GovChime
Notice ID: d493a241125b4daaaf6e5ecdc8a88183Combined Synopsis/SolicitationArchived

Z1DA--Project 626-22-103_Video Surveillance Security TVHS VAMC - Nashville Campus

Archived on October 30, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM CDT
Posted
September 15, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
NAICS
238210: Electrical Contractors and Other Wiring Installation Contractors
Agency
Department of Veterans Affairs

Notice details

Office
249-NETWORK CONTRACT OFFICE 9 (36C249)
Place of performance
TN Valley Healthcare System VAMC Nashville Campus, Nashville, Tennessee, 37212
Last updated
Oct 30, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
36C24926R0065
Notice ID
d493a241125b4daaaf6e5ecdc8a88183

Description

Solicitation No. 36C24926R0065 is hereby cancelled in its entirety. This cancellation is issued as part of the corrective action taken in response to the Government Accountability Office (GAO) protest process. In accordance with the GAO’s findings and the Department’s corrective action plan, the Government will reevaluate its requirements and implement any necessary revisions. No further proposals will be accepted under this solicitation.

_____________________________________________________________________________________________

Combined Synopsis/Solicitation Notice Page 12 of 1212 This is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with Revolutionary Federal Acquisition Regulation Overhaul (RFO) Part 12 Acquisition of Commercial Products and Commercial Services and RFO Part 36 Construction and Architect-Engineer Contracts with additional information included in this notice. This announcement constitutes the written solicitation document; quotes are being requested at this time. This solicitation is issued as a Request for Quote (RFQ). The solicitation document and incorporated provisions and clauses are those in effect through RFO. This requirement is a 100% set-aside for Service-Disabled Veteran Owned Small Business (SDVOSB) concerns under the authority of 38 U.S.C §8127(d). Only those SDVOSB s listed and viewable in the SBA database located at https://veterans.certify.sba.gov/. The database will be checked at the time of offer submission as well as prior to award. All offers must also have an active listing in the System for Award Management (SAM) database https://sam.gov/. The awarded contractor must also submit evidence of enrollment with VETS4212. In addition to the requirements, as set forth in the combined synopsis/solicitation notice (to be issued), the proposed contractor must also be determined responsible in accordance with RFO Part 9 Contractors Qualifications. The Contracting Officer (CO) will determine responsibility prior to any award being made. The associated North American Industrial Classification System (NAICS) code for this procurement is 238210 Electrical Contractors and Other wiring Installation Contractors, applies to this requirement. The small business size standard is $45M. Product/Service Code: Z1DA Maintenance of Hospitals and Infirmaries The TN Valley Healthcare System (TVHS) Nashville Campus, 1310 24th Avenue South, Nashville, TN 37212 has a requirement to Project Number 626-22-103 Video Security Surveillance. Contractor to provide a more reliable, compliant, and modernized video surveillance system. The estimated range of construction is Between $2,000,000 and $5,000,000 Wage Determination Davidson County Building DBA TN20250178 06-05-2025 is applicable. Wage Determination Davidson County SCA 2015-4647 REV31 05-13-2026 is applicable Questions related to this requirement will only be addressed in writing by way of email to the Contract Specialist (CS) at lara.hamtpon@va.gov and Contracting Officer (CO) at jeannette.morphew@va.gov. The Project Number, Project Name and Solicitation Number must be included in the subject line of all questions related to this requirement. IMPORTANT SUBMISSION INFORMATION SOLICITATION MATERIALS: All solicitation materials consisting of drawings, specifications, contract forms, amendments, and other documents will be posted to the Contract Opportunities Government website located at https://sam.gov/. Enter 36C24926R0044 into the search box to access the solicitation materials. This is the only official location where these documents can be obtained and where updates are posted. No hard copy solicitation materials are available. SOLICITATION SUBMISSION: The following documents must be included in the solicitation submission in the formats as stated: One (1) electronic copy of an original, fully completed and signed and dated Standard Form (SF)1442 Offer page, acknowledgment of all amendments issued by either completing block 19 of the SF1442 or completing blocks 15a, b, and c of the Amendment(s) and providing them with the SF1442 Offer page; prices on all line items listed on the Price/Cost Schedule; completed Representations and Certifications section (Revolutionary Federal Acquisition Regulation (RFO) Overhaul 52.209-5 and 52.209-7); and fully completed Contractor Experience Modification Rate (EMR) Certification documents. One (1) electronic copy of an original, completed and signed, SF24 Bid Bond or other allowable Bid Security. Document shall be emailed to the CS Lara Hampton at lara.hampton@va.gov and CO Jeannette L. Morphew at jeannette.morphew@va,gov responsible for solicitation in accordance with RFO 28.101 and RFO 28.102. Any missing elements of the bid bond submission could render the offeror ineligible and their offer will not be considered. Offerors are responsible for insuring and verifying their offer and all required solicitation documents are received at the office and point of contact designated in block 8 of the SF1442 and by the date and time specified in block 13a of the SF1442 (subject to amendment). FEDERAL HOLIDAYS: Federal Law (5 U.S.C. 6103) establishes the following public holidays for Federal employees: New Year s Day, Martin Luther King, Jr. Day, President s Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving, and Christmas. Please note that most Federal employees work on a Monday through Friday schedule. For these employees, when a holiday falls on a non-workday -- Saturday or Sunday --the holiday usually is observed on Monday (if the holiday falls on Sunday) or Friday (if the holiday falls on Saturday). Contractor employees shall not be considered government employees for any purpose under this contract. Changes to any resultant contract may only be made by a written modification which is formally executed by the contractor and the CO. DATABASE REGISTRATION INFORMATION SYSTEM FOR AWARD MANAGEMENT (SAM) REGISTRATION: The SAM website is located at https://sam.gov/ is the Official U.S. Government system that consolidated the capabilities of the Central Contractor Registration (CCR including FedReg), Online Representations and Certifications Application (ORCA), and the Excluded Parties List System (EPLS). Federal Acquisition Regulations require contractors wishing to do business with the Government and bid on work shall have an active registration in SAM at both time of offer and time of award. If the Offeror does not have an active registration in the SAM database at the time of offer submission and is the apparently successful low offeror, the CO shall deem the offeror s proposal non-responsive to the solicitation requirements and proceed to award to the next lowest offer. Offerors must submit proof of current (as of time of offer) SAM registries with their offer and that any offeror that fails to do so will be rendered technically unacceptable/non-responsive outright and will not be considered for award. THE EXCLUDED PARTIES LIST SYSTEM (EPLS): To ensure that the individuals or businesses providing services under the contract have not engaged in fraud or abuse regarding Sections 1128 and 1128A of the Social Security Act regarding federal health care programs, the contractor is required to check the EPLS located at https://sam.gov/ for each person or business providing services under this contract. During the performance of this contract the Contractor is prohibited from using any individual or business listed on the List of Excluded Individuals/Entities. SMALL BUSINESS ADMINISTRATION (SBA) DYNAMIC SMALL BUSINESS SEARCH: (DSBS) REGISTRATION: The SBA DSBS website located at https://www.sba.gov/ is the Official U.S. Government system. VAAR 819.7001(a) requires contractors wishing to do business with the Government and bid on work shall have an active registration in SBA DSBS at both time of offer and time of award. If the Offeror does not have an active registration in the SBA DSBS database at the time of offer submission and are the apparently successful low offeror, the CO shall deem the offeror s proposal non-responsive to the solicitation requirements and proceed to award to the next lowest offer. Offerors must submit proof of current (as of time of offer) SBA DSBS registries with their offer and that any offeror that fails to do so will be rendered technically unacceptable/non-responsive outright and will not be considered for award. Joint Ventures (JVs) submitting an offer must submit SBA DSBS and/or SBA certification of some type with their offer and those that fail to do so shall be rendered technically unacceptable and shall not be eligible for award. VETS-4212 REPORTING REQUIREMENT: Contractors are required to submit a required annual Form VETS-4212, Federal Contractor Veterans' Employment Report in all cases where the contractor or subcontractor has received an award of $100,000 or more in any fiscal year. COs are prohibited from awarding a contract to a contractor that has not submitted a required VETS-4212 Report with respect to the preceding fiscal year if the contractor was subject to the reporting requirement of 38 U.S.C. 4212(d). Submit this report as soon as possible, if not already submitted, to avoid delays in the contract award process. For more information on this requirement and/or for completing the web-based reporting form, visit the following website https://www.dol.gov/agencies/vets/programs/vets4212. See RFO clause 52.222-37, Employment Reports on Veterans under the General Conditions. BONDING INFORMATION BID GUARANTEE: A bid guarantee is required in an amount not less than 20 percent of the bid price but shall not exceed $3,000,000.00. Failure to furnish the required bid guarantee in the proper form and amount, by the time set for opening of bids, shall require rejection of the bid in all cases except those listed in RFO 28.101-4. Bid Bonds must be provided using SF24 (see RFO 28.106-1) and the form must be provided in original (no white outs, faxed or copied signatures, seals) with wet ink signatures and contain the proper solicitation number, bid opening date, and be from a corporate surety listed in Department of Treasury Circular 570. Individual sureties shall be determined acceptable to the CO (see RFO 28.203) and be accompanied by SF28 Affidavit of Individual Surety. Other forms of bid security may be acceptable as denoted in RFO 28.203-2. PERFORMANCE AND PAYMENT BONDS: Pursuant to 40 U.S.C Chapter 31 and in accordance with Contract Clause 52.228-15, and RFO 28.102-1(a), requires Performance Bond (SF25) and Payment Bond (SF25A) for any construction contract exceeding $150,000. Performance and Payment bonds are due no later than ten (10) calendar days after notification of award. Bonds must be provided with original wet ink signatures - no white-outs or other corrections are allowable. Copies and facsimiles of bonds shall not be accepted. MEDICAL CENTER ACCESS: Anyone participating in the site visit, or for any other reason that involves visiting the medical center related to this solicitation, must have a valid ID on their person and their vehicle must be properly registered and insured. Visitors are prohibited from possessing weapons while on a federal installation (See 18 U.S.C. 930 Possession of Firearms and Dangerous Weapons in Federal Facilities). Handheld cellphone usage or texting while driving is also prohibited. All VA Medical Centers and associated properties are Federal Property. PRIVACY TRAINING: All workers regardless of project length must take VA Privacy Training which will be coordinated after project award with the COR. E-VERIFY SYSTEM: Companies awarded a contract with the federal government shall enroll in E-Verify within 30 calendar days of the contract award date. They shall also begin using the E-Verify system to confirm that all their new hires and their employees directly working on federal contracts are authorized to legally work in the United States. E-Verify is an Internet-based system that allows an employer, using information reported on an employee's Form I-9, to determine the eligibility of that employee to work in the United States. There is no charge to employers to use E-Verify. (RFO 52.222-54). PRIME CONTRACTOR INFORMATION- SAFETY OR ENVIRONMENTAL VIOLATIONS AND EXPERIENCE MODIFICATION RATING INFORMATION: All Bidders/Offerors shall submit information pertaining to their past Safety and Environmental record (using the attached EMR information/data form). The information must contain a certification that the bidder/offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three (3) years. If such certification cannot be made, a Bidder/Offeror shall explain why and submit as much information as possible regarding the circumstances of its past safety and environmental record, including the number of EPA violations and/or the number of serious, repeat, and/or willful OSHA violations, along with a detailed description of those violations. All Bidders/Offerors shall submit information regarding their current EMR. This information shall be obtained from the Bidders/Offeror s insurance carrier and be furnished on the insurance carrier s letterhead. If a Bidder/Offeror s EMR is above 1.0, Bidder/Offeror must submit a written explanation of the EMR from its insurance carrier furnished on the insurance carrier s letterhead, describing the reasons for the elevated EMR and the anticipated date the EMR may be reduced to 1.0 or below. Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and Puerto Rico shall obtain their EMR rating from their state-run worker s compensation insurance rating bureau. If the NCCI cannot issue an EMR because the Bidder/Offeror lacks insurance history, Bidder/Offeror shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier s letterhead and include a letter from the NCCI indicating that it has assigned Bidder/Offeror a Unity Rating of 1.0. The above information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases, will be used to make an initial Determination of Responsibility. This requirement is applicable to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors. CONFORMANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEMS: The Contractor shall perform work under this contract consistent with the relevant policy and objectives identified in the agency, organizational, or facility Green Environmental Management System (GEMS) applicable for the contract. The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by the agency, organizational, or facility GEMS, and provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In the event an environmental nonconformance or noncompliance associated with the contracted services is identified, the contractor shall take corrective and/or preventative actions. In the case of noncompliance, the Contractor shall respond and take corrective action immediately. In the case of a nonconformance, the Contractor shall respond and take corrective action based on the time schedule established by the facility GEMS Coordinator. In addition, the Contractor shall ensure that their employees are aware of the roles and responsibilities identified by the environmental management system and how these requirements affect their work performed under this contract. All on-site contractor personnel shall complete yearly EPA sponsored environmental training specified for the type of work conducted on-site. Upon inclusion in the contract, the COR will verify that all contractor personnel have acquired EMS Awareness Training at their appropriate site or location. REFERENCES TO VA ENGINEER, RESIDENT ENGINEER, SENIOR RESIDENT ENGINEER, OR PROJECT MANAGER (PM): Any reference contained within contract specifications and/or drawings to the VA Engineer , Resident Engineer , Senior Resident Engineer , PM , or their abbreviations are to be replaced with COR . PAYMENT FOR MATERIALS STORED OFF-SITE: The COR and the contractor / PM (whoever will oversee submitting the invoice) shall meet and discuss the items listed on a draft copy of the invoice prior to submission to OB10. All items will be approved prior to submission. It is the CO s discretion to pay for any stored materials. This should be discussed prior to submission of the first invoice. Contract financing is not part of this contract. SCHEDULE OF MATERIAL SUBMITTALS: The submittals contemplated by RFO 52.236-5, Material and Workmanship, are listed on the Schedule of Material Submittals in the Specifications, if provided. The schedule is for reference only the selected contractor is responsible to provide all submittals required by the contract. REVIEW REQUIRED REGISTRATION WITH CONTRACTOR PERFORMANCE ASSESSMENT SYSTEM (CPARS): As prescribed in RFO Part 42.11, the Department of Veterans Affairs (VA) evaluates contractor past performance on all contracts that exceed $900,000 and shares those evaluations with other Federal Government contract specialists and procurement officials. The RFO requires that the contractor be provided an opportunity to comment on past performance evaluations prior to each report closing. To fulfill this requirement VA uses an online database, CPARS, which is maintained by the Naval Seal Logistics Center in Portsmouth, Virginia. CPARS is the system used to collect and retrieve performance assessment reports used in source selection determinations. CPARS also includes access to the Federal Awardee Performance and Integrity Information System (FAPIIS). FAPIIS is a web-enabled application accessed via CPARS for contractor responsibility determination information. Each contractor whose contract award is estimated to exceed $900,000 is required to register with CPARS database at the following web address: https://www.cpars.gov/cparsweb/home. Help in registering can be obtained by contacting Customer Support Desk at 207-438-1690. Registration should occur no later than 30 calendar days after contract award and must be kept current should there be any change to the contractor's registered representative. For contracts with a period of one (1) year or less, the CO will perform a single evaluation when the contract is complete. For contracts exceeding one (1) year, the CO will evaluate the contractor's performance annually. Interim reports will be filed each year until the last year of the contract, when the final report will be completed. The report shall be assigned in CPARS to the contractor's designated representative for comment. The contractor representative will have 30 calendar days to submit any comments and re-assign the report to the VA CO. Failure to have a current registration in the CPARS database, or to re-assign the report to the VA CO within those 30 calendar days, will result in the Government's evaluation being placed on file in the database with a statement that the contractor failed to respond. END OF SUBMISSION INFORMATION DOCUMENT EVALUATION FACTORS This section describes the evaluation process, proposal preparation, the significant factors and sub-factors and criteria to be used in the evaluation process. This procurement action is a Lowest Price Technically Acceptable (LPTA) source selection process in accordance with RFO 15.103-2. Proposals will be evaluated for acceptability but not ranked using the non-price factors/sub-factors. To be considered for award, an offeror must have an acceptable rating in every non-price factor/sub-factor under consideration. The Government intends to award a single contract to a qualified Service-Disabled Veteran Owned Small Business (SDVOSB) determined responsible in accordance with the Revolutionary Federal Acquisition Regulation (RFO) Overhaul, whose proposal conforms to all the requirements in this solicitation and is further determined to meet or exceed the standards of acceptability at the lowest offered price. The Government intends to evaluate proposals and award a contract without discussions with Offerors. Therefore, the Offeror s initial proposal should contain the Offeror s best terms from both a technical and cost standpoint. The evaluation of offers submitted in response to this Request for Quote (RFQ) solicitation will be conducted utilizing the LPTA selection process. Utilization of this source selection process may result in not all offers being evaluated. The CO upon receipt of offers, will determine eligibility and compliance with the solicitation requirements. The Vendor Information Pages (SBA DSBS registry) will be checked to ensure that any offeror submitting a proposal to perform the work is both listed and verified. All proposals received will also be checked for active registration in the System for Award Management (SAM). Thereafter, the CO will review all proposals to ensure that the minimum proposal submission requirements have been met. Once these requirements have been met, the CO will select and submit for review to the Technical Evaluation Board (TEB) the technical proposal of the lowest priced offeror for consideration. Initially, TEB will not receive any pricing information, only the technical portion of the offeror s proposal. The Government will evaluate the three (3) lowest priced proposals for technical acceptability. If two or more of the lowest priced proposals are found to be unacceptable, the next lowest priced proposals will be evaluated, and so on. Award will be made to the lowest technically acceptable evaluated price conditional upon completion of contractor responsibility determination and determination price to be fair and reasonable. No additional proposals will be evaluated once two or more are found to be technically acceptable. Therefore, all proposals may not be evaluated. Price Analysis will be IAW RFO 15.404-1. If price analysis cannot determine fair and reasonableness, the Government reserves the right to complete further cost analysis IAW RFO 15.404(a)(2). Offerors shall submit the information described below for Factors 1, 2, and 3 in the same order as they appear in this solicitation document. All information must be complete, accurate, and organized in the order presented. Failure to submit the required information may result in a rating of Unacceptable and elimination from further consideration. Award will be made on a Lowest Price Technically Acceptable (LPTA) basis. Proposals are to be submitted via email to CS, Lara Hampton lara.hampton@va.gov and CO Jeannette Morphew Jeannette.Morphew@va.gov . Offerors shall submit one (1) electronic copy of complete proposal (a. Technical & b. Price) to the address shown below as well as a complete proposal emailed to the email address shown below. Technical and Price sections of an Offeror s proposal will be evaluated independently. Offeror shall separately submit each section as a separate attachment. All pages containing text shall be consecutively numbered, type-written on 8-1/2x11 inch paper with margins of at least one (1) inch and created using a Times New Roman 12-point font. The submitted package should contain two (2) sections, separately: a.) Technical Proposal b.) Price Proposal. Each section must therefore be labeled with the following: Construction Company Name Physical Address of the Company Telephone Number Email address VA Project Number (Project 626-22-103) VA Project Name (Video Surveillance Security TVHS Nashville Campus) Solicitation number (36C24926R0065) The Technical Evaluation Board (TEB) shall evaluate the offeror s proposal against all non-price factors/sub-factors using ACCEPTABLE or UNACCEPTABLE ratings based upon the definition in the chart below. Technical Acceptable / Unacceptable Evaluation Ratings Rating Description ACCEPTABLE Based on the Offeror s proposal, the Information provided clearly meets the minimum standards of the solicitation. UNACCEPTABLE Based on the Offeror s proposal, the Information provided does not meet the minimum standards of the solicitation. All submissions must clearly identify which requirement each project or individual fulfills. Excessive or vague information may be disregarded. The Government will not seek clarifications for missing, incomplete, or unclear submissions. Offerors must meet all requirements of Factors 1 3 to be rated Technically Acceptable. The following evaluation factors and sub-factors will apply to this procurement: FACTOR 1 Relevant Construction Experience: NOTE: Failure to provide proof for any of the below Requirements 1-5 shall result in your proposal being deemed technically unacceptable and ineligible for award. The Government reserves the right to verify the information provided through available records or by contacting the listed contracting activity or project owner. Standard of proof: To substantiate the requirements for this factor, the Offeror shall submit documentation identifying the project, including the project title, location, description of the work performed, contract number (if applicable), period of performance, and contract value. Documentation may include but not limited to copy of contract award, task order, CPARS report, drawings, specifications, and/or statement of work or other verifiable project documentation for the government to determine the acceptable or unacceptable basis. Please highlight applicable area. Requirement 1: The Offeror shall demonstrate successful completion of at least one (1) Information Technology (IT) project within the past ten (10) years at a healthcare facility that included backbone installation or comparable infrastructure integration work. Acceptable ___ Unacceptable ___ Requirement 2: The Offeror shall demonstrate successful completion of at least one (1) project with a total contract value of $500,000 or more. Acceptable ___ Unacceptable ___ Requirement 3: The Offeror shall provide evidence of at least one (1) successfully completed project performed at a Government facility that required coordination with the Office of Information and Technology (OIT) and included infrastructure installation spanning multiple buildings. Acceptable ___ Unacceptable ___ Requirement 4: The Offeror shall provide a memorandum or other formal documentation demonstrating coordinated effort, collaborative communication, and authorization with the system service provider, Johnson Controls. Acceptable ___ Unacceptable ___ Requirement 5: The Offeror shall provide a letter or other verifiable proof demonstrating that they are included on the authorized distributor list for Avigilon products. Acceptable ___ Unacceptable ___ FACTOR 2 Key Personnel Experience: The offeror must provide documentation showing that the Project Manager and/or Site Superintendent assigned to this project meet the requirements below. NOTE: Failure to provide proof for any of the below Requirements 1-3 shall result in your proposal being deemed technically unacceptable and ineligible for award. The Government reserves the right to verify the information provided through available records or by contacting the listed contracting activity or project owner. Standard of proof: To substantiate this requirement, the Offeror shall submit documentation such as a resume demonstrating the individual s role and responsibilities on the identified project to include key details such as project name, facility, location, and dollar amount. Please highlight applicable area. Requirement 1: The Offeror shall demonstrate that at least one proposed key personnel member has experience managing or supervising a VA infrastructure project. Acceptable ___ Unacceptable ___ Requirement 2: The Offeror shall demonstrate that at least one proposed key personnel member has experience managing or supervising an infrastructure project with a total contract value of $1,000,000 or more. Acceptable ___ Unacceptable ___ Requirement 3: The Offeror shall demonstrate that at least one proposed key personnel member has experience managing or supervising a project requiring coordination with VA Office of Information and Technology (OIT) to modify equipment. Acceptable ___ Unacceptable ___ FACTOR 3 - Past Performance: The government reserves the right to use CPARS and/or other techniques to validate contractor past performance and to assist with contractor responsibility determination. NOTE: Failure to provide proof for any of the below Requirements 1-2 shall result in your proposal being deemed technically unacceptable and ineligible for award. The Government reserves the right to verify the information provided through available records or by contacting the listed contracting activity or project owner. Standard of proof: Acceptable evidence of past performance must verify through submitted PPQs or CPARS that the offeror received an overall rating of Satisfactory or higher on all graded areas on at least two (2) relevant contracts. Please highlight applicable area. Requirement 1: PPQ s and/or CPARS received with satisfactory or better rating in all evaluated areas. Acceptable ___ Unacceptable ___ Requirement 2: PPQ s and/or CPARS received with satisfactory or better rating in all evaluated areas. Acceptable ___ Unacceptable ___ NOTE: The past performance evaluation results is an assessment of the Offeror s probability of meeting the minimum past performance solicitation requirements. This assessment is based on the Offeror s record of relevant and recent past performance information that pertain to the products and/or services outlined in the solicitation requirements. The government may also obtain past performance information through the Past Performance Information Retrieval System (PPIRS) other sources known to the Government. RELEVANT: The Government will perform an independent determination of data relevancy, provided or obtained. The main assessment of relevancy shall focus on capability. Capability assesses whether the work being performed in the reference is like the work in the requirement RECENT: Recent past performance shall be defined as successful performance under contracts similar in scope to the subject requirement completed within the last five (3) years through proposal due date END OF EVALUATION FACTORS DOCUMENT ATTACHMENTS Atch 1 WD DBA-TN20250178 BUILDING MOD-3 06-05-2025 -NASH Atch 2 WD SCA 2015-4647 REV31 _05.13.2026 Rutherford-Davidson Atch 3 Past Performance Questionnaire (NASH) Atch 4 UEI _ TAX ID Atch 5 RFI Form Atch 6 Calc. of Self Performed Work Atch 7 Contractor EMR Certification Form Atch 8 General Conditions Breakout Atch 9 Price Breakout Schedule Atch 10 Specs 626-22-103 BD Video Surveillance NASH 1 Atch 11 Drawings 626-22-103 BD Video Surveillance NASH 1 Atch 12 SF1442_36C24926R0065_2 Atch 13 JA Avigilon Atch 14 JA JCI ~END OF COMBINED SOLICITATION~

Full description on SAM.gov

Award Overview

Possible prior contract

Inferred, not confirmed

Inferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.

Contract end date

Dec 5, 2024

NAICS

238210

Agency

Department of Veterans Affairs

Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.

Contacts

Contracting Officer

Primary Contact

Lara Hampton
Contracting Specialist

Secondary Contact

Documents

Files (25)

  • S06 AMEND_7 36C24926R0065 0007-NASH Campus.pdf

    83 KBAdded in Combined Synopsis/Solicitation version 14Posted
    Download
  • AMEND-6_36C24926R0065 0006 VIDEO NASH.pdf

    90 KBAdded in Combined Synopsis/Solicitation version 14Posted
    Download
  • S02 36C24926R0065 0005 Video -NASH.pdf

    255 KBAdded in Combined Synopsis/Solicitation version 11Posted
    Download
  • S02 AMEND_4 36C24926R0065 0004.pdf

    185 KBAdded in Combined Synopsis/Solicitation version 10Posted
    Download
  • S02 36C24926R0065 0003_1 Protest.pdf

    84 KBAdded in Combined Synopsis/Solicitation version 9Posted
    Download
  • Atch 1 UPDATED TR ROOMS FROM EHRM.pdf

    5.5 MBAdded in Combined Synopsis/Solicitation version 8Posted
    Download
  • S02 36C24926R0065 0002 VIDEO-Nash.pdf

    274 KBAdded in Combined Synopsis/Solicitation version 7Posted
    Download
  • Atch 1 Site Visit Video Surveillance Nashville.pdf

    209 KBAdded in Combined Synopsis/Solicitation version 6Posted
    Download
  • S02 AMEND_1 36C24926R0065 0001 VIDEO NASH.pdf

    90 KBAdded in Combined Synopsis/Solicitation version 6Posted
    Download
  • S02 36C24926R0065_1 VIDEO 626-22-103 NASH.pdf

    199 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • Atch 16 SF1442 36C24926R0065_2 NASH.pdf

    717 KBAdded in Combined Synopsis/Solicitation version 2Posted
    Download
  • Atch 13 Fire-Smoke Barrier Permit.doc

    38 KBAdded in Combined Synopsis/Solicitation version 2Posted
    Download
  • Atch 12 HotWorkPermit.pdf

    124 KBAdded in Combined Synopsis/Solicitation version 2Posted
    Download
  • Atch 11 Drawings 626-22-103 BD Video Surveillance NASH - 1.pdf

    20 MBAdded in Combined Synopsis/Solicitation version 2Posted
    Download
  • Atch 10 Specs 626-22-103 BD Video Surveillance NASH - 1.pdf

    3.3 MBAdded in Combined Synopsis/Solicitation version 2Posted
    Download
  • Atch 9 Price Breakout Schedule.xlsx

    29 KBAdded in Combined Synopsis/Solicitation version 2Posted
    Download
  • Atch 8 General Conditions Breakout.xlsx

    13 KBAdded in Combined Synopsis/Solicitation version 2Posted
    Download
  • Atch 7 Contractor EMR Certification Form.docx

    16 KBAdded in Combined Synopsis/Solicitation version 2Posted
    Download
  • Atch 6 Calc. of Self Performed Work.xlsx

    14 KBAdded in Combined Synopsis/Solicitation version 2Posted
    Download
  • Atch 5 RFI Form.docx

    17 KBAdded in Combined Synopsis/Solicitation version 2Posted
    Download
  • Atch 4 UEI _ TAX ID.docx

    13 KBAdded in Combined Synopsis/Solicitation version 2Posted
    Download
  • Atch 3 Past Performance Questionnaire NASH.docx

    29 KBAdded in Combined Synopsis/Solicitation version 2Posted
    Download
  • Atch 2 WD SCA 2015-4647 REV31 _05.13.2026 Rutherford-Davidson.docx

    40 KBAdded in Combined Synopsis/Solicitation version 2Posted
    Download
  • Atch 1 WD DBA-TN20250178 BUILDING MOD-3 06-05-2025 -NASH.docx

    28 KBAdded in Combined Synopsis/Solicitation version 2Posted
    Download
  • 36C24926R0065.docx

    43 KBAdded in Sources Sought version 4Posted
    Download

Lifecycle

  1. 4
    Version 4Sources SoughtArchived

    Z1DA--Construction Project 626-22-103_Video Surveillance Security TN Valley Healthcare System Nashville Campus

    Notice d822ad826cd745fa9a3cb2f69f841ee8 on SAM.gov

  2. 2
    Version 2Combined Synopsis/Solicitation

    Type changed from Sources Sought to Combined Synopsis/Solicitation

    Z1DA--Project 626-22-103_Video Surveillance Security TVHS VAMC - Nashville Campus

    Notice d671df4eede0475cbaaf6bc5a5c2fc3d on SAM.gov

  3. 3
    Version 3Combined Synopsis/Solicitation

    Z1DA--Project 626-22-103_Video Surveillance Security TVHS VAMC - Nashville Campus

    Notice a0520f7c994a4636b04617931a30a72c on SAM.gov

  4. 6
    Version 6Combined Synopsis/Solicitation

    Z1DA--Project 626-22-103_Video Surveillance Security TVHS VAMC - Nashville Campus

    Notice 071d085a493e4319be9b5e2e0d9fbb32 on SAM.gov

  5. 7
    Version 7Combined Synopsis/Solicitation

    Z1DA--Project 626-22-103_Video Surveillance Security TVHS VAMC - Nashville Campus

    Notice 52c824cb6ce5498085071ca87f2abe8c on SAM.gov

  6. 8
    Version 8Combined Synopsis/Solicitation

    Z1DA--Project 626-22-103_Video Surveillance Security TVHS VAMC - Nashville Campus

    Notice bc08a371e35547b08c48fb9f558219a2 on SAM.gov

  7. 9
    Version 9Combined Synopsis/Solicitation

    Z1DA--Project 626-22-103_Video Surveillance Security TVHS VAMC - Nashville Campus

    Notice f41014973e7f483b8139dc82b9045cea on SAM.gov

  8. 10
    Version 10Combined Synopsis/Solicitation

    Z1DA--Project 626-22-103_Video Surveillance Security TVHS VAMC - Nashville Campus

    Notice afa92fbacef541c7913120319377d1ab on SAM.gov

  9. 11
    Version 11Combined Synopsis/Solicitation

    Z1DA--Project 626-22-103_Video Surveillance Security TVHS VAMC - Nashville Campus

    Notice af77d61e5dd24b4fb898a2cb545353a5 on SAM.gov

  10. 12
    Version 12Combined Synopsis/Solicitation

    Z1DA--Project 626-22-103_Video Surveillance Security TVHS VAMC - Nashville Campus

    Notice 8eea7c76ab5f485f952c5b4fa4372886 on SAM.gov

  11. 13
    Version 13Combined Synopsis/Solicitation

    Z1DA--Project 626-22-103_Video Surveillance Security TVHS VAMC - Nashville Campus

    Notice da5e2de026f645128d1e5ce34856419c on SAM.gov

  12. 14
    Version 14Combined Synopsis/SolicitationCurrent

    Z1DA--Project 626-22-103_Video Surveillance Security TVHS VAMC - Nashville Campus

    Notice d493a241125b4daaaf6e5ecdc8a88183 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This amendment is to address typographical errors regarding offer due date and the site visit information on RFQ 36C24927Q0038 page 2, replaced entirely below: Offer due date: 11/30/2026 @11:00am CT Site visits are scheduled on Monday 11/16/2026 at 08:30am ET for the Lexington Sousley Campus 2250 Leestown Road, Lexington, KY 40511, Bldg. 20 and Tuesday 11/17/2026 at 08:30 AM ET for the Lexington Troy Bowling Campus, 1101 Veterans Dr., Lexington, KY 40502 in the main lobby. No other changes are made at this time.
-Combined Synopsis11/30/2026
(i) This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with RFO Part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. This acquisition is a 100% Total Set- Aside for Service Disable Veteran Owned Small Business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. Solicitation number 36C24927Q0038 is issued as a request for quotation (RFQ) for LEX Triennial Energy Study and ARC Flash Testing Service. Site visits are scheduled on Monday 11/16/2026 at 08:00am ET for the Lexington Sousley Campus @ 08:30 AM 2250 Leestown Road, Lexington, KY 4051, Bldg. 20 and Tuesday 11/17/2026 @ 08:30 AM ET for the Lexington Troy Bowling Campus, 1101 Veterans Dr., Lexington, KY 40502 in the main lobby. (Space Left Blank Intentionally) (ii) PRICE/COST SCHEDULE ITEM INFORMATION ITEM NUMBER DESCRIPTION OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 1001 1.00 JB __________________ __________________ Electrical Power Distribution System and Arc Flash, Coordination, and Short-Circuit studies of all its components at the VA Health Care System two Divisions: Bowling Campus, 1101 Veterans Drive, Lexington, KY Contract Period POP Begin: 12-01-2026 POP End: 03-01-2027 PRINCIPAL NAICS CODE: 238210 - Electrical Contractors and Other Wiring Installation Contractors PRODUCT/SERVICE CODE: H361 - Inspection - Electric Wire and Power Distribution Equipment LOCAL STOCK NUMBER: N/A 1002 1.00 JB __________________ __________________ Emergency repair and maintenance work on a continuous (including overtime) basis if circuits cannot be energized after inspection and maintenance have been accomplished in accordance with the contract. Contract Period POP Begin: 12-01-2026 POP End: 03-01-2027 PRINCIPAL NAICS CODE: 238210 - Electrical Contractors and Other Wiring Installation Contractors PRODUCT/SERVICE CODE: H361 - Inspection - Electric Wire and Power Distribution Equipment LOCAL STOCK NUMBER: N/A GRAND TOTAL __________________ (iii) STATEMENT OF WORK Triennial Energy Study and Arc Flash Testing Department of Veterans Affairs Lexington, KY Bowling & Sousley Divisions, VA Health Care System 1. Introduction: This Statement of Work (SOW) describes the requirements for the maintenance, inspection, testing, and/or calibration of the Electrical Power Distribution System and Arc Flash, Coordination, and Short-Circuit studies on all its components at the Veterans Administration (VA) Health Care System two Divisions: Bowling Campus, 1101 Veterans Drive, Lexington, KY 40502, and Sousley Campus, 2250 Leestown Road, Lexington, KY 40511. These work items are referenced as Maintenance and Testing in this document, hereafter. This SOW describes the requirements for the Qualified Electrical Contract Professionals known as Contractors in this document, hereafter. Contractors who are contracted by VA Medical Center to perform maintenance and testing of the Electrical Power Distribution System, and all its components shall meet all requirements stated in Section 2 of this SOW. This SOW describes the requirements to establish maintenance and testing reports. 2. Qualifications of Contractors: Contractors shall be experienced Electrical Contractors, having properly trained and licensed permanent staff required to perform the proposed work. Electrical Contracting (i.e. the construction, repair, testing and maintenance of industrial and commercial electrical distribution systems) shall be the primary interest/specialty of the Contractor s business. Contractors shall be certified by the International Electrical Testing Association (NETA) or equivalent certifying organization as Certified Technicians with each having completed the Occupational Safety & Health Administration (OSHA) approved 10-hour construction safety training. Superintendent or Project Manager must have OSHA 30-hour construction training. All Contractors employees and/or Sub-Contractors must attend the Veterans Administration Medical Center (VAMC) Contractor Orientation class. Contractors shall have technical training and demonstrable track records of working experience in maintenance, inspection, and testing of the Electrical Power Distribution Systems and related components in healthcare, industrial, educational, and commercial facilities for a minimum of five (5) continuous years. Electrical components on which the Contractors have experience shall include, but not be limited to, switchboards & switchgear (low and medium voltage); low voltage controls; emergency and standby generators; automatic transfer switches, wiring, transformers, meters, grounding, and other electrical appurtenances. Contractors shall have safety trainings either on-the-job or class-room type - in electrical safety outlined in the OSHA Standard 29 Code of Federal Regulations (CFR) 1910 Subpart S Electrical, and the National Fire Protection Association (NFPA) 70E Standard for Electrical Safety in the Workplace. Training certification shall be provided indicating each technician is a Qualified Person as defined by NFPA 70E. Training certifications shall be submitted to the VA Contracting Officer prior to work. If no training certifications are available, the contractor Employer shall certify that he/she has met this requirement in writing and submit it to the VA Contracting Officer prior to work. Contractors shall have ready access to the latest versions of the following references: NFPA 70, National Electrical Code. NFPA 70B, Recommended Practice for Electrical Equipment Maintenance. NFPA 70E, Standard for Electrical Safety for the Workplace. NFPA 110, Standard for Emergency and Standby Power System. OSHA Standard 29 CFR 1910, Subparts I & S. International Electrical Testing Association, Inc. (NETA) Maintenance and Testing Specifications. Operating /Maintenance manuals and specifications of the electrical equipment to be maintained and tested. These documents may be obtained from the Veterans Healthcare Administration( VHA) Medical Center, or the equipment manufacturers. VHA Directive 1028, Electrical Power Distribution System Contractors shall have and provide all necessary tools, equipment, and Personal Protective Equipment (PPE) to perform the work safely, effectively, and timely. Tools, equipment, and PPE shall comply with the requirements of OSHA Standard 29 CFR 1910, Subpart I, and NFPA 70E. Prior to initiating work, Contractor shall provide documentation that all instruments, test equipment, tools and PPE have current calibration. Dated calibration labels shall be visible on all instruments, test equipment, tools and PPE as appropriate. If a Scheduled/Approved outage would affect hospital operations, VA shall be able to reschedule with no contract modifications. 3. Summary of Work: The Contractor shall provide a proposed schedule with their bid proposal. The schedule shall be in the form of a progress chart of suitable scale to indicate the work scheduled for completion by any given date during the work period. The proposed schedule shall be reviewed by the VAMC Engineering Service; any requirements for adjusting the schedule (e.g. to minimize disruption to the VAMC) shall be incorporated by the Contractor. Contractors shall report deficiencies that are deemed critical or catastrophic immediately to the Contracting Officer and Chief of Engineering Service for immediate actions. Work items, definitions, and references shall comply with the latest edition of the NETA Maintenance Testing Specifications (MTS) and with the VHA Directive, Electrical Power Distribution System. Below is a list of electrical equipment that shall be maintained and tested: Switchgear and Switchboard Assemblies. Transformers, Dry Type, Air-Cooled, Low-voltage, Small. Transformers, Dry Type, Air-Cooled, Low-voltage, Large. Transformers, Liquid-Filled. Metal Enclosed Busways. Switches, Air, Low-Voltage. Switches, Air, Medium-Voltage, Metal-Enclosed. Circuit Breakers, Air, Insulated-Case/ Molded-Case. Circuit Breakers, Air, Low-Voltage Power. Circuit Breakers, Air, Medium-Voltage. Protective Relays, Mechanical, and Solid State. Protective Relays Microprocessor Based. Grounding Systems. Ground-fault Protection Systems. Motor Control, Motor Starters, Low-Voltage. Motor Control, Motor Starter, Medium-Voltage. Emergency Systems, Engine Generators. Emergency Systems, Automatic Transfer Switches. Distribution Panels Perform Arc-Flash Study/Labeling on all equipment requiring labels. Provide laminated, adhesive-backed flash and shock hazard/PPE signs for each system location will be provided and installed. Based on the results of the incident energy study, the supplier shall produce and install a warning label (orange 40 cal/cm2) for each piece of equipment in accordance with American National Standards Institute (ANSI) Z535.4-2002. The label must be readable in both indoor and outdoor environments for at least 3 years and contain the following information: Arc hazard boundary (inches) Working distance (inches) Arc flash incident energy at the working distance (calories/ cm2) PPE category and description including the glove rating Voltage rating of the equipment Limited approach distance (inches) Restricted approach distance (inches) Equipment/bus name Date prepared Supplier name and address Attachments. Government Furnished. Inventory of Electrical Power Distribution System equipment to be maintained, inspected, and tested under this Scope of Work. One-line and other informational drawings of the Electrical Power Distribution System. These drawings are not certified as-built drawings. Electrical Power System study information relevant to the scope of this effort, such as coordination study data, short-circuit analysis, arc-flash hazard analysis and available protective device setting information. 4-Hour Power Outage Test The Contractor shall be present for and will participate in the VAMC 4-hour test of the Essential Electrical System (EES). This test shall fulfill the requirements of VHA Directive, Electrical Power Distribution System, NFPA 110 (e.g. Para. 8.4.9.) and The Joint Commission. This test will include opening of all utility service connections serving the VAMC for a minimum of 4-hours. During the test period, verify operation of all EES components including the transfer to emergency power and return to normal service. The Contractor shall include in their bid proposal all costs associated with the services of the local utility company for the duration of the test. The estimated duration of the Contractor s involvement is between 8 12 hours. The Contractor shall assist the VAMC staff with troubleshooting and correcting malfunctioning electrical equipment discovered during the test. Contractor shall make any required adjustments and/or re-calibrations to all equipment which has been otherwise maintained, inspected, and tested under this Scope of Work. Deliverables: A. A complete written report of the work performed shall be provided to the VA within 7 days of completion. Information shown in the report shall be as following: Company s name, addresses, telephone, & FAX numbers. Name and signature of contractors who perform the maintenance and testing. VA Work Contract Number, name and number of VA Contracting Officer. Date and Time of work. Copies of contractors valid licenses, professional and training certificates. Descriptions and model number of specialized tools and equipment used, such as torque wrench or infra-red scanning camera. Location, Type, Name, and nameplate information of electrical equipment to be maintained and tested. Descriptions of work items. Test data. Reference materials such as equipment manufacturer s specifications, coordination study, etc. Remarks on conditions of electrical equipment. List all deficiencies, if any. Recommended corrective actions, if any. Submit four (4) hard copies of the complete written report to VA Contracting Officer within seven (7) calendar days of visit. C. Submit four (4) hard copies of the complete written report, and one (1) CD-ROM or DVD of the electronic version of the report in Microsoft Word format to the Chief of Engineering Service within seven (7) calendar days of visit. All reference materials shall be included in the electronic version of the report, either through scanning or other means of electronic text import methods. D. Drawings (Full-size for site, primary one-line diagram and secondary one-line diagrams) Use the latest version of AutoCAD (compatible with the local VAMCs version) and provide the viewer on each CD. For the Final Study Submittal, the VAMC shall receive live CADD drawing files which can be manipulated and updated. 5. Description / Specifications: The Contractor shall provide all management, supervision, labor, materials, supplies, repair parts, tools, instruments, and equipment, and travel expenses to provide the work and services specified in this contract. The Contractor shall plan, schedule, coordinate, and ensure effective and economical completion of all work and services specified in this contract. Most of the work will be accomplished at night and after the normal working hours. Normal working hours are 7:00 am to 4:30 pm ET Monday thru Friday. It may be possible to schedule some non-disruptive work during normal working hours. This Preventive Maintenance Inspection (PMI) is to be scheduled with the Contracting Officer Representative (COR). The PMI and any requested power outages must be scheduled a minimum of 2 weeks in advance. The specifications are a statement of the minimum level of work and services that are to be provided in certain areas under this contract. They are not intended to be, nor shall they be construed as, limiting specifications or requirements. At a minimum, the Contractor will be required to take all steps and measures, which would be taken by a prudent building owner to maximize the life expectancy of the property. All equipment at the facility shall be maintained at an acceptable level, throughout the contract performance period unless and until removed from the scope of work. An "acceptable level" of maintenance as defined as the level of maintenance which will preserve the equipment in unimpaired operating condition: i.e. above the point where deterioration will begin, thereby diminishing the normal life expectancy of the equipment. The Contractor shall maintain areas and storerooms in a clean and orderly manner. When work is performed in these areas, the Contractor's personnel shall clean up all debris and leave the area in a presentable condition. The Contractor must obtain the approval of the Electronics Shop Supervisor before storing anything in machinery space. Operating supplies such is lubricants, rags, and cleaners, etc. shall be properly secured in containers approved by the Electronics Shop Supervisor and stored in accordance with fire and safety requirements outlined in NFPA, Building Fire Safety Criteria. The Contractor shall coordinate all outages with Engineering Services. Prior to start of work, the Contractor must submit a complete schedule of all equipment being shut down, out/on time and affected departments/services. Contractor will give (2) two weeks to provide a schedule for both divisions. It shall be the responsibility of the Contractor to obtain permission from the local utility for main feeder outages. Any fees for such power outages or required permits shall be the Contractor's responsibility. 6. Scheduled Preventive Maintenance Requirements 1. All power outages for maintenance shall be scheduled during off-hours or weekends. Some work may be able to be accomplished during normal working hours and this work will be approved by the COR on a case-by-case basis. All maintenance shall be completed within 90 calendar days of contract start date. The Contractor shall submit a complete detailed maintenance schedule for approval to the Contracting Officer Representative (COR). The following specific criteria will be adhered to in addition to the above-mentioned General Scheduling requirements: a. All preventive maintenance scheduled for each period must be completed during that period. Requests by the Contractor for deviations from the approved schedule must be submitted with appropriate justification to the Electronics Shop Supervisor for approval. b. The Contractor shall coordinate the work with the COR, Facilities Management and shall immediately report the quantity and urgency for repair of any discrepancies found during the inspection. c. VAMC electricians will de-energize and re-energize circuits in accordance with the approved schedules. The Contractor will be responsible for establishing all required Lockout/Tag out (LO/TO) Procedures as required by OSHA, as well as verifying that systems are energized and de-energized. One (1) copy of the LO/TO procedures will be given to the COR. d. In accordance with the VHA Directive 1028, written procedures are established to prepare the medical center for a planned electrical outage. The procedures must consider the worst case of risk to patients, staff, visitors, and VHA property. When a planned electrical outage cannot be accomplished, the following requirements are mandatory for working on energized circuit: 1. Full and proper protective equipment (PPE) is available and worn by the qualified electricians. 2. Qualified electricians are provided with flame-retardant clothing for work at the proximity of energized electrical equipment. 3. Before initiating work, a specific work plan is developed, and a peer review of the plan documented. e. The work plan must include procedures to be used on and near the energized electrical equipment, barriers to be installed, safety equipment to be provided, and exit paths to be accessed. f. An Energized Circuit Work Permit must be obtained from the Chief of Engineering office. g. Contractor must submit a detailed list of all chemicals, planned to be used for this PMI, for approval. h. All workers (technicians and helpers) must have certification/documentation as evidence of their degree of Training and skill on the original equipment manufacturer before being allowed on work site. Worker s certification/documentation must be submitted at the time of offer. i. The VA will neither furnish personnel to assist the Contractor in accomplishing his work nor furnish tools or equipment for the inspections. j. The Contractor must review all high-pot testing procedures prior to performance, with the COR. k. The Contractor may be requested to perform emergency repair work on a continuous (including overtime) basis if circuits cannot be energized after inspection and maintenance have been accomplished in accordance with the contract. The VAMC via change order will arrange additional payment lot subsequent charges, separate purchase order, or credit card. 7. Procedures: At a minimum, the Contractor shall perform all manufacturers recommended testing and preventive maintenance on all listed equipment. Grounding and Connections: In accordance with VA Directive 1028, the contractor will test ground resistance for the entire facility grounding system to include but not limited to fall-of potential, induced frequency and clamp on testing. Fall of potential method is requested where soil is available to drive testing rods. Any measurements reading in excess of 25 ohms shall be immediately discussed with the COR. Where lightning protection systems are provided, the system must be certified in accordance with Underwriters Laboratories (UL) 96A standard. The Contractor shall check all grounding systems in accordance with National Electrical Code (NEC) and ANSI. The connections to buses, transformers, and contacts etc., the Contractor shall check for tightness and torque per manufacturers recommendations. Power Generators: The Contractor shall preform an oil a coolant sample test of the three existing generators. Contractor will provide a report to the COR. Low/Medium Voltage Switchgear: Breakers Clean: Blow off with clean dry compressed air, remove old lubrication. Inspect: Visually inspect for signs of wear, loose or missing hardware, burned/eroded/misaligned contacts, broken, chipped, burned arc-chutes. Lubricate: Oil/grease breaker mechanism at all pivot points, bearings, slides, etc. Adjust mechanism and confirm proper operation of both positive and negative interlocks. High-Current Test and Calibrate to manufacturer's time current characteristic curves. Operate breaker to insure correct operation. Insulation Resistance and Conductance tests. Perform Thermal Imaging of all bolted contacts, bolted or plug-in connections, and all other components subject to heating under load. Furnish typed final and draft test reports. Breaker Cubicle 1. Clean and visually inspect. 2. Lubricate as necessary. 3. Check breaker adjustment-make minor adjustments, if required. 4. Check contacts. 5. Check all bolted connections for high resistance and proper tightness. 6. Record number of operations. 7. Insulation Resistance test (2500 volts). 8. Check cubicle heater. 9. Inspect control wiring and controls. 10. Inspect interlocks and safety shutters. 11. Lubricate breaker-elevating mechanism. 12. Operate breaker using test coupling and test block. Circuit Protective Relays 1. Mechanical components will be checked for dirt particles or obstructions that would hamper relay operation. 3. Instantaneous and seal-in units will be checked for proper alignment. 4. Relay internal wiring connections will be checked for proper tightness or other discrepancies. 5. Relay contacts will be inspected for excessive pitting, burning or discrepancies. 6. The relay contacts will be checked for proper circuit continuity. 7. Minimum pick-up or operating point of each relay will be checked and adjusted as required. 8. Each relay will be checked and adjusted to correspond to the manufacturer's operating time/current curves at two and four times the relay current setting. 9. Seal-in and instantaneous units will be tested for proper electrical operation and calibration. Pad mounted Oil and Dry type Transformers 1. Visually inspect transformers for damaged insulators, potheads, damaged bushings or indications of overheating of cable connections. 2. For oil transformers, inspect transformer pressure relief devices; tap changers, liquid level indicators and cooling tubes for discrepancies. Refill insulating oil to proper level. 3. For oil transformers, inspect primary bushings, secondary bushings, cooling tubes, and tap changers for evidence of oil leaks. 4. For oil transformers, remove insulating liquid sample from each transformer and tap changer compartment and test for: Screen Test: Dielectric strength Water content (ppm) Visual Sediment Color Acidity Specific Gravity Comprehensive Test: Refractive index Viscosity Interfacial tension Other Testing: Gas-in-oil analysis 5. Clean all bushing and insulator surfaces. 6. Verify proper operation of auxiliary devices such as; fans, pressure relief devices, and tap changer. 7. Perform insulation resistance tests, winding to winding and winding to ground. 8. Perform transformer turns ratio test on operating tap. 9. Perform power factor test on all high-low voltage windings and bushings. 10. Verify transformer pressure, Nitrogen/dry air will to be added if required. 11. Record and reset transformer oil and winding temperature gauges. 12. Inspect all transformers for sign of overheating with thermal imaging detection equipment, and inspect for any damages to the housing, connection points, or insulation. 13. Test and replace cooling liquid in liquid cooled transformers and indicate if the liquid no longer meets manufacturer s specification. The liquid must be re-filled to meet the manufacturer s specification. 14. Inspect all dry type transformers for overheating with an infra-red thermal detecting equipment. 15. Check and test all ground connections. 16. Check all bolted electrical connections for high resistance and proper tightness. Main Feeder Units 1. Clean cubical. 2. Check connections for tightness. 3. Check and clean contacts. 4. Check control wiring. 5. Lubricate per manufacturer's recommendation. Transfer Switches All ASCOTM brand transfer switches must be tested and maintained by ASCOTM technicians. 1. Visual and Mechanical Inspection A. Inspect physical and mechanical condition. B. Lubrication Verify appropriate contact lubricant on moving current-carrying parts. Verify appropriate lubrication on moving and sliding surfaces. C. Verify that manual transfer warnings are attached and visible. D. Verify tightness of all control connections. E. Inspect all bolted electrical connections for high resistance using one of the following methods: Use of low-resistance ohmmeter. Verify tightness of accessible bolted electrical connections by calibrated torque-wrench method in accordance with manufacturer's published data. Thermal Imaging inspection Perform manual transfer operation. Verify positive mechanical interlocking between normal and alternate source. 2. Electrical Tests A. Perform a contact-resistance test. B. Perform resistance measurements through all bolted connections with a low resistance ohmmeter. C. Perform insulation-resistance tests, phase to phase and phase-to-ground, with switch in both source positions. D. Verify settings and operation of control devices. E. Calibrate and set all relays and timers in accordance with manufacturer's recommendations. 3. Perform Automatic Transfer Tests: A. Simulate loss of normal power. B. Return to normal power. C. Simulate loss of emergency power. D. Simulate all forms of single-phase conditions. 1. Verify correct operation and timing of the following functions: a. Normal source voltage-sensing relays. b. Engine start sequence. c. Time delay upon transfer. d. Alternate source voltage-sensing relays. e. Automatic transfer operation. f. Interlocks and limit switch function. g. Time delay and retransfer upon normal power restoration. h. Engine cool down and shutdown feature. Infra-Red Scanning: Infra-Red scan all bus plugs, panelboards, motor control centers, and transformers in the Main, Tower and Chiller building s electrical closets and distribution rooms. This work item must be done while the Electrical Power Distribution System is energized. Appropriate safety precautions must be taken before, during and after scanning the system: Use an infra-red scanning camera to detect hot spots in the Electrical Power Distribution System. Objective of this work is to detect any loose, broken, or corroded connections in the system. Problem connections shall be replaced with new connectors, and/or tightened with torque wrench to meet the equipment manufacturers specifications. Arc Flash Study Description / Specifications The contractor shall complete a fault current study and associated flash/shock hazard analysis in accordance with NFPA 70E and Institute of Electrical and Electronics Engineers (IEEE) 1584 to determine the level of electrocution hazards for qualified electricians working on live electrical circuits in the following buildings: Bowling Division: Chiller Building, Main Building, & Tower Building. Sousley Division: Chiller Plant and all other buildings on campus. The goals of this project are to provide flash/shock hazard data (including fault current, flash protection boundary, incident energy and recommended PPE), outline safe work practices for qualified employees, install appropriate flash/shock hazard/PPE signs for VAMC Lexington s high and low voltage equipment to comply with OSHA standards for live work on high and low voltage systems. Acquire the following data for high and low voltage electrical systems. Note that actual data shall be field collected/verified. Best estimates or guesses are NOT acceptable: Utility System - Transformer kVA, Impedance and primary/secondary voltage; Utility Company s anticipated maximum fault current; Type of over-current devices protecting the transformer, if available. Electrical system (wire size, type of wire [e.g. Copper/Aluminum/Copper-Clad Aluminum], number of wires per phase, conduit type [e.g. metallic/non-metallic], length of each run, and over-current device information [Fuses - mfg., cat number, size and class. Circuit breakers -mfg., cat number, size, adjustment settings. System transformers (30kVA and above) - (kVA rating, impedance, primary and secondary voltage. Additionally, the HP, amps and locked rotor current for motors over 20HP may be required). Engineering calculations for fault current and flash/shock hazard data for the system location. 4. Project outputs: The final written report shall include a general outline of the covered electrical systems and components flash/shock hazard data (including fault current), flash protection boundaries, incident energy, the recommended PPE and warning signs for each system location, and recommendations for the reduction of arc hazards, where necessary. Information dealing with any immediate and potentially life-threatening electrical system hazards (covering only the evaluated components) shall be presented in a stand-alone section of the report. Software programs used for report documentation or item tracking will be those typically included in Microsoft Office (such as Word and Excel) AutoCAD, or Adobe. Three hard copies of the completed report are required, along with one electronic copy on CD or DVD. The VA internal trusted network will not be utilized for this work. The Authorization requirements do not apply, and a Security Accreditation Package is not required. Laminated, adhesive-backed flash and shock hazard/PPE signs for each system location will be provided and installed by the contractor. Based on the results of the incident energy study, the contractor shall produce and install a warning label (orange 40 cal/cm2) for each piece of equipment in accordance with ANSI Z535.4-2002. The label must be readable in both indoor and outdoor environments for at least 3 years and contain the following information: Arc hazard boundary (inches) Working distance (inches) Arc flash incident energy at the working distance (calories/ cm2) PPE category and description including the glove rating Voltage rating of the equipment Limited approach distance (inches) Restricted approach distance (inches) Prohibited approach distance (inches) Equipment/bus name Date prepared Supplier name and address VAMC Lexington will aid gathering the data and personnel familiar with, and qualified to interact with, the electrical distribution systems (remove/replace panel covers, etc.). COORDINATION AND SHORT CIRCUIT STUDY This section specifies the requirements of the Electrical System Protective Device Study. A. A short circuit and coordination study shall be prepared for the electrical over current devices to be installed under this project to assure proper equipment and personnel protection. B. The study shall present an organized time current analysis of each protective device in series from the individual device back to the utility and the on-site generator sources. The study shall reflect the operation of each device during normal and abnormal current conditions. SUBMITTALS A. Submit the following: 1. Complete short circuit and coordination study as described herein. 2. Protective equipment shop drawings shall be submitted simultaneously with or after the protective device study. Protective equipment shop drawings will not be accepted prior to protective device study. 3. Certification: Two weeks prior to final inspection, submit four copies of the following to the Resident Engineer: 4.Certification by the Contractor that the protective devices have been adjusted and set in accordance with the approved protective device study. QUALIFICATIONS The protective device study shall be prepared by qualified engineers of the high voltage 15 KILOVOLT switchgear manufacturer or an approved consultant. The Contractor is responsible for providing all pertinent information required by the preparers to complete the study. REQUIREMENTS A. The complete study shall include a system one-line diagram, short circuit and ground fault analysis, and protective coordination plots. B. One Line Diagram: 1. Show, on the one-line diagram, all electrical equipment and wiring to be protected by the overcurrent devices installed under this project. Clearly show, on the one line, the schematic wiring of the electrical distribution system. 2. Also show on the one-line diagram the following specific information: a. Calculated fault impedance, X/R ratios, and short circuit values at each bus b. Breaker and fuse ratings c. Generator kW and Transformer kVA and voltage ratings, percent impedance, X/R ratios, and wiring connections. d. Voltage at each bus. e. Identification of each bus. f. Conduit material, feeder sizes, length, and X/R ratios. C. Short Circuit Study: 1. Systematically calculate the fault impedance to determine the available short circuit and ground fault currents at each bus. Incorporate the motor contribution in determining the momentary and interrupting ratings of the protective devices. 2. The study shall be calculated by means of a computer program. Pertinent data and the rationale employed in developing the calculations shall be incorporated in the introductory remarks of the study. 3. Present the data determined by the short circuit study in a table format. Include the following: a. Device identification. b. Operating voltage. c. Protective device. d. Device rating. e. Calculated short circuit current. D. Coordination Curves: 1. Prepare the coordination curves to determine the required settings of protective devices to assure selective coordination. Graphically illustrate on log log paper that adequate time separation exists between series devices, including the utility company upstream device. Plot the specific time current characteristics of each protective device in such a manner that all upstream devices will be clearly depicted on one sheet. 2. The following specific information shall also be shown on the coordination curves: a. Device identification. b. Voltage and current ratio for curves. c. 3 phase and 1 phase ANSI damage points for each transformer. d. No damage, melting, and clearing curves for fuses. e. Cable damage curves. f. Transformer inrush points. g. Maximum short circuit cutoff point. 3. Develop a table to summarize the settings selected for the protective devices. Include the following in the table: a. Device identification. b. Relay CT ratios, tap, time dial, and instantaneous pickup. c. Circuit breaker sensor rating, long time, short time, and instantaneous settings, and time bands. d. Fuse rating and type. e. Ground fault pickup and time delay. 5. ANALYSIS A. Analyze the short circuit calculations and highlight any equipment that is determined to be underrated as specified. Propose approaches to effectively protect the underrated equipment. Provide minor modifications to conform with the study (Examples of minor modifications are trip sizes within the same frame, the time curve characteristics of induction relays, C.T. ranges, etc.). B. After developing the coordination curves, highlight areas lacking coordination. Present a technical evaluation with a discussion of the logical compromises for best coordination. ADJUSTMENTS, SETTINGS AND MODIFICATIONS Necessary final field adjustments, settings and minor modifications shall be made to conform with the protective device study without additional cost to the Government. All final circuit breaker and relay settings and fuse sizes shall be made in accordance with the recommendations of the protective device study. Equipment List: The above procedures are to be implemented to all electrical equipment listed in the attached electrical studies for both Divisions. If an electrical equipment exists in the facility but does not show in the attached study, provide testing and maintains to equipment, and mark equipment s information and location on a hard copy of the attached studies. Provide marked copies with report upon completion. Workmen are subject to normal Medical Center rules: Smoking is not permitted on VA property Parking. One vehicle is authorized to load and unload material and equipment at loading docks. All other vehicles must park in Contractor designated area or as directed by Electronics Shop Supervisor. Routes to and from the work site will be as agreed by VA and Contractor. Appropriate, fully charged fire extinguishers will be provided by Contractor in work area(s). For any work involving open flames or sparks, Engineering Services will issue a hot work permit. Dust must be controlled so as not to migrate into patient/administrative areas or to set off fire alarm by smoke detectors. Contractor will be responsible for any charges by Fire Department due to false alarms caused by construction operations where these rules were not observed. Any penetrations of corridor walls, smoke walls or building fire walls will be fire stopped with approved (NFPA) materials appropriate for the fire rating involved. Such materials are to be pre-approved through submittal process as applicable and/or after the fact, if a discovered or differing site condition is encountered. OSHA compliance is mandatory. Use and honor all locks and tags. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access. Only employees of the Contractor or subcontractor(s) with VA-provided ID badges shall work on the site. It is the Contractors responsibility to coordinate with COR, contractor s employees and subcontractors to obtain VAMC Identification Badges prior to starting work. Contractor s employees and subcontractors must provide OSHA Cards and attend a Contractor s Orientation prior to obtaining a VA Photo Identification. A VA Issued Identification Process will be provided to Contractor during the Kick Off meeting. Contractor will leave the work areas clean or cleaner than existed before work began. Combustible materials will be removed at the end of each workday. WORK HOURS: The following terms have the following meanings and are applicable to this contract: Normal Work hours: 8:00 a.m. through 4:30p.m. ET, Monday through Friday. National Holidays: The eleven holidays observed by the Federal Government are: New Year s Day Martin Luther King s Birthday President s Day Memorial Day Juneteenth National Independence Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day Any national holiday declared by the President of the United States. (End Statement of Work) (iv) The anticipated award date is 12/01/2026 and delivery by 03/01/2027 (subject to change), Freight On Board (FOB) Destination and Location is: Lexington Veterans Administration (VA) Health Care System Two Divisions: Troy Bowling Campus, 1101 Veterans Drive, Lexington, KY 40502 and Sousley Campus, 2250 Leestown Road, Lexington, KY 40511 (v) Provisions 52.212-1 Instructions to Offerors-Commercial Products and Commercial Services (SEP 2023) 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998) https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_252_1 (FAR) http://www.va.gov/oal/library/vaar/index.asp (VAAR) 52.209-7 Information Regarding Responsibility Matters (OCT 2018) (DEVIATION NOV 2025) 52.212-2 Evaluation-Commercial Products and Commercial Services (NOV 2021) (DEVIATION OCT 2025) 52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. (SEP 2024) 52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation. (JAN 2017) 52.204-7 System for Award Management Registration (NOV 2024) 52.216-1 Type of Contract (APR 1984) (DEVIATION NOV 2025) 52.233-2 Service of Protest (SEP 2006) (DEVIATION NOV 2025) 852.209-70 Organizational Conflicts of Interest (OCT 2020) 852.233-70 Protest Content/Alternative Dispute Resolution (SEP 2018) 852.233-71 Alternate Protest Procedure (SEP 2018) 852.252-70 Solicitation Provisions or Clauses Incorporated by Reference (JAN 2008) (vi) Clauses 52.212-4 Contract Terms and Conditions-Commercial Products and Commercial Services (NOV 2023) (DEVIATION OCT 2025) 52.252-2 Clauses Incorporated by Reference (FEB 1998) https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_252_2 (FAR) and http://www.va.gov/oal/library/vaar/index.asp (VAAR) 52.203-6 ALT I. Restrictions on Subcontractor Sales to the Government.(NOV 2021) 52.203-17 Contractor Employee Whistleblower Rights. (NOV 2023) 52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011) 52.204-13 System for Award Management-Maintenance (OCT 2018) (DEVIATION NOV 2025) 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (JAN 2025) (DEVIATION NOV 2025) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters. (OCT 2018) (DEVIATION NOV 2025) 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (NOV 2015) (DEVIATION NOV 2025) 52.219-8 Utilization of Small Business Concerns (JAN 2025) 52.219-9 Small Business Subcontracting Plan. (JAN 2025) (DEVIATION NOV 2025) 52.219-14 Limitations on Subcontracting. (OCT 2022) (DEVIATION NOV 2025) 52.219-16 Liquidated Damages-Subcontracting Plan. (SEP 2021) (DEVIATION NOV 2025) 52.219-33 Nonmanufacturer Rule. (SEP 2021) (DEVIATION NOV 2025) 52.222-3 Convict Labor. (JUN 2003) (DEVIATION NOV 2025 52.222-35 Equal Opportunity for Veterans. (JUN 2020) (DEVIATION NOV 2025) 52.222-36 Equal Opportunity for Workers with Disabilities. (JUN 2020) 52.222-37 Employment Reports on Veterans. (JUN 2020) (DEVIATION NOV 2025) 52.222-40 Notification of Employee Rights Under the National Labor Relations Act. (DEC 2010) (DEVIATION NOV 2025) 52.222-41 Service Contract Labor Standards. (AUG 2018) (DEVIATION NOV 2025) 52.222-42 Statement of Equivalent Rates for Federal Hires. (MAY 2014) 52.222-43 Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts). (AUG 2018) (DEVIATION NOV 2025) 52.222-50 Combating Trafficking in Persons. (NOV 2021) (DEVIATION NOV 2025) 52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026 (JAN 2022) (DEVIATION NOV 2025) 52.222-62 Paid Sick Leave Under Executive Order 13706. (JAN 2022) (DEVIATION NOV 2025) 52.222-90 Addressing DEI Discrimination by Federal Contractors (APR 2026) 52.225-3 Buy American-Free Trade Agreements-Israeli Trade Act. (NOV 2023) (DEVIATION NOV 2025) 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving. (MAY 2024) 52.228-5 Insurance-Work on a Government Installation (JAN 1997) CL-120 Supplemental Insurance Requirements 52.232-33 Payment by Electronic Funds Transfer-System for Award Management. (OCT 2018) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. (MAR 2023) 52.233-3 Protest after Award. (AUG 1996) (DEVIATION NOV 2025) 52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004) (DEVIATION NOV 2025) 52.237-2 Protection of Government Buildings, Equipment, and Vegetation (APR 1984) 52.240-91 Security Prohibitions and Exclusions. (DEVIATION NOV 2025) 52.244-6 Subcontracts for Commercial Products and Commercial Services. (JAN 2025) (DEVIATION OCT 2025) 52.252-6 Authorized Deviations in Clauses (NOV 2020 852.201-70 Contracting Officer s Representative (DEC 2022) 852.203-70 Commercial Advertising (MAY 2018) 852.204-70 Personal Identity Verification of Contractor Personnel (MAR 2026) (DEVIATION FEB 2026) 852.211-72 Technical Industry Standards (NOV 2018) 852.219-73 VA Notice to Total Set-Aside for Certified Service-Disabled Veteran-Owned Small Businesses (JAN 2023) (DEVIATION) 852.219-75 VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction (JAN 2023) (DEVIATION) 852.222-71 Compliance with Executive Order 13899 (DEVIATION) (APR 2025) 852.232-72 Electronic Submission of Payment Requests (NOV 2018) 852.237-75 Key Personnel (OCT 2019) 852.242-71 Administrative Contracting Officer (OCT 2020) (vii) Quotes are due 11/30/2026 at 11:00 AM ( CT) via email to diane.ziegler@va.gov . POC is Diane Ziegler by email diane.ziegler@va.gov. (viii) FAR 52.212-1, Instructions to Offerors-Commercial Products and Commercial Services, applies to this acquisition and a statement regarding any addenda to the provision. This solicitation requires registration with the System for Award Management (SAM) prior to award, pursuant to applicable regulations and guidelines. Registration information is at www.sam.gov. This is an open-market combined synopsis/solicitation for services as defined herein. The government intends to award a Purchase Order as a result of this combined synopsis/solicitation that will include the terms and conditions set forth herein. Submitting your quote: Submit your company s quote by email the address specified on page 1 and section (vii) of this Request for Quotes (RFQ) utilizing either PDF or Microsoft Word file formats comprised of not more than 5 documents total (8 Megabyte File Size Limitation). Reply by email with Subject RFQ 36C24927Q0038 response . If a concern submits more than one quote all quotes may be rejected from that concern. Quotes received that do not contain all of the following information being requested may be considered unacceptable. Submission deadline: Your quote must be received at the email address specified by the deadline specified on page 1 and section (vii). We will not consider any quote that we receive after the deadline unless we receive it before we issue an award and considering it will not delay the award. In case of an emergency that delays our operations and makes submission or receipt of your quote impossible, we will extend the deadline by one working day. All interested Parties are hereby advised that the Government shall not be responsible for late submissions, wi-fi/server interruptions related to the submission of a quote. It shall be the responsibility of each quoter to confirm receipt of quote with the Contracting Officer at the time of submission or prior to the close of the solicitation. Terms and content of your quote: Quote must be based on the terms of this RFQ. We may reject any quote that is not based on these terms in every respect. Your quote must contain all of the information described below. Information to be submitted: The following information is required on your quote: 1. RFQ Number: 36C24927Q0038 2. CONTRACTOR ________________________________________ (Contractor s Name) 3. ADDRESS ________________________________________(Street-City-State-Zip) 4. POINT OF CONTACT ________________________________________ (Name/Title/Phone/Email) 5. SAM UEI NUMBER ________________________________________ 6. All quotes shall include a statement regarding the terms and conditions herein as follows: "The terms and conditions in the RFQ are acceptable to be included in the award document without modification, deletion, or addition." 7. Provide a statement that your company s Offeror Representations and Certifications are complete in SAM.gov. 8. ACKNOWLEDGMENT OF AMENDMENTS: The quoter acknowledges receipt of amendments to the synopsis solicitation numbered and dated as follows: AMENDMENT NO DATE Add rows as needed. The above amendment section shall be filled out in the event that an Amendment(s) is sent to the quoter or posted to www.sam.gov and shall be returned with the RFQ package. Failure to acknowledge amendment(s) may constitute the rejection of the quote. ADDENDUM to FAR 52.212-1 INSTRUCTIONS TO OFFERORS - COMMERCIAL ITEMS Provisions that are incorporated by reference (by Citation Number, Title, and Date), have the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The version of FAR 52.212-1 in the addendum is tailored for Simplified Acquisition Procedures and supersedes the current version of FAR 52.212-1 contained in the FAR. The full text of FAR provisions or clauses may be accessed electronically at https://www.acquisition.gov/browse/index/far (ix) FAR 52.212-2, Evaluation-Commercial Products and Commercial Services, Evaluation of Quotes: The Government will select the quote that represents the best benefit to the Government at a price that can be determined reasonable. The Government will evaluate price, technical capabilities, and past performance. Following receipt of quotes, the Government will perform an evaluation using a Lowest Price Technically Acceptable source Selection Process of the services quoted. The Government will compare quotes select the service that best benefits the Government by fulfilling the requirement. The evaluation of Government requirements outlined in this request for quote will determine suitability. Once the Government determines there is/are a contractor(s) that can provide a service that meet(s) the requirements of this request for quote, the Government reserves the right to communicate with only those contractors quoting the best-suited service to address any remaining issues. The Government will evaluate quotes for award purposes for total price, no options evaluated. Award will be made to the quote determined to be acceptable, price reasonable, and is determined to best value to the government; all eligible quoters may submit quotes. All quoters must be registered in System for Award Management (SAM) at https://www.sam.gov at time quotes are due to be considered for an award of a federal contract. Registration must be complete and not missing any elements such as representations and certifications. To be eligible for this SDVOSB 100% set-aside your company s registrations shall include the appropriate NAICS code 238210 - Electrical Contractors and Other Wiring Installation Contractors. (x) Quoters shall include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications-Commercial Products and Commercial Services, with its quote. (xi) FAR clause 52.212-4, Contract Terms and Conditions-Commercial Products and Commercial Services, applies to this acquisition and a statement regarding any addenda to the clause. Provisions and clauses are those in effect through Federal Acquisition Circular RFO FAR COMMERCIAL CHECKLIST FAC 2026-01 (eff. 03/13/2026) FAR Deviation APR 2026 (eff. 04/23/2026);VAAR DEVIATION OCT 2026 (eff. 10/01/2026) VAAM Alert 26-01 (eff. 10/01/2025); Acquisition Policy Flash 27-02 eff. 10/01/2026). (xv) All questions regarding this RFQ must be in writing and may be sent by e mail to diane.ziegler@va.gov . VENDOR QUESTIONS: Questions must be received no later than 11/18/2026 @ 03:00 PM CT. No further questions will be accepted after that date and time. ANSWERS TO VENDOR QUESTIONS: Answers to vendor questions will be addressed in an amendment to Contracting Opportunities no later than 11/23/2026 at 5:00 PM CT. You are reminded that representatives from your company SHALL NOT contact any VA Medical Center personnel to discuss this RFQ during this RFQ process. All questions and concerns regarding this RFQ shall be directed to the Contracting Officer by email. To be considered for this award the Contractor must provide the following: PRICE Quoters are requested to complete and return Price/Cost Schedule located on pages 3 of this RFQ. TECHNICAL Contractor to provide a detailed quote to achieve the Government s objectives identified within the Statement of Work. The government requirements for technical evaluations are as follows: Contractor Qualifications & Certifications Subfactor 1: The Offeror shall list resumes of Project Manager and/or Site Superintendent. (SOW Section 2 A). Subfactor 2: The Offeror shall list NETA certified (or equivalent) technicians that are going to work on this service. NFPA 70E Qualified Person training documentation submitted. OSHA 10 hour (technicians) / OSHA 30 hour (PM/Superintendent). (SOW Section 2 B). Subfactor 3: The Offeror shall demonstrate greater than 5 years continuous experience in healthcare/industrial/commercial electrical distribution systems with Project Manager and/or Site Superintendent. (SOW Section 2 C). Subfactor 4: The Offeror shall demonstrate experience with required equipment types (LV/MV switchgear, ATS, transformers, relays, grounding, etc.) with Project Manager and/or Site Superintendent. (SOW Section 2 C). Subfactor 5: The Offeror shall list a minimum of one service where they have developed a Short Circuit & Coordination study. Must be prepared by qualified engineer (switchgear manufacturer or approved consultant). (SOW Section 7 Arc Flash Study). Subfactor 6: The Offeror shall list a minimum of one service where they have developed an Arc Flash Coordination study. Must be prepared by qualified engineer (switchgear manufacturer or approved consultant). (SOW Section 7 COORDINATION AND SHORT CIRCUIT STUDY). Technical Approach & Work Plan- Subfactor 7: The Offeror shall provide a detailed schedule; progress chart included with outage coordination plan (off hours/weekends; utility coordination). (SOW Section 3 A). Subfactor 8: The Offeror shall provide Lockout tag out procedures; energized work permit plan; PPE and safety protocols. (SOW Section 6 1C). Subfactor 9: The Offeror shall provide a full plan for Joint Commission/VHA 4 hour EES test participation. (SOW Section 3E). Subfactor 10: The Offeror shall provide documentation that all instruments, test equipment, tools and PPE have current calibration. (SOW Section 2F). PAST PERFORMANCE Vendors submitting a quote shall be regularly established in the business of providing the services identified in the Statement of Work and who have experience with commercial contracts of similar demand or greater, with conditions and scope as required for this contract. Vendors submitting a quote shall provide 3 (THREE) identified references when submitting their quote. Emphasis will be on recent and relevant past performance. Recent is defined as work performed within the last 3 (THREE) years. Relevant is defined as work similar in scope of the work described in the Statement of Work. Contract: Start Date of Contract: End Date of Contract: Reference s Name and Phone Number: Type of work performed & product used: EVALUATION The Government will award a contract resulting from this solicitation to the responsible quoter whose quote conforming to the solicitation will be most advantageous to the Government, price and other factors considered, reference FAR 12.204. The following factors shall be used to evaluate quotes in order of importance: Price Technical Past performance Before making award, the Contracting Officer will determine whether the proposed price is fair and reasonable in accordance with RFO 12.203. Options. No options evaluated. A written notice of award or acceptance of a quote, mailed or otherwise furnished to the successful quote within the time for acceptance specified in the quote, shall result in a binding contract without further action by either party. Before the quote s specified expiration time, the Government may accept a quote (or part of a quote), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award. (xvi) Point of Contact: Diane Ziegler diane.ziegler@va.gov
-Combined Synopsis11/30/2027
Amendment A0004 This Amendment 0004 extends out due date. We are working on responses to a few additional RFIs and will publish the responses in Amendment A0005. VIRTUAL BID OPENING INFORMATION: 1) There will be no in-person public bid opening process. This will be conducted as a public virtual activity. 2) The virtual bid opening will be available to the public via Microsoft Teams at the following link and/or phone number: Join: https://teams.microsoft.com/meet/2473414420095?p=HOJS7WNgrbgMwvO73f (Meeting will be available to be accessed 10 min prior to bid opening) Meeting ID: 247 341 442 009 5 Passcode: ks79ub9w Dial-in by phone: 1-872-701-0185; Phone conference ID: 947 858 19# 3) IAW FAR 52.214-5 Submission of Bids and FAR 14.202-8 Electronic Bids; Bids shall be provided via email to the Contracting Officer at Lynn.VanderVelde@va.gov AND Ryan.McMillin@va.gov as follows: with Subject: 36C25226B0014 BIDS DUE: Vendor bids are due via email as shown above at 10:00 AM local time on December 1st. The virtual public bid opening will be held at 11:30 AM local time on December 1st at the link and/or the phone # provided above. ……..End of Amendment A0004……..
-Solicitation12/01/2026
This is a presolicitation notice pursuant to FAR 5.201, announcing an upcoming competitive solicitation for a firm-fixed-project construction project. Network Contracting Office 20 (NCO 20), supporting the Veterans Affairs Southern Oregon Rehabilitation Center and Clinics (VA SORCC) located in White City, OR anticipates releasing a Request for Proposals in the upcoming months of Fiscal Year 2027. This notice synopsizes the requirement but is not a solicitation or otherwise a request for pricing. This does not commit the Government to issue the solicitation or award a contract. The RFP, if released, will be posted on Contract Opportunities located on SAM.gov only under the identifier 36C26027R0027. Interested parties are invited to follow this identifier to receive updates. The RFP will be a total set-aside for Service-Disabled Veteran-Owned Small Businesses. It is anticipated to result in the award of one (1) firm-fixed-price contract for the entire scope of work. The scope of work will be to remove existing lighting and install new, more energy efficient lighting in various locations across campus. More information will be provided in the RFP, if released. This requirement will be subject to the Buy American Act and the VA Limitations on Subcontracting. For questions- please contact Helen.Woods@va.gov cc Alan.Perez@va.gov.
-Pre-Solicitation11/03/2026
Description: Â The Richard L. Roudebush VA Medical Center (RLR VAMC) has developed this project for the purpose of replacing and expanding the electrical distribution infrastructure serving the A-Wing of Building 1 (the main hospital tower). Generally, the work shall be required to include, but not be limited to the replacement and expansion of the secondary electrical distribution system serving A-Wing of Building 1 and the expansion and modification of the existing primary Medical Center campus electrical distribution system as required to support those improvements including work associated within Building 01 (A-Wing), Building 23, and adjacent exterior/campus utility areas as indicated in the contract drawings and specifications. Â Definitization of Equitable Adjustments: Â When/if change orders are issued under the resulting contract, they will be issued under the following authority(s): FAR 52.243-4, Changes (JUL 2025) (Deviation), VAAR 852.243-70, Construction Contract Changes Supplement (SEP 2019). Â The agency will follow the procedures located at FAR 43, VAAR 843 and VAAM M843. The Contracting Officer will make the final decisions for items not addressed by regulation or policy. Â The agency's past performance, for the prior 3 fiscal years, regarding the time required to definitize equitable adjustments for change orders under construction contracts will be posted as soon as it is available. Â Additional Acquisition Information: Â All responsible sources may submit a quotation, bid, or proposal, as appropriate, which will be considered by the agency. Â At the time of submission of offers/quotes, and at the time of award of any contract, the offeror must represent to the contracting officer that it is a SDVOSB/VOSB eligible under this subpart, small business concern under the North American Industry Classification System (NAICS) code assigned to the acquisition and certified SDVOSB/VOSB listed in the SBA certification database at https://search.certifications.sba.gov. Â A joint venture may be considered eligible if it meets the requirements in 13 CFR part 128, and the managing joint venture partner makes the representations. To receive a benefit under the Veterans First Contacting Program, an otherwise eligible SDVOSB/VOSB certified pursuant to 13 CFR 128, must also meet SBA requirements at 13 CFR parts 121, 125, and 128 including the nonmanufacturer rule requirements at 13 CFR 121.406(b) and limitations on subcontracting at 13 CFR 125.6. The nonmanufacturer rule (see 13 CFR 121.406) and the limitations on subcontracting requirements apply to all SDVOSB and VOSB set-aside and sole source contracts above the micro-purchase threshold. In addition, an offeror shall submit a certification of compliance to be considered eligible for any award under this part (see 819.7004). Pursuant to 38 USC 8127(g), any business concern that is determined by VA to have willfully and intentionally misrepresented a company s SDVOSB/VOSB status is subject to debarment from contracting with the Department for a period of not less than five years. This includes the debarment of all principals in the business. Â System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in this solicitation. Contracting officers will rely on representations from offers based on provisions in the solicitation. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM. Â ***End of Presolicitation Notice***
-Pre-Solicitation10/23/2026

Additional Details

Solicitation Number

36C24926R0065

Archive Date

Oct 30, 2026

Office Address

MURFREESBORO, TN, 37129