GovChime
Notice ID: 84704b3905704366b5dfbfc26c9c2b47Award NoticeAwardedArchived

R--MRG-RIVER EYES MONITORING

Awarded on September 9, 2026. Full description on SAM.gov.

Awarded tounder 140R4026P0093 (source: SAM.gov award notice)• $1.8M

Overview

Posted
September 9, 2026
Notice type
Award Notice
NAICS
541690: Other Scientific and Technical Consulting Services
Agency
Department of the InteriorBUREAU OF RECLAMATION

Notice details

Office
UPPER COLORADO REGIONAL OFFICE
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov
Award date
Sep 9, 2026
Award amount (SAM.gov award notice)
$1.8M

Identifiers

Solicitation number
140R4026Q0101
Notice ID
84704b3905704366b5dfbfc26c9c2b47
Award number (PIID)
140R4026P0093

Description

EO 14398 - MRG-RIVER EYES MONITORING

Full description on SAM.gov

Award Overview

Award Number

140R4026P0093

Award Amount (SAM.gov award notice)

$1.8M

Award Date

Sep 9, 2026

Awardee

Awardee UEI

DJXAU61FR6P4

Awardee CAGE Code

02MU9

Awardee Address

3393 N DODGE BLVD, TUCSON, AZ 85716, UNITED STATES

Original Solicitation

Notice ID: 84704b3905704366b5dfbfc26c9c2b47

Posted Date: Sep 9, 2026

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

3
  • 140R4021P0013
    GEOSYSTEMS ANALYSIS, INC
    Department of the InteriorNAICS 541690
    $1.4MSigned Feb 18, 2026
  • 140R4021P0013
    GEOSYSTEMS ANALYSIS, INC
    Department of the InteriorNAICS 541690
    $1.1MSigned Jun 9, 2025
  • 140R4021P0013
    GEOSYSTEMS ANALYSIS, INC
    Department of the InteriorNAICS 541690
    $1.1MSigned Mar 4, 2025

Contacts

Contracting Officer

Primary Contact

Documents

Files (6)

  • Sol_140R4026Q0101_Amd_0001.pdf

    202 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • Sol_140R4026Q0101.pdf

    405 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment_3_-_Small-Business_Subcontracting_Plan_Template.docx

    57 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment_1_-_RiverEyes_PWS.docx

    51 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment_4-_NM_WD_2015-5443_Rev_28_5-13-2026.pdf

    68 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment_2-_Price_Schedule.docx

    42 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 2
    Version 2Combined Synopsis/SolicitationArchived

    R--MRG-RIVER EYES MONITORING

    Notice 36b3c0a80d7e4f2c8a77b3bb6a9b1313 on SAM.gov

  2. 5
    Version 5Award NoticeArchivedCurrent

    Type changed from Combined Synopsis/Solicitation to Award Notice

    R--MRG-RIVER EYES MONITORING

    Notice 84704b3905704366b5dfbfc26c9c2b47 on SAM.gov

Other notices for this solicitation

  1. Combined SynopsisRelated noticeJul 14, 2026

    MRG-RIVER EYES MONITORING

    Notice ae0f2cdf68f4436bac52f0fc7de87cf5 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
The requirement outlines contractor service support for one upcoming flight test. The test durationwill be three days, and a representative will be required to assist with test planning. The contractoris responsible for the refurbishment of three (3) existing UGVs and six (6) trailers, along with thetransport of UGVs, trailers, and support equipment to operate the vehicles/trailers. All vehicles andtrailers must be built laser safe and able to operate in remote/austere environments. At thecompletion of the test, contractor personnel will be responsible for the removal of all UGV, trailers,and debris from the test range. Additional requirements include the ability of the UGVs and trailersto operate on a dirt runway (smooth unimproved surface) and must be able to maneuver 90 degreeturns and rapidly accelerate and decelerate. Trailers and UGVs must have mounting positions forGo Pro Cameras (cameras are owned/operated by the test center) and easily replaceable materialon the top and sides of the trailers. UGV may be four-wheel drive (preferred) or front wheel drive.The contractor is responsible for providing all personnel (including a mechanic), services, facilities,and materials to accomplish the effort.
-AwardedOpen
MRG RGSM SPAWNING AND EGG MONITORING
-Pre-SolicitationOpen
The requirement outlines contractor service support for one upcoming flight test. The test durationwill be three days, and a representative will be required to assist with test planning. The contractoris responsible for the refurbishment of three (3) existing UGVs and six (6) trailers, along with thetransport of UGVs, trailers, and support equipment to operate the vehicles/trailers. All vehicles andtrailers must be built laser safe and able to operate in remote/austere environments. At thecompletion of the test, contractor personnel will be responsible for the removal of all UGV, trailers,and debris from the test range. Additional requirements include the ability of the UGVs and trailersto operate on a dirt runway (smooth unimproved surface) and must be able to maneuver 90 degreeturns and rapidly accelerate and decelerate. Trailers and UGVs must have mounting positions forGo Pro Cameras (cameras are owned/operated by the test center) and easily replaceable materialon the top and sides of the trailers. UGV may be four-wheel drive (preferred) or front wheel drive.The contractor is responsible for providing all personnel (including a mechanic), services, facilities,and materials to accomplish the effort.
-Solicitation04/30/2026
The requirement outlines contractor service support for one upcoming flight test. The test durationwill be three days, and a representative will be required to assist with test planning. The contractoris responsible for the refurbishment of three (3) existing UGVs and six (6) trailers, along with thetransport of UGVs, trailers, and support equipment to operate the vehicles/trailers. All vehicles andtrailers must be built laser safe and able to operate in remote/austere environments. At thecompletion of the test, contractor personnel will be responsible for the removal of all UGV, trailers,and debris from the test range. Additional requirements include the ability of the UGVs and trailersto operate on a dirt runway (smooth unimproved surface) and must be able to maneuver 90 degreeturns and rapidly accelerate and decelerate. Trailers and UGVs must have mounting positions forGo Pro Cameras (cameras are owned/operated by the test center) and easily replaceable materialon the top and sides of the trailers. UGV may be four-wheel drive (preferred) or front wheel drive.The contractor is responsible for providing all personnel (including a mechanic), services, facilities,and materials to accomplish the effort.
-Pre-Solicitation03/04/2026
INJECTION WELL FAILURE MODE EVALUATION
-Solicitation11/13/2026

Additional Details

Solicitation Number

140R4026Q0101

Archive Date

Sep 24, 2026

Office Address

SALT LAKE CITY, UT, 84138