Card Undamaged: Issued by the US Dept of State, without limitation, does not need to be current. US Certificate of Citizenship: Issued by US Citizenship and Immigration Service. Consular Report of Birth Abroad: Issued by the US State Department. US Naturalization Certificate: Issued by US Citizenship and Immigration Service. Enhanced Driver’s License: from Michigan, Minnesota, New York, Vermont, or Washington. Acceptable ID: Real ID driver’s license. Enhanced driver’s license. Federal Identification Cards PIC/CAC/PIV/Etc. Transportation Worker Identification Card (TWIC). United States Passport or United States Passport Card. Driver’s license issued by the Department of State. *** 27 August 2026 - Amendment W9127N26BA0240001 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement*** This amendment inserts additional Government Furnished Information (GFI) as an attachment to the solicitation. The file “Power Line Layout” is provided for the Contractor’s information. The Government shall not be responsible for any interpretation of, or conclusion drawn, from the data or information by the Contractor. Information provided should be field verified by the Contractor. If there is a discrepancy between the solicitation plan set and the GFI, the solicitation plan set takes precedence. The project consists of replacing the existing bridge with a new fixed bridge on a new alignment and to provide for partial demolition of the existing bridge. The new fixed bridge will be a single-span steel girder bridge with a concrete deck. The bridge width will be 34’4½” out-to-out, with two 11’0” travel lanes, two 2’0” shoulders, a 5’0” sidewalk, and the superstructure will consist of four (4) built-up steel plate girders. The replacement bridge alignment is located immediately downstream of the existing bridge and, at its northern terminus, will fit entirely between the existing bridge and the Bonneville Power Administration transmission tower which is located to the south. Approach roadways will also be constructed to tie into the existing roadway alignment. The new fixed bridge will be located over the existing navigation channel and will provide an under clearance that is larger than is currently present under the existing bridge. The north abutment will be a concrete stub abutment with spread footing anchored into rock. The south abutment will be a concrete abutment that is supported by drilled shafts. To mitigate seismic hazards, portions of the existing bridge will be removed as part of the bridge construction requirement. The existing bridge provides for critical vehicular access to the Bonneville project that must remain open for the entirety of the construction project. This will likely require the contractor to construct the project in phases. In addition, lead and asbestos removal will be required as part of this requirement. Working within environmental and seasonal restrictions and barge crane lifting will be required in close proximity to a high voltage power line will also be necessary during performance of the required work.
Solicitation237310Total Small Business Set-Aside10/20/202610/29/2026Cascade Locks, OR
Award of the Phillips Parkway Haul Route - Cape Canaveral SFS, FL
Awarded237310Total Small Business Set-Aside09/30/2026Open-
PROJECT TITLE: VENONA ROAD WIDENING PROJECTPROJECT LOCATION: FORT GEORGE MEADE, MARYLANDThe project is to widen Venona Rd, from a two-lane undivided road to a four-lane divided roadway; installation of vehicular drop arm structures; a Taylor Ave emergency gate; minor modifications to Security fences; and installation of office trailers.
Awarded237310Total Small Business Set-Aside06/26/2026Open-

Additional Details

Solicitation Number

W9128F26BA019

Archive Date

Jul 30, 2026

Office Address

OMAHA, NE, 68102-4901