GovChime
Notice ID: 33ef206ceeaf468ca5c4697edf5a4715Award NoticeAwarded

H944--FY24: Boiler Inspection, Testing and Calibration Services

Awarded on May 1, 2024. Full description on SAM.gov.

Awarded tounder 36C24824P1258 (source: SAM.gov award notice)• $69.7K

Overview

Posted
May 16, 2024
Notice type
Award Notice
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
NAICS
238220: Plumbing, Heating, and Air-Conditioning Contractors
Agency
Department of Veterans Affairs

Notice details

Place of performance
James A. Haley Veterans Administration Medical Ctr 13000 Bruce B. Downs Blvd, Tampa, FL, 33612
Last updated
Dec 4, 2025
Award date
May 1, 2024
Award amount (SAM.gov award notice)
$69.7K

Identifiers

Solicitation number
36C24824Q0490
Notice ID
33ef206ceeaf468ca5c4697edf5a4715
Award number (PIID)
36C24824P1258

Description

Combined Synopsis-Solicitation 2 Description (i) This is a combined synopsis/solicitation for Boiler Inspection, Testing and Calibration Services at James A. Haley Veterans Hospital (JAHVH), prepared in accordance with the format in Federal Acquisition Regulation (FAR) Subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Products and Commercial Services, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued. (ii) The solicitation number is 36C24824Q0490 and is issued as a request for quotation (RFQ). (iii) The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2024-03, Effective February 23, 2024. (iv) This solicitation is for a 100% Set-Aside for Service-Disabled Veteran Owned Small Business (SDVOSB) set aside with associated NAICS code 238220 has a small business size standard of $19.0 Million. The FSC/PSC is H944. This solicitation will use Comparative Evaluation. Award will be made to the offeror determined to be acceptable, price reasonable, and is determined to best value to the government; all eligible offerors may submit quotes. To be considered as a Service-Disabled Veteran Owned Small Business (SDVOSB), prospective offerors shall be a verified SDVOSB in the VA Center for Verification and Evaluation (CVE) Veteran Information Pages (VIP) pages https://www.vip.vetbiz.gov/ at the date and time set for receipt of offers. Responses shall be on all or none basis, no partial submissions will be accepted. Quote must be valid for 90 days. All offerors must be registered in System for Award Management (SAM) at https://www.sam.gov at time offers are due to be considered for an award of a federal contract. Registration must be complete and not missing elements such as representations and certifications. (v) All interested companies shall provide quotations for the following Line Item Numbers (LIN s): ITEM NUMBER DESCRIPTION OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 0001 1.00 EA __________________ __________________ Annual Boiler Inspection PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: H944 - Other Quality Control, Testing, and Inspection - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors 0002 2.00 EA __________________ __________________ Semi Annual Boiler Calibration, Fine tuning, Testing/Adjustment of burners PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: H944 - Other Quality Control, Testing, and Inspection - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors 1001 1.00 EA __________________ __________________ Annual Boiler Inspection PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: H944 - Other Quality Control, Testing, and Inspection - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors 1002 2.00 EA __________________ __________________ Semi Annual Boiler Calibration, Fine tuning, Testing/Adjustment of burners PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: H944 - Other Quality Control, Testing, and Inspection - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors 2001 1.00 EA __________________ __________________ Annual Boiler Inspection PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: H944 - Other Quality Control, Testing, and Inspection - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors 2002 2.00 EA __________________ __________________ Semi Annual Boiler Calibration, Fine tuning, Testing/Adjustment of burners PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: H944 - Other Quality Control, Testing, and Inspection - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors 3001 1.00 EA __________________ __________________ Annual Boiler Inspection PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: H944 - Other Quality Control, Testing, and Inspection - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors 3002 2.00 EA __________________ __________________ Semi Annual Boiler Calibration, Fine tuning, Testing/Adjustment of burners PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: H944 - Other Quality Control, Testing, and Inspection - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors 4001 1.00 EA __________________ __________________ Annual Boiler Inspection PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: H944 - Other Quality Control, Testing, and Inspection - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors 4002 2.00 EA __________________ __________________ Semi Annual Boiler Calibration, Fine tuning, Testing/Adjustment of burners PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: H944 - Other Quality Control, Testing, and Inspection - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors GRAND TOTAL __________________ (vi) JAHVH is seeking to purchase Annual Boiler Inspection and Semi-Annual Safety Device Calibration, Fine tuning, Testing/Adjustment of burners. The base Period of Performance (POP) is 04/15/2024 04/14/2025. The period of performance is A Base Plus 4 (Four) Option Years. (vii) Place of Performance/Place of Delivery James A. Haley Veterans Hospital (JAHVH) 13,000 Bruce B. Down Blvd. Tampa, FL 33612-4745 The full text of FAR provisions or clauses may be accessed electronically at http://acquisition.gov/comp/far/index.html http://www.va.gov/oal/library/vaar/ (viii) The following solicitation provisions apply to this acquisition: FAR 52.212-1, Instructions to Offerors Commercial Products and Commercial Services (NOV 2021) (x) Offerors are advised to include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications -- Commercial Items, with its offer if has not been completed on SAM.gov. Offerors must complete annual representations and certifications electronically via the System for Award Management (SAM) website located at https://www.sam.gov/portal in accordance with FAR 52.212-3, Offerors Representations and Certifications Commercial Products and Commercial Services. If paragraph (j) of the provision is applicable, a written submission is required. Unique entity identifier (UEI). Applies to all quotes that exceed the micro-purchase threshold, and quotes at or below the micro-purchase threshold if the solicitation requires the contractor to be registered in the System for Award Management (SAM).) The quoter must enter, in the block with its name and address on the cover page of its quote, the annotation "Unique Entity Identifier" followed by the unique entity identifier that identifies the quoters name and address. The quoter also must enter its Electronic Funds Transfer (EFT) indicator, if applicable. The EFT indicator is a four-character suffix to the UEI. The suffix is assigned at the discretion of the quoter to establish additional SAM records for identifying alternative EFT accounts (see FAR subpart 32.11) for the same entity. If the quoter does not have a UEI, it should contact the entity designated at www.sam.gov for UEI establishment directly to obtain one. The quoter should indicate that it is a quoter for a Government contract when contacting the entity designated at www.sam.gov for establishing the UEI. (ix) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers: Evaluation Approach: The Government will evaluate quotations using the comparative evaluation process outlined in FAR 13.106-2 (b) (3), where quotations will be compared to one another to determine which provides the best benefit to the Government. The Government reserves the right to consider a quotation other than the lowest price that provides additional benefit(s). Quotations may exceed minimum requirements of the solicitation. The Government reserves the right to select a quotation that provides benefit to the Government that exceeds the minimum requirements of the solicitation, but is not required to do so. Each response must meet the minimum requirements of the solicitation. The Government is not requesting or accepting alternate quotations. The evaluation will consider the following: Technical Acceptability: Quote will be evaluated to determine if the vendor provides a sound, compliant approach that meets the requirements of the Statement of Work (SOW) and demonstrates a thorough understanding of the requirements. The technical and management approach will be evaluated to the extent to which it can meet and/or exceed the Government s requirements as outlined in the solicitation and based on the information requested in the below section of the solicitation. Acceptable - Quote clearly meets the minimum requirements of the solicitation. Unacceptable - Quote does not clearly meet the minimum requirements of the solicitation. Appropriate consideration will be given to the following: a. Technical and Management Approach Quoters shall provide a brief detailed plan no more than 10 pages describing a full understanding of the requirements of this Statement of Work (SOW). Quoters has a clear and effective approach in providing annual internal inspection, semiannual safety device testing, calibration boiler plant burners, controls, instruments and data management services. b. Contractor Qualification - Quoters shall provide their qualification/certifications detailing at least two years successful experience and/or operation in the industry, for inspection and maintenance of boilers under contracts in similar size and scope. Past Performance: The past performance evaluation will assess the relative risks associated with a quoter s likelihood of success in fulfilling the solicitation s requirements as indicated by the quoter s record of past performance. The past performance evaluation may be based on the contracting officer s knowledge of and previous experience with the supply or service being acquired; Customer surveys, and past performance questionnaire replies; Contractor Performance Assessment Reporting System (CPARS) at http://www.cpars.gov/ ; or any other reasonable basis. The Government may rely on internal documentation including Contract Performance Assessment Reporting System (CPARS) for supply being acquired to determine Past Performance. If no record of past performance is found in CPARS, the quoter shall not receive a favorable or unfavorable rating but shall receive a rating of neutral. Price: Price shall be submitted using on the vendor s own form. The Government will evaluate the price by adding the total of all line item prices, including all options. The Total Evaluated Price will be that sum. Options: The Government will evaluate quotations for award purposes by adding the total price for all options to the total price for the basic requirement. This includes options under FAR 52.217-8, Option to Extend Services, which applies to this solicitation. Evaluation of options under FAR 52.217-8 will be accomplished by adding six months of the quoter's price for the last potential period of performance under this contract to the quoter's total price. For example, if the contract includes option periods that are exercisable under FAR 52.217-9, the quoter's total price for the purpose of evaluation will include the base period, all option periods, and an additional six months of the last option period. Quoters must price only the base and option periods specified in the contract line item numbers (CLINs), and shall not submit a price for the potential six-month extension of services under FAR 52.217-8. The Government reserves the right to exercise the option under FAR 52.217-8 before the end of any of the contractor's performance periods and will be exercised at the price and/or rates in effect at the time the clause is exercised. Evaluation of options shall not obligate the Government to exercise the option(s). CONTRACT ADMINISTRATION DATA 1. Contract Administration: All contract administration matters will be handled by the following individuals: a. CONTRACTOR: b. GOVERNMENT: Contracting Specialist 36C248 Walida Moore-Saintil Department of Veterans Affairs Network Contracting Office 8 (248) 8875 Hidden River Pkwy Tampa FL 33637 2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with: [X] 52.232-33, Payment by Electronic Funds Transfer System For Award Management, or [] 52.232-36, Payment by Third Party 3. INVOICES: Invoices shall be submitted in arrears: a. Quarterly [] b. Semi-Annually [] c. Other [X] Monthly 4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests. Department of Veterans Affairs FMS-VA-2(101) Financial Services Center PO Box 149971 Austin, TX 78714-9971 The following contract clauses apply to this acquisition: (xi) FAR 52.212-4, Contract Terms and Conditions Commercial Products and Commercial Services . 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999) The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor any time prior to contract expiration. 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) (a) The Government may extend the term of this contract by written notice to the Contractor any time prior to expiration of the contract; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 15days before the contract expires. The preliminary notice does not commit the Government to an extension. (b) If the Government exercises this option, the extended contract shall be considered to include this option clause. (c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5years. VA NOTICE OF LIMITATIONS ON SUBCONTRACTING - CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (NOV 2022) (a) Pursuant to 38 U.S.C. 8127(k)(2), the offeror certifies that - (1) If awarded a contract (see FAR 2.101 definition), it will comply with the limitations on subcontracting requirement as provided in the solicitation and the resultant contract, as follows: [Contracting Officer check the appropriate box below based on the predominant NAICS code assigned to the instant acquisition as set forth in FAR 19.102.] (i) Services. In the case of a contract for services (except construction), the contractor will not pay more than 50% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs as set forth in 852.219-73 or VOSBs as set forth in 852.219-74. Any work that a similarly situated VIP-listed subcontractor further subcontracts will count towards the 50% subcontract amount that cannot be exceeded. Other direct costs may be excluded to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service as set forth in 13 CFR 125.6. (ii) General construction. In the case of a contract for general construction, the contractor will not pay more than 85% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs as set forth in 852.219-73or VOSBs as set forth in 852.219-74. Any work that a similarly situated VIP-listed subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted. (iii) Special trade construction contractors. In the case of a contract for special trade contractors, the contractor will not pay more than 75% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs as set forth in 852.219-73 or VOSBs as set forth in 852.219-74. Any work that a similarly situated subcontractor further subcontracts will count towards the 75% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted. (2) The offeror acknowledges that this certification concerns a matter within the jurisdiction of an Agency of the United States. The offeror further acknowledges that this certification is subject to Title 18, United States Code, Section 1001, and, as such, a false, fictitious, or fraudulent certification may render the offeror subject to criminal, civil, or administrative penalties, including prosecution. (3) If VA determines that an SDVOSB/VOSB awarded a contract pursuant to 38 U.S.C. 8127 did not act in good faith, such SDVOSB/VOSB shall be subject to any or all of the following: (i) Referral to the VA Suspension and Debarment Committee; (ii) A fine under section 16(g)(1) of the Small Business Act (15 U.S.C. 645(g)(1)); and (iii) Prosecution for violating section 1001 of title 18. (b) The offeror represents and understands that by submission of its offer and award of a contract it may be required to provide copies of documents or records to VA that VA may review to determine whether the offeror complied with the limitations on subcontracting requirement specified in the contract. Contracting officers may, at their discretion, require the contractor to demonstrate its compliance with the limitations on subcontracting at any time during performance and upon completion of a contract if the information regarding such compliance is not already available to the contracting officer. Evidence of compliance includes, but is not limited to, invoices, copies of subcontracts, or a list of the value of tasks performed. (c) The offeror further agrees to cooperate fully and make available any documents or records as may be required to enable VA to determine compliance with the limitations on subcontracting requirement. The offeror understands that failure to provide documents as requested by VA may result in remedial action as the Government deems appropriate. (d) Offeror completed certification/fill-in required. The formal certification must be completed, signed and returned with the offeror's bid, quotation, or proposal. The Government will not consider offers for award from offerors that do not provide the certification, and all such responses will be deemed ineligible for evaluation and award. Certification I hereby certify that if awarded the contract, [insert name of offeror] will comply with the limitations on subcontracting specified in this clause and in the resultant contract. I further certify that I am authorized to execute this certification on behalf of [insert name of offeror]. Printed Name of Signee: _______________________________ Printed Title of Signee: _______________________________ Signature: _______________________________ Date: _______________________________ Company Name and Address: _____________________________________________________________________ (xii) FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders Commercial Products and Commercial Services The following subparagraphs of FAR 52.212-5 are applicable: 52.203-6 Restrictions on Subcontractor Sales to the Government (JUN 2020) 52.204-7 System For Award Management (OCT 2018) 52.204-10 Reporting Executive Compensation & First-Tier Subcontract Awards (OCT 2015) 52.209-6 Protecting the Government s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (OCT 2015) 52.219-8 Utilization of Small Business Concerns (SEP 2023) 52.219-28 Post Award Small Business Program Representation (JUL 2013) 52.222-3 Convict Labor (JUN 2003) 52.222-19 Child Labor--Cooperation with Authorities and Remedies (FEB 2016) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (APR 2015) 52.222-35 Equal Opportunity for Veterans (JUN 2020) 52.222-36 Equal Opportunity for Workers with Disabilities (JUL 2014) 52.222-37 Employment Reports on Veterans 52.222-41 Service Contract Labor Standards (AUG 2018) 52.222-50 Combating Trafficking in Persons (MAR 2015) 52.222-54 Employment Eligibility Verification (MAY 2022) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011) 52.225-3 Buy American--Free Trade Agreements--Israeli Trade Act (MAY 2014) 52.225-13 Restrictions on Certain Foreign Purchases (JUNE 2008) 52.232-33 Payment by Electronic Funds Transfer System for Award Management 852.203-70 Commercial Advertising (JAN 2008) 852.232-72 Electronic Submission of Payment Requests 852.233-70 Protest Content/Alternative Dispute Resolution (OCT 2018) 852.233-71 Alternate Protest Procedure (OCT 2018) 852.237-70 Contractor Responsibilities (xiii) All responses must include verification that each specification outlined in the Line Items, SOW, and any relevant attachments is/are met. (a) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful quoter within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award. The Government reserves the right to make no award if quote does not meet the requirements of this solicitation. CONTRACTOR IS RESPONSIBLE FOR CORRECT WAGE TITLE CLASSIFICATIONS OF THEIR EMPLOYEES AND COMPLIANCE WITH ALL APPLICABLE WAGE AND HOUR LAWS. The DOL Wage Determination for the specific locality applies to this solicitation and any contract awarded is available at https://beta.sam.gov/ Please note the listing below is not all-inclusive wage determination of each area of performance. It is the contractor s responsibility to obtain and evaluate each wage determination locality. Florida Counties of Hernando, Hillsborough, Pasco, Pinellas Wage Wage Determination No.: 2015-4571 Revision No.: 22 Date of Last Revision: 12/26/2023 The award will be made to the response most advantageous to the Government. Responses should contain your best terms, conditions. SUBMISSION OF QUOTES. Quote should be submitted as One combined PDF document at or before the exact time specified in due date of this solicitation by email to the Point of Contact listed below to include: A Quote on company letterhead and any needed attachments. Quotes must be submitted on the vendor s own form. To include Attachment 2 (Limitation of Subcontracting Certification) Provide Contractor Name, UEI#, Address, Point of contact(s) name, phone, and email. If NOT the manufacturer then an AUTHORIZED DISTRIBUTOR LETTER needs to be provided with your quote in order to be considered for the award (If Applicable). Prices need to include any FOB destination shipping cost. The Government is requesting discounts, notate any discounts. To facilitate the award process, all quotes must include a statement regarding the terms and conditions herein as follows: "The terms and conditions in the solicitation are acceptable to be included in the award document without modification, deletion, or addition." OR "The terms and conditions in the solicitation are acceptable to be included in the award document with the exception, deletion, or addition of the following:" Quoters shall list exception(s) and rationale for the exception(s), if any. There are no additional contract requirements, terms or conditions. (xiv) The Defense Priorities and Allocations System (DPAS) ratings are NOT APPLICABLE. Vendor Questions: Questions for information regarding the solicitation should be forwarded in writing via e-mail No Later Than 4/2/2024 15:00 pm EST. Vendor Answers: Answers to questions will be posted to FBO on 4/3/2024 by 15:00 pm EST. (xv) Quotes must be emailed to Walida.MooreSaintil@va.gov and received No Later Than 4/8/2024 15:00 pm EST on the close date. (xvi) Point of Contact: contact Walida Moore-Saintil at Walida.MooreSaintil@va.gov ; NO PHONE CALLS WILL BE ACCEPTED. NO LATES WILL BE ACCEPTED. End of Document See attached document: ATTACHMENT 1 - SOW. See attached document: ATTACHMENT 2 - Limitation of Subcontracting Certification.

Full description on SAM.gov

Award Overview

Award Number

36C24824P1258

Award Amount (SAM.gov award notice)

$69.7K

Award Date

May 1, 2024

Awardee

Awardee UEI

TFP4DN2MZBL7

Awardee CAGE Code

87MZ4

Original Solicitation

Notice ID: 33ef206ceeaf468ca5c4697edf5a4715

Posted Date: May 16, 2024

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

5
  • 36C24224C0003
    CALDAIA CONTROLS LLC
    Department of Veterans AffairsNAICS 238220
    $188.1KSigned Nov 3, 2026
  • 36C25521P0723
    CALDAIA CONTROLS, LLC
    Department of Veterans AffairsNAICS 238220
    $353.3KSigned Oct 26, 2026
  • 36C26226P1306
    CALDAIA CONTROLS LLC
    Department of Veterans AffairsNAICS 238220
    $456.1KSigned Oct 19, 2026
  • 36C24223P0627
    CALDAIA CONTROLS LLC
    Department of Veterans AffairsNAICS 238220
    $209.5KSigned Oct 16, 2026
  • 36C26226P1306
    CALDAIA CONTROLS LLC
    Department of Veterans AffairsNAICS 238220
    $446.0KSigned Oct 15, 2026

Contacts

Documents

No documents available.

Lifecycle

Solicitation:36C24824Q0490
  1. Combined Synopsis
  2. Awarded

This opportunity has been awarded.

  1. Combined SynopsisMar 27, 2024

    H944--Boiler Inspection, Testing and Calibration Services

    Notice 175afd7aae354671a85a1bcc63e57fa7 on SAM.gov

  2. 3×
    AwardedCurrentMay 16, 2024

    H944--FY24: Boiler Inspection, Testing and Calibration Services

    Notice 33ef206ceeaf468ca5c4697edf5a4715 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in the Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) 12.201-1, Simplified procedures. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued. The Department of Veterans Affairs, Network Contracting Office (NCO) 8, located at VA Caribbean Healthcare System (VACHS), is seeking to award a single firm-fixed-price requirements type contract for Preventive Maintenance and Repair Services for HVAC Water Chillers and Air Handling Units (AHUs) at the VA Caribbean Healthcare System (VACHS) . This solicitation is issued as an RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2026-01, effective on March 13, 2026 (and as supplemented by VA Deviations). TIERED EVALUATION. This solicitation will be evaluated using a tiered evaluation approach (also known as cascading set asides). The tiers for this procurement are: 1st Tier- Service-Disabled Veteran-Owned Small Business (SDVOSB) 2nd Tier- Small Business Evaluation will begin with the first tier. If the Government receives two or more acceptable quotes from the first tier, the evaluation will not proceed to the next tier. If fewer than two acceptable quotes are received at a given tier, the Government may proceed to evaluate the next tier. The associated North American Industrial Classification System (NAICS) code for this procurement is 238220, Plumbing, Heating, and Air Conditioning Contractors. The applicable small business size standard is $19,000,000. The Product Service Code (PSC) is J041, Maintenance, Repair, and Rebuilding of Equipment - Refrigeration, Air Conditioning, and Air Circulating Equipment. Detailed specifications and requirements are provided in the attached Performance Work Statement (PWS), Instructions to Quoters, Price/Cost Schedule, Clauses, and Provisions. The resulting contract will include a five-year ordering period. In addition, RFO Clause 52.217-8, Option to Extend Services, is included in the RFQ. Place of Performance San Juan Address: VA Caribbean Healthcare System 10 Casia St. San Juan, PR The full text of the RFO provisions or clauses may be accessed electronically at https://www.acquisition.gov/far-overhaul. The following solicitation provisions apply to this acquisition: RFO 52.212-1, Instructions to Offerors Commercial Products and Commercial Services. , [Sep 2023] [Deviation Nov 2025), including an addendum to this provision. Offerors shall carefully read the addendum, which provides further information regarding this requirement and the minimum information/documentation that shall be submitted with the quote. Offerors must complete annual representations and certifications electronically via the System for Award Management (SAM) website located at https://www.sam.gov/portal. The following contract clauses apply to this requirement: RFO 52.212-4, Contract Terms and Conditions Commercial Products and Commercial Services [Nov 2023] [Deviation Nov 2025](Addendum attached). See clauses in the attached document titled "S02 Attachments B_C_D_E RFQ 36C24826Q0366_PM Chillers and AHUs_25 June 2026 The contract award will be based upon a comparative evaluation of quotes in accordance with the evaluation process outlined in the RFO 12.203(c)(2). Comparative evaluation is the side by side pairwise comparison of quotes based on factors resulting in a Contracting Officer decision for the quote most favorable to the Government. To facilitate the award process, all quotes must include a statement regarding the terms and conditions herein as follows: "The terms and conditions in the solicitation are acceptable to be included in the award document without modification, deletion, or addition." OR "The terms and conditions in the solicitation are acceptable to be included in the award document with the exception, deletion, or addition of the following:" Quoters shall list exception(s) and rationale for the exception(s), if any. SITE VISIT. A site visit has been scheduled for December 1, 2026, at 10:00 AM. The meeting point will be at the VA San Juan Medical Center main entrance, next to the Police Station. Vendors interested in participating in the site visit shall send an email to Baryan Sierra at baryan.sierrapierluissi@va.gov with the participant names (maximum 2 per company). QUESTIONS SUBMISSION. Questions regarding this acquisition shall be emailed to the Contracting Officer, Baryan Sierra, at baryan.sierrapierluissi@va.gov. All questions shall be submitted as a Word document. All questions are due on December 7, 2026, at 10:00 AM (Puerto Rico Local Time). Questions submitted after the due date may not be considered by the Government. The Quote shall be received no later than January 12, 2027, at 10:00 AM (Puerto Rico Local Time) to Baryan Sierra at baryan.sierrapierluissi@va.gov. Late submissions shall be treated in accordance with the solicitation provision at RFO 52.212-1(c). The following attachments are part of this combined synopsis-solicitation:
-Combined Synopsis01/12/2027
RFQ 36C24827Q0061 Amendment No. 1 This amendment is hereby issued to provide responses to questions and requests for information submitted by vendors, provide a revised PWS to address a correction on Boiler #2 description, as well as an updated Price/Cost Schedule reflecting the corrected description. Description of Boiler #2 contained on PWS and associated Line Items (LINs) of Price/Cost Schedule is hereby changed to read: Boiler Unit Number 2 (Local identifier): Fire tube steam boiler manufactured by York-Shipley; Serial number 96-19937-H-11618 The due date for Quote Submittal is changed from November 6, 2026, to November 10, 2026 at 10 AM AST. All other sections of the solicitation remain unchanged. RESPONSES TO QUESTIONS RECEIVED: Q1. Semiannual Safety-Device Testing: VHA Directive 1810, Appendix A, Section 2(a), establishes that safety devices requiring semiannual testing are ordinarily tested once annually by VA medical facility personnel and once annually by a qualified testing contractor, unless an alternative arrangement is approved. Does the Government require the contractor to perform both semiannual testing events under this solicitation? If so, has the alternative testing arrangement received the required approval? VACHS Boiler Plant personnel will perform the required semiannual safety-device testing. The Contractor shall perform the safety-device testing required under the PWS during its scheduled annual inspection and testing services. Q2. Monthly Safety Device Testing: PWS Section V(Q) includes safety-device tests for which the VHA Boiler and Associated Plant Safety Device Testing Manual establishes monthly testing frequencies, including primary and auxiliary low-water cutoffs, high- and low-water alarms, and the main flame-scanner flame-out test. Does the Government require the contractor to perform these tests monthly throughout the contract period, or will VACHS personnel continue performing the monthly tests while the contractor performs the scheduled maintenance and safety-device testing services? VACHS Boiler Plant personnel will perform the required monthly safety-device testing. Q3. Frequency of Nondestructive Testing, Component Replacement and Engineering Evaluations: PWS Sections V(I), V(L), V(U), V(V), and V(W) establish requirements involving component replacement, nondestructive testing (NDT), pressure-vessel inspections, and engineering evaluations, including ultrasonic thickness measurements, magnetic-particle examinations, and assessments of maximum allowable working pressure (MAWP) and remaining useful life. However, VHA Directive 1810, Appendix B, Table 2, establishes different inspection frequencies depending on the activity. For example, annual boiler inspections are required, whereas internal deaerator weld examinations using wet magnetic-particle testing are required at six-year intervals. Clarify the following: a. Nondestructive Testing: Are ultrasonic thickness measurements and magnetic-particle examinations required annually for each boiler and the deaerator, or are these examinations required only when indicated by inspection findings, equipment conditions, or established inspection intervals? The scope of this requirement applies to the Boilers only. b. Deaerator Weld Examination: Is the six-year internal deaerator weld examination required during the base contract period or any of the option years? If so, please identify the date of the most recent examination and the next scheduled examination. Not applicable. This service is cover under another service contract c. Engineering Evaluations: Are MAWP calculations, remaining-useful-life assessments, and deterioration-rate evaluations required annually for each boiler, deaerator, and condensate return tank, or only when inspection findings or equipment conditions warrant such evaluations? Not applicable. This service is not covered under this requirement. d. Component Replacement: Are component replacements identified in the PWS mandatory during each annual maintenance period, regardless of condition, or are replacements required only when inspection or testing establishes a deficiency, except where the PWS expressly requires replacement? Mandatory parts to be replaced annually during annual maintenance, regardless of its conditions: Sight glass with new seals, Compress air belt, oil filters, air filter, water gasket seal kits and fire side gaskets seal kit. e. Firetube Inspection Methods and Waterside Deterioration: PWS Section V(U) references fiberoptic inspection of boiler tubes, while Section V(V) establishes ultrasonic thickness measurement requirements. In a firetube boiler, fiberoptic examination from inside a tube primarily evaluates its fireside surface and does not directly establish the condition of the exterior waterside surface, where corrosion and pitting may occur. Please clarify whether the Government requires fiberoptic visual examination, ultrasonic thickness measurements, or additional examination methods capable of evaluating tube-wall deterioration affecting either surface. The Government requires the inspection methods specified in the Performance Work Statement (PWS). Fiberoptic inspection and ultrasonic thickness testing are complementary requirements, and both shall be performed. f. Boiler Tube Quantities and Technical Documentation: For each boiler, please identify the total number of firetubes, nominal tube diameter, original wall thickness or gauge, and applicable tube specifications. Please provide, if available, manufacturer drawings, tube-layout diagrams, pressure-vessel drawings, or other technical documentation identifying the shell, tube arrangements, tube sheets, and applicable pressure-retaining components, so that offerors can quantify the inspection scope. The Government has provided all available identifying information and that quotes/offers should be based on the PWS requirements and field verification. g. Extent of Tube Examination and Sampling Requirements: Does the Government require examination and wall-thickness measurements of every firetube in each boiler, or is an engineer-justified representative sampling program acceptable? If sampling is permitted, please identify any minimum sample quantity or percentage, prescribed examination locations, acceptance criteria, and requirements for expanding the examination when initial results reveal pitting, corrosion, thinning, or other deterioration. May the qualified inspecting engineer establish and justify the sampling methodology based on equipment condition, applicable standards, and inspection findings? The Government does not require examination or ultrasonic thickness measurements of every firetube. The Performance Work Statement requires inspection of a representative number of tubes and ultrasonic thickness testing of representative samples, with additional testing of areas exhibiting indications of corrosion, erosion, or other deterioration. The Contractor's Qualified Professional Inspector may establish and justify the sampling methodology using professional engineering judgment and applicable industry standards, provided the inspection is sufficient to assess equipment condition and support all required findings, calculations, and recommendations. h. Boiler shell examination and engineering certification: Please identify the required extent of ultrasonic thickness measurements and other nondestructive examinations of boiler shells, tube sheets, and other applicable pressure-retaining components. For the MAWP, deterioration-rate, and remaining-useful-life evaluations required by the PWS, does the Government require a formal report signed and sealed by a licensed Professional Engineer? Please identify any specified inspection coverage, minimum-thickness criteria, engineering standards, or historical thickness data to be used. Must the engineering determinations address the complete boiler pressure vessel, including firetubes and shell, or only components examined under the prescribed inspection program? The Government requires ultrasonic thickness testing of representative samples and all areas exhibiting signs of corrosion, erosion, or other deterioration. PWS does not prescribe specific inspection coverage percentages, minimum thickness criteria, historical thickness data, or a requirement for a signed and sealed Professional Engineer report. The Contractor shall use applicable ASME Code requirements, inspection findings, and professional judgment to perform the required MAWP, deterioration-rate, and remaining-life evaluations and document the results in the final report. Q4. The PWS incorporates maintenance, inspection, and testing requirements applicable to the deaerator (DA) and condensate return tank (CRT), as established by VHA Directive 1810 and the VHA Boiler and Associated Plant Safety Device Testing Manual. However, the solicitation provides pricing contract line items (CLINs) only for the three steam boilers and does not identify the DA and CRT equipment specifications. To establish the equipment covered by the contract and prepare an accurate firm-fixed-price quotation, please clarify the following: a. Identify the manufacturer, model, serial number, and quantity of each DA and CRT included within the contractual scope of work. b. Provide the vessel capacity, design pressure, normal operating pressure, and applicable ASME identification or nameplate information for each DA and CRT. c. Provide, if available, the applicable manufacturer maintenance instructions, equipment data sheets, and relevant drawings identifying the installed DA and CRT configurations. d. Should offerors allocate the costs associated with DA and CRT maintenance, inspection, and testing among the three existing boiler CLINs, or will the Government establish separate CLINs for these services? Not applicable. This service is not covered under this requirement. Q5. PWS Section V(I) requires the contractor to replace, calibrate, and test boiler steam safety valves, with calibration and/or testing performed onsite. The VHA Boiler and Associated Plant Safety Device Testing Manual also establishes testing requirements applicable to boiler, deaerator, and pressure-reducing valve (PRV) downstream safety valves. To determine the complete scope of testing, calibration, and replacement services and prepare an accurate firm-fixed-price quotation, please clarify the following: a. Identify the total number of steam safety valves included within the contractual scope of work, specifying their installed locations, including those associated with each steam boiler, the deaerator tank, and downstream of the steam pressure-reducing valve (PRV). Review the VHA Boiler and Associated Plant Safety Device Testing Manual for guidelines and for typical safety devices equipment in a Boiler. b. For each safety valve, provide the manufacturer, model, nominal inlet and outlet sizes, serial number or other identification, and applicable ASME/National Board certification information. Review the VHA Boiler and Associated Plant Safety Device Testing Manual for guidelines and for typical safety devices equipment in a Boiler. c. Identify the set pressure (psig), rated steam discharge capacity (lb/hr), and applicable pressure and temperature ratings for each valve. The Government does not have verified safety valve set pressures, steam discharge capacities, or pressure/temperature ratings available for distribution under this solicitation. Offerors shall base their quotes/offers on the requirements of PWS and the identified boiler equipment. Verification of valve nameplate data and equipment ratings shall be performed during the inspection and testing activities required under the contract. d. Please confirm whether each of the three steam boilers is equipped with two safety valves, reportedly set at 130 psig and 135 psig, respectively, and whether the deaerator system includes one safety valve installed on the tank and another downstream of the PRV. Please identify any additional safety valves included within the contractual scope. Each of the three boilers is equipped with two steam safety valves with nominal set pressures of 130 psig and 135 psig, respectively. The contractual scope includes the inspection, testing, calibration, and evaluation of these boiler safety valves and associated boiler safety devices identified in the PWS. The deaerator system and its associated safety valves are not included within the scope of this contract. Offerors shall base their quotations on the solicitation requirements. Verification of installed equipment, valve nameplate data, and operating condition shall be performed during contract execution. e. Does PWS Section V(I) require replacement of all existing boiler steam safety valves during each annual maintenance period, regardless of their condition, or is replacement required only when a valve fails inspection or testing? Please also clarify whether any replacement requirement applies to the deaerator and PRV downstream safety valves. The Government's intent is to inspect, test, and calibrate the boiler steam safety valves. Replacement is required only when a safety valve cannot be successfully calibrated, fails testing, or is otherwise determined to be defective or unserviceable. This requirement applies to the boiler steam safety valves within the scope of the PWS. f. Please identify whether the Government requires onsite testing and certification of all applicable safety valves, including the boiler, deaerator, and PRV downstream valves, and whether any valves must be removed for shop testing, repair, or recertification. The Government requires testing and calibration of the boiler safety valves in accordance with the PWS. Valve removal, shop testing, repair, recertification, or replacement shall only be required when a valve cannot be successfully tested, calibrated, or is otherwise determined to be defective or unserviceable. The PWS does not specifically require testing, certification, removal, repair, or replacement of deaerator or downstream PRV safety valves. g. Please provide an equipment schedule or existing valve inventory, if available, identifying the specifications and locations of all safety valves included within the contract. The Government does not have an equipment schedule or valve inventory available for distribution under this solicitation. The boiler scope includes six (6) steam safety valves total, consisting of two (2) safety valves per boiler with nominal set pressures of 130 psig and 135 psig. Offerors shall base their quotations on the solicitation requirements. Verification of valve specifications, nameplate data, and exact locations shall be performed during contract execution. Q6. The solicitation identifies the manufacturers and serial numbers of the three steam boilers; however, the Performance Work Statement does not identify whether the boilers and their associated systems remain in their original equipment manufacturer (OEM) configurations or have undergone subsequent alterations, modifications, equipment replacements, or retrofits. Clarify the following: a. Whether any of the three boilers have undergone modifications or alterations from their original OEM configurations, including replacement or retrofitting of the original burner assemblies. b. For each boiler with modifications or retrofits, identify the manufacturer, model, and configuration of the replacement equipment and describe the extent of the alterations necessary to integrate that equipment into the existing boiler system. c. Identify all additional, replacement, or modified components associated with such alterations, including, but not limited to, fuel pumps, fuel-pressure regulating or throttling valves, fuel-train components, piping arrangements, combustion controls, burner management systems, safety interlocks, instrumentation, electrical controls, and associated auxiliary equipment. d. Identify any additional equipment or components installed as part of these modifications that are included within the maintenance, inspection, calibration, testing, or repair requirements of the current PWS. e. Where the installed equipment differs from the original OEM configuration, identify the applicable manufacturer maintenance and testing requirements and provide, if available, current as-built drawings, equipment schedules, control diagrams, operating sequences, and documentation of the modifications. The Government does not have modification records, as-built drawings, equipment schedules, control diagrams, or other documentation available for distribution under this solicitation. Offerors shall base their quotations on the equipment identified in the PWS and the requirements specified therein. Any existing field modifications, retrofits, equipment replacements, or deviations from the original OEM configuration shall be identified and documented by the Contractor as part of the inspection, testing, and evaluation activities required under the contract Q7.PWS Section V(B) requires inspections, testing, and calibrations to comply with the written recommendations of the equipment manufacturers, the VHA Boiler and Associated Plant Safety Device Testing Manual, and applicable NFPA 85 requirements. The Superior Boiler manufacturer s maintenance instructions prescribe certain daily, weekly, and monthly operational and functional checks, as well as semiannual fireside cleaning and associated maintenance activities. However, VHA Directive 1810, Appendix B, Table 3B, establishes an annual fireside-cleaning frequency for high-pressure steam boilers. The Directive also distinguishes routine boiler-plant operational duties from inspections and testing that must be performed by qualified contractors. Please clarify the following: a. Are the daily, weekly, and monthly manufacturer-recommended operational and functional checks required to be performed by the contractor at the specified frequencies, or will these activities remain the responsibility of VACHS boiler-plant personnel? Daily, weekly, and monthly operational and functional checks identified in the manufacturer's operating and maintenance manuals are considered routine boiler plant operational activities and shall remain the responsibility of VACHS boiler plant personnel. The Contractor is not required to perform recurring daily, weekly, or monthly operational checks at the frequencies specified by the manufacturer unless such services are specifically included in the approved maintenance schedule developed under this contract. b. Does the Superior Boiler manufacturer s semiannual fireside-cleaning recommendation require the contractor to perform two complete fireside-cleaning services annually, rather than the single annual fireside-cleaning service established by VHA Directive 1810, Appendix B, Table 3B, or is one annual fireside-cleaning service sufficient to satisfy the contractual requirements? Contractor shall perform one comprehensive fireside cleaning and inspection annually in accordance with the PWS requirements and applicable VHA guidance. If, during the course of inspection or operation, conditions are identified that warrant additional cleaning, the Contractor shall document the condition and provide recommendations to the COR for review and consideration. c. Are other manufacturer-recommended maintenance activities exceeding the frequencies established by VHA Directive 1810 required to be performed by the contractor, or will the contractor s responsibilities be limited to the maintenance, inspections, calibrations, and safety-device testing specifically scheduled under the PWS? The Contractor shall comply with the maintenance, inspection, calibration, testing, evaluation, and reporting requirements specifically identified in the PWS. Manufacturer recommendations should be utilized as part of the Contractor's technical evaluation and execution of the required services. However, the contract does not require the Contractor to perform additional recurring maintenance activities at frequencies exceeding those established in the PWS unless specifically directed by the Government or otherwise determined to be necessary based on observed equipment condition. Q8. With reference to PWS Section V(O), will the Government provide an inventory of the installed boiler plant instrumentation requiring periodic calibration, including pressure gauges, thermometers, pressure and temperature transmitters, oxygen analyzers, and other applicable measuring and control devices? No. The Government will not provide an instrumentation inventory. Offerors shall base their quotations on the requirements of PWS, including calibration of all applicable measuring and control devices associated with the boiler systems. Verification and identification of installed instrumentation shall be performed during contract execution. Q9. If available, please identify each instrument s equipment location, manufacturer, model, measuring range, quantity, calibration frequency, and applicable acceptance tolerances. The Government does not have this information available for distribution under this solicitation. Offerors shall base their quotation on the requirements of the PWS. The Contractor shall identify the installed instrumentation requiring calibration and perform the required calibration, testing, and documentation in accordance with the manufacturer s recommendations and applicable industry standards. Q10. Clarify whether the contractor is responsible for replacing instruments that fail calibration or are determined to be defective, and whether such replacements are included in the firm-fixed-price maintenance scope or authorized separately as corrective work. The Contractor shall identify and document any instruments found to be defective or unable to be successfully calibrated and shall notify the COR. Replacement of defective instruments is not included in the firm-fixed-price maintenance scope and, if required, will be addressed separately by the Government Q11. Please confirm whether the boiler plant currently has an installed propane/combustible gas leak detection system, including the number and location of detectors, manufacturer and model, associated control panels, audible/visual alarms, and any connections to the boiler burner-management or fuel-gas safety-shutdown systems. The boiler plant is equipped with a propane/combustible gas detection alarm system. However, the gas detection system is independent of the boilers and their burner management systems and does not automatically initiate boiler shutdown or fuel shutoff functions. Q12. Please clarify whether the contractor is responsible for: a. Periodic inspection, calibration, and functional testing of the gas detectors. Limited to the detector that is part of the boiler safety or combustion control system that is specifically within the scope of the PWS. b. Verification of alarm setpoints and detector response. Only for those that are part of the equipment specifically covered by the PWS. c. Functional testing of associated alarms, gas shutoff valves, and boiler shutdown interlocks, where installed. The Contractor shall perform testing of safety devices, alarms, shutoff valves, and interlocks specifically identified in PWS Section V(Q). d. Replacement of defective or expired sensors or detectors. No. Replacement of defective, failed, expired, or obsolete gas detectors or sensors is not included in the firm-fixed-price scope of this contract. Any deficiencies identified during the performance of the work shall be documented and reported to the COR. Recommended corrective actions shall be provided for Government review. e. Providing calibration certificates and documented functional-test results. Calibration certificates and test results shall be provided for equipment and instruments calibrated and tested under the scope of the PWS. The Contractor shall document all testing, calibration, and inspection activities in the required service reports. If these services are required, please identify the applicable testing and calibration frequencies and whether replacement components are included in the firm-fixed-price maintenance scope or addressed separately as corrective work. See responses above for each one. Q13. Is this a brand-new contract, or is there an incumbent performing the services? If not brand new, please provide current/previous contract number? This is a follow-on contract being procured as a competitive set-aside for SDVOSB verified vendors. Latest contract number is 36C24822P0298. This information is publicly available on Federal Procurement Data System (FPDS) at www.sam.gov and/or US Spending at https://www.usaspending.gov/ Current contractor information may be requested and disclosed under Freedom of Information Act (FOIA) in accordance with 38 Code of Federal Regulations (CFR) 1.553(b). The VA accepts FOIA requests submitted via email. Email must be sent to SAJFOIA@va.gov , for additional information about FOIA regulations and procedures, please visit www.foia.va.gov Q14. PWS V.I requires the contractor to "replace, calibrate and test the steam safety valves." Must the safety valves be replaced every year, or only if they fail testing? Please provide the number, size and set pressure of the safety valves on each boiler. The intent of PWS Section V.I is to ensure that all steam safety valves are properly inspected, calibrated, tested, and capable of performing their intended safety function in accordance with applicable codes, standards, and manufacturer requirements. PWS does not require the automatic annual replacement of steam safety valves solely based on the passage of time. Safety valves shall be evaluated, calibrated, and tested as part of the required services. Replacement shall be required if a valve fails testing, cannot be properly calibrated, exhibits deficiencies affecting safe or reliable operation, or is otherwise determined to be unsuitable for continued service. The Government does not have the number, size, or pressure data for all installed safety valves readily available at this time. The Contractor shall verify the installed safety valve configuration, including quantity, size, capacity, set pressure, and condition, as part of the required inspection and assessment services and shall document this information in the inspection report. Any safety valves identified as deficient or requiring replacement shall be immediately reported to the COR, along with recommendations for corrective action. Q15. Please provide the horsepower, design pressure and fuels (natural gas, No. 2 fuel oil, LPG pilot) for each of the three boilers. Boiler #1; Size: 300HP; Boiler Operating Pressure: 110 psi Boiler #2; Size: 250HP; Boiler Operating Pressure: 110 psi Boiler #3; Size: 300HP; Boiler Operating Pressure: 110 psi Q16. Does the annual NDT scope in PWS V.V and V.W (ultrasonic thickness grid, magnetic particle testing, MAWP and remaining-life calculations) apply to the deaerator and condensate tanks every year, or only in certain contract years? The NDT requirements identified in PWS Sections V.V and V.W apply to the boilers and associated equipment within the scope of this contract. The deaerator (DA) and condensate receiver tank (CRT) inspections, testing, NDT evaluations, MAWP calculations, and remaining life assessments are covered under a separate service contract and are not included within the scope of this requirement. Q17. Will a site visit be offered before the closing date? If so, please provide the date, time and point of contact. Site Visit will not be conducted at this time. Prepare and submit Quotes/Offers at your best terms based on the information contained in the RFQ. Q18. Is there an incumbent contract for this requirement? If so, please provide the contract number. See Q13 response above. Q19. Replace Safety Valve: Will the cost of new Valves be covered by the site? Replacement shall be required if a valve fails testing, cannot be properly calibrated, exhibits deficiencies affecting safe or reliable operation, or is otherwise determined to be unsuitable for continued service. Q20. Replace Gage Glass: Will new Gage cost be covered by the site? No. The cost of replacement gage glasses shall be included in the Contractor's quotation and contract pricing. Q21. Cleaning - Will Gaskets be provided by the Site or Contractor? No. The cost of replacement gage glasses shall be included in the Contractor's quotation and contract pricing. Q22. Testing - How often will Non-Destructive Testing be required? Annually, once over the 5-year period? Additionally, will NB Inspector be required on-site during Non-Destructive Testing? See Q16 response above. Q23. When was the last maintenance and testing done on each boiler? Boiler #1: February 2026 Boiler #2: December 2025 Boiler #3: June 2026 Q24. Is there a set maintenance and testing schedule? In accordance with PWS Section IV.J and Sections V.19 and V.20, the Contractor shall develop and submit a detailed schedule for the required inspections, testing, calibrations, and maintenance activities in coordination with the PM/COR. Q25. Will an on-site visit be required as soon as the contract is awarded and the contractor can align a technician to be on site? An immediate on-site visit upon contract award is not required by the PWS. However, the Contractor shall coordinate with the PM/COR and provide the required advance notice in accordance with the contract requirements prior to performing any inspection, testing, calibration, or maintenance activities. Following contract award, the Government anticipates coordinating a kickoff meeting and scheduling activities with the Contractor to facilitate execution of the work. The timing of any on-site visit shall be mutually coordinated between the Contractor and the PM/COR, taking into consideration boiler plant operations, facility needs, personnel availability, and the requirement that no more than one boiler be removed from service at a time. Q26. There is a detailed description of what is required for testing the boilers but not for maintenance. a. What is the maintenance schedule? Daily, monthly, quarterly, yearly? The Contractor shall perform the maintenance, inspections, testing, calibrations, and assessments required by the PWS during each contract year. The specific schedule for execution of the work shall be developed by the Contractor and coordinated with the PM/COR in accordance with PWS Sections IV.J, V.19, and V.20. The contract does not require the Contractor to perform daily, weekly, or monthly routine operational checks unless specifically identified in the PWS. b. Does the VA have an in-house technician that will be providing daily checks, and then the contractor for this contract does quarterly and yearly maintenance and testing? VACHS personnel perform the routine operation and monitoring of the boiler plant, including day-to-day operational activities. The Contractor's responsibilities under this contract are limited to the preventive maintenance, inspections, testing, calibrations, safety-device testing, evaluations, and reporting specifically required by the PWS. Q27. The CLN structure is currently set up as 1 all-inclusive price. What should be included in that price? a. What parts, if any, is the contractor expected to furnish? The Contractor shall furnish all labor, materials, consumables, tools, instrumentation, and equipment necessary to perform the services required by the PWS. This includes replacement parts and materials specifically identified in the PWS, such as gage glasses, gaskets, air compressor belts, refractory patching materials, and other consumable items necessary to complete the required maintenance, testing, and inspection activities. Repairs or major component replacements identified during the inspection process that are not specifically required by the PWS shall be documented and reported to the COR for review and disposition. b. Is there a certain number of hours of labor time that the VA would like us to include? If one contractor budgets 50 hours of labor while another budgets for 25 hours of labor, their pricing will vary drastically. This is a performance-based services acquisition, the Government expects Offerors to thoroughly review the PWS and submit their best quotation/offer based on their experience, and commercial practices. Offerors shall independently determine the labor resources necessary to perform complete preventive maintenance, inspection, testing, calibration, evaluation, and reporting service for each boiler in accordance with the PWS, applicable codes and standards, manufacturer recommendations, and VA requirements. The Government's expectation is that each boiler receives a complete maintenance and testing service as required by the contract. The maintenance activities will be scheduled throughout the year and coordinated with the PM/COR to avoid disruption to facility operations. c. How many visits are required per year? Same as labor, 1 contractor may budget 2 trips, and another contractor may budget 12 trips. This is a performance-based requirement, the Government has not established a minimum or maximum number of site visits. Offerors shall determine the number of visits necessary to perform all contract requirements and shall include all associated costs in their proposed price. The Contractor shall develop and coordinate the work schedule in accordance with the PWS. The Contractor is responsible for identifying the resources and site visits necessary to successfully perform the required services. d. Are we to include pricing for emergency work? Labor, parts, boiler rental in case of a catastrophic failure? No, PWS/SOW is for maintenance and testing, as described following applicable manufacturer recommendations. Q28. Are there any active and known problems or deficiencies with the boilers? Page 10 of the solicitation states The service required must restore steam boiler units back in service as described in the manufacturer s manual . If a boiler has a known problem, we will need to know what that is to accurately bid the project. If it is a simple part replacement, it may only cost $100 for parts and 2 hours of labor. If the boiler needs a new motor, that would most likely be thousands of dollars and at least 2 full days of labor. The Government does not maintain a list of known deficiencies and does not warrant the condition of any boiler, component, or ancillary equipment beyond the information provided in the solicitation. The Contractor is responsible for evaluating the condition of the boilers and associated equipment as part of the inspection, testing, maintenance, and assessment services required by the PWS. The intent of the requirement stating that the boilers be restored to service in accordance with manufacturer recommendations is to ensure that the Contractor performs the specified maintenance, testing, calibrations, inspections, and adjustments necessary to verify operational readiness and identify conditions affecting performance and reliability. Any deficiencies identified during performance shall be documented and promptly reported, together with the Contractor's recommendations for repair, replacement, or other corrective action. Repairs or major component replacements not specifically required by the PWS are not included in this contract and shall be addressed separately by the Government, as appropriate. Q29. Is an on-site SSHO or Superintendent required? Must the be directly employed by the contractor? If the awarded contractor use a subcontractor, could the SSHO/Sup be employed by the sub? The Contractor shall be responsible for providing adequate supervision and safety oversight necessary to perform the work safely and in compliance with all applicable federal, state, local, VA, OSHA, and facility safety requirements. The Contractor shall ensure that personnel performing the work possess the qualifications and certifications required by the PWS. Q30. Are there any geographic or linguistic requirements? Examples: Must the contractor turn in a Spanish and English copy of all reports? Must the on-site technician be fluent in Spanish? Must the on-site technician be a resident of Puerto Rico? No, all reports are to be turned in English, as English is the Federal Government official business language. Being able to communicate in Spanish may be beneficial but it is not required. There is no residency requirement, is up to the Contractor to determine the best approach based on their experience. Performance shall comply with the required frequency and required response time as per PWS/SOW.
-Combined Synopsis11/10/2026
Intent to Consolidate Notice: The Department of Veterans Affairs (VA) is providing the attached consolidation notice to industry for Preventive Maintenance and Repair Services for HVAC Water Chillers and Air Handling Units (AHU) at the VA Caribbean Healthcare System (VACHS) in accordance with the Revolutionary FAR Overhaul 7.107-3(b) requiring a notification to the public of consolidation requirement after making the formal determination. Intent to Consolidate Notice Point of Contact: Contracting Officer: Baryan Sierra; Email: baryan.sierrapierluissi@va.gov
-OtherOpen
The Department of Veterans Affairs, VA Caribbean Healthcare System (VACHS), Network Contracting Office 8 (NCO-8) intends to negotiate a sole-source short-term bridge contract under the authority of the Revolutionary FAR Overhaul (RFO) 12.102(a). The associated NAICS code for this service is 238220 with a size standard of $19,000,000 and PCS Code J041. The identified vendor is Multi Air Services Engineers, Corp., as the incumbent under the current contract. The Facilities Management Service (FMS) requires preventive maintenance services for HVAC Water Chillers at the VA Caribbean Healthcare System. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items, and non-personal services necessary to perform preventive and corrective maintenance services to HVAC Water Chillers at VACHS as defined in the Performance Work Statement (PWS). This notice of intent is not a request for competitive quotes. It is not a solicitation or request for offers. No solicitation package is available. Respondents must provide clear and convincing evidence that competition would be advantageous to the Government. Responses must be received no later than August 24, 2026, at 10:00 AM (Puerto Rico local time) to Baryan Sierra at baryan.sierrapierluissi@va.gov.
-Special Notice08/24/2026
1. General: Project Location: C.W. Bill Young VA Medical Center located at, 10000 Bay Pines Blvd. Bay Pines, FL. 33744. These nine (9) emergency exit signs fixtures are for the Laundry Building (Building 13) by the Project Manager: Dale McDowell, Fire Protection Engineer. 2. Purpose: Provide all labor, materials, equipment, supervision, and testing necessary to furnish and install nine (9) illuminated emergency exit signs throughout Laundry Building, to improve occupant egress identification and life safety. This solicitation will be a Firm Fixed Price SDVOSB set aside, this solicitation will start on or about the 10th of November.
-Pre-Solicitation11/11/2026

Additional Details

Solicitation Number

36C24824Q0490

Archive Date

Jul 15, 2024

Office Address

TAMPA, FL, 33637