P400--436-24-105 Miles City VA Campus Demolition
Awarded on June 16, 2026. Full description on SAM.gov.
Overview
- Posted
- June 16, 2026
- Notice type
- Award Notice
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
Notice details
- Office
- NETWORK CONTRACT OFFICE 19 (36C259)
- Place of performance
- Department of Veterans Affairs Montana VA Health Care System, Miles City, Montana, 59301
- Last updated
- Oct 29, 2026
- First published
- Last updated on SAM.gov
- Award date
- Jun 16, 2026
- Award amount (SAM.gov award notice)
- $6.0M
Identifiers
- Solicitation number
- 36C25926R0047
- Notice ID
- d758a9c13b1f43259f454674b507b2a8
- Award number (PIID)
- 36C25926C0054
Description
Award Overview
Award Number
36C25926C0054
Award Amount (SAM.gov award notice)
$6.0M
Award Date
Jun 16, 2026
Awardee
Awardee UEI
HEB5JDZGDMK1
Awardee CAGE Code
80X95
Awardee Address
GREAT FALLS, MT 59401, MARTINIQUE
Line Item Number
All
Original Solicitation
Notice ID: d758a9c13b1f43259f454674b507b2a8
Posted Date: Jun 16, 2026
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Documents
Files (54)
- Download
36C25926R0047 0003.docx
45 KBAdded in Solicitation version 7Posted - Download
S02-3-10-2021 Past Performance Questionnaire_Blank_Fillable PDF.pdf
264 KBAdded in Solicitation version 3Posted - Download
13081 VA MC Managment Plan Update Report.pdf
3.6 MBAdded in Solicitation version 3Posted - Download
Miles City VA Asbestos Abatement Final Drawings - May 2013 - Volume 1 of 2.pdf
4.6 MBAdded in Solicitation version 3Posted - Download
UCS_Asbestos_Bulk_Results_Bldg_1_Miles_City.pdf
66 KBAdded in Solicitation version 3Posted - Download
Miles City Asbestos Inspection Report Addendum 4-20-13.pdf
773 KBAdded in Solicitation version 3Posted - Download
Section 01 33 23 SHOP DRAWINGS PRODUCT DATA AND SAMPLES.pdf
164 KBAdded in Solicitation version 3Posted - Download
36C25926R0047 0002.docx
4.9 MBAdded in Solicitation version 3Posted - Download
36C25926R0047 0001.pdf
887 KBAdded in Solicitation version 3Posted - Download
436-1948 MILES CITY MISC HVAC AND UTLITIES.pdf
15 MBAdded in Solicitation version 3Posted - Download
Veterans Hospital_Part1.pdf
45 MBAdded in Solicitation version 3Posted - Download
Veterans Hospital_Part2.pdf
42 MBAdded in Solicitation version 3Posted - Download
Veterans Hospital_Part3.pdf
40 MBAdded in Solicitation version 3Posted - Download
Veterans Hospital_Part4.pdf
40 MBAdded in Solicitation version 3Posted - Download
Veterans Hospital_Part5.pdf
39 MBAdded in Solicitation version 3Posted - Download
Veterans Hospital_Part6.pdf
39 MBAdded in Solicitation version 3Posted - Download
Veterans Hospital_Part7.pdf
39 MBAdded in Solicitation version 3Posted - Download
Veterans Hospital_Part8.pdf
44 MBAdded in Solicitation version 3Posted - Download
Veterans Hospital_Part9.pdf
43 MBAdded in Solicitation version 3Posted - Download
Veterans Hospital_Part10.pdf
40 MBAdded in Solicitation version 3Posted - Download
Veterans Hospital_Part11.pdf
39 MBAdded in Solicitation version 3Posted - Download
Veterans Hospital_Part12.pdf
42 MBAdded in Solicitation version 3Posted - Download
Veterans Hospital_Part13.pdf
44 MBAdded in Solicitation version 3Posted - Download
Veterans Hospital_Part14.pdf
40 MBAdded in Solicitation version 3Posted - Download
Veterans Hospital_Part15.pdf
40 MBAdded in Solicitation version 3Posted - Download
Veterans Hospital_Part16.pdf
38 MBAdded in Solicitation version 3Posted - Download
Veterans Hospital_Part17.pdf
43 MBAdded in Solicitation version 3Posted - Download
Veterans Hospital_Part18.pdf
6.9 MBAdded in Solicitation version 3Posted - Download
Well Information.pdf
60 KBAdded in Solicitation version 3Posted - Download
VHA PCRA-1.1 Miles City Campus Demolition.pdf
308 KBAdded in Solicitation version 3Posted - Download
S04 436-24-105 Miles City VA Campus Demolition Site Visit Attendance.pdf
414 KBAdded in Solicitation version 3Posted - Download
S04 - 436-24-105 Miles City VA Campus Demolition Site Visit Meeting Doc.pdf
152 KBAdded in Solicitation version 3Posted - Download
S22- 852.219-75 LOS Certification.pdf
146 KBAdded in Solicitation version 3Posted - Download
13_436GJ_TT113_SITE PLAN.pdf
1.0 MBAdded in Solicitation version 3Posted - Download
12_436GJ_1_TT112_NURSING HOME FLOOR PLANS.pdf
881 KBAdded in Solicitation version 3Posted - Download
11_436GJ_OPC_TT111_FLOOR PLAN BUILDING OPC - 1ST FLOOR.pdf
668 KBAdded in Solicitation version 3Posted - Download
10_436GJ_20_TT110_BUILDING 20 FLOOR PLANS.pdf
677 KBAdded in Solicitation version 3Posted - Download
9_436GJ_10_TT109_BOILER PLANT FLOOR PLANS.pdf
776 KBAdded in Solicitation version 3Posted - Download
7_436GJ_8_TT107_FLOOR PLANS BUILDING 8.pdf
1.1 MBAdded in Solicitation version 3Posted - Download
6_436GJ_3_TT106_FLOOR PLAN BUILDING 3 - 1ST FLOOR.pdf
1.1 MBAdded in Solicitation version 3Posted - Download
5_436GJ_1_TT105_FLOOR PLAN BUILDING 1 - 4TH FLOOR.pdf
817 KBAdded in Solicitation version 3Posted - Download
4_436GJ_1_TT104_FLOOR PLAN BUILDING 1 3RD FLOOR.pdf
928 KBAdded in Solicitation version 3Posted - Download
3_436GJ_1_TT103_SECOND FLOOR PLAN.pdf
999 KBAdded in Solicitation version 3Posted - Download
2_436GJ_1_TT102_BUILDING 1 CABLE PLANT INFRASTRUCTURE.pdf
1.0 MBAdded in Solicitation version 3Posted - Download
1_436GJ_1_TT101_MILES CITY MONTANA SYMBOLS LEGEND AND GENERAL NOTES.pdf
619 KBAdded in Solicitation version 3Posted - Download
0_436GJ_1_TT100_COVER SHEET.pdf
298 KBAdded in Solicitation version 3Posted - Download
SCA Wage Determination 15-5395 12-03-2025.pdf
72 KBAdded in Solicitation version 2Posted - Download
14190 Final Report - Reduced.pdf
7.1 MBAdded in Solicitation version 2Posted - Download
Miles City VA Phase 2 ESA Report -Final 122719.pdf
8.2 MBAdded in Solicitation version 2Posted - Download
436-24-105 Miles City Campus Demolition -SPECS.pdf
1.1 MBAdded in Solicitation version 2Posted - Download
436-24-105 Miles City Campus Demolition - APPENDIX A.pdf
4.6 MBAdded in Solicitation version 2Posted - Download
S22- 852.219-75 LOS Certification.docx
17 KBAdded in Solicitation version 2Posted - Download
36C25926C0054_1.docx
13 KBAdded in Award Notice version 5Posted - Download
36C25926R0047.docx
2.6 MBAdded in Solicitation version 2Posted
Links (1)
- Department of Veterans Affairswww.va.govPosted
Lifecycle
- 3Version 3SolicitationArchived
P400--436-24-105 Miles City VA Campus Demolition
- 5Version 5Award NoticeArchivedCurrent
Type changed from Solicitation to Award Notice
P400--436-24-105 Miles City VA Campus Demolition
Other notices for this solicitation
- Pre-SolicitationRelated noticeFeb 5, 2026
P400--436-24-105 Miles City VA Campus Demolition
- Pre-SolicitationRelated noticeMar 26, 2026
P400--436-24-105 Miles City VA Campus Demolition
- SolicitationRelated noticeMar 31, 2026
P400--436-24-105 Miles City VA Campus Demolition
- SolicitationRelated noticeApr 29, 2026
P400--436-24-105 Miles City VA Campus Demolition
- SolicitationRelated noticeMay 19, 2026
P400--436-24-105 Miles City VA Campus Demolition
- SolicitationRelated noticeMay 19, 2026
P400--436-24-105 Miles City VA Campus Demolition
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Amendment 0005 to add Questions and Answers, Attachment 18_ECS-000 - Construction Plans - Specifications and As-built Record Drawings, Attachment 19_BDA-Aviation-II-As-Built-Drawings-vol-1, and update PWS Paragraph 5.3.1 from (5.3.1. The BRK facilities, 1-25 are two story structures that are approximately 28-7 in height and approximately 97-4 in width, with metal siding and roofing panels. There is an attached pressure-treated deck providing entrance to the first level, which contains a laundry room, two kitchenettes, two bathrooms, six bedrooms, stairwell and a concrete slab on grade mechanical room with exterior access only. The second level mirrors the first with the only exception being there is interior access to the mechanical room. Each level is approximately 3,168 sq ft. Refer to attachments 3, 4 and 5 for structural information) to (5.3.1. The BRK Facilities 1 through 25 are two-story structures measuring approximately 97?4 wide, 33 long, and 28?7 high. Constructed with metal siding and roofing, each facility is built on a 4,400 sq ft concrete slab. There is an attached pressure-treated deck providing entrance to the first level, which contains a laundry room, two kitchenettes, two bathrooms, six bedrooms, stairwell and a mechanical room with exterior access only. The second level mirrors the first with the only exception being there is interior access to the mechanical room. Each level is approximately 3,168 sq ft. Refer to attachments 1, 2 and 3 for structural information.) | 69% | Combined Synopsis | 06/15/2026 |
The purpose of this amendment is to extend the proposal submission deadline from 15 July 2026 to 27 July 2026.PRE-DEMOLITION SURVEY VARIOUS BUILDINGS Marine Corps Air Station in Yuma, Arizona. The objective of this Performance Work Statement (PWS) is to plan and complete the environmental sampling of excess facilities at the specified installation. The structures of concern are listed in Table I. The sampling will identify and determine the extent of Asbestos-Containing Materials (ACM) and Other Regulated Materials (ORM). Additionally, the Contractor shall complete a Waste Stream Analysis for RCRA 8 metals, Lead-Based Paint (LBP), and PCBs-in-paint for those parts of the structure currently identified as potentially having painted components. Following sampling, the Contractor shall be able to characterize and quantify the environmental contamination present to the extent necessary for demolition planning and waste disposal profiling. The Contractor shall identify the methods required to abate, remove, and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with applicable Federal, State, and local regulations. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. The results of the site investigation and sampling effort will be provided in a comprehensive Pre- Demolition Assessment Report encompassing all assessed facilities. The Contractor?s proposed schedule, submitted with their proposal, shall establish the timeline for laboratory testing, analysis, and the final report submittal. The intent of this contract?s effort is to provide comprehensive sampling for all ACM/ORM materials, including the facility exterior, roof, basements, and crawl spaces. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within the structures that were not accessible during the survey, detailing the size of the area not accessed and the current or immediate previous use of the area not sampled. | 63% | Solicitation | 07/27/2026 |
Sources Sought Notice for the Demolition and Decommissioning of the General Leonard Wood Army Community Hospital (GLWACH) Contract. This requirement was previously published on SAM.gov as the seed project for the Dismantling, Demolition, and Removal of Improvements Multiple Award Task Order Contract (MATOC). The U.S. Army Corps of Engineers, Kansas City District intends to solicit and award a Design-Build (DB) contract for the demolition and decommissioning of the General Leonard Wood Army Community Hospital on Fort Leonard Wood, Missouri. The demolition of the former General Leonard Wood Army Community Hospital (GLWACH) consists of the complete removal of the following buildings: hospital and clinic (B310), Central Utility Plant (B311), and temporary Helipad. The building demolition will ensure that the connected Optical Fabrication Lab (B311) remains with limited to no degradation to operations. The Government proposes to issue a single firm fixed price type contract for this project. This Sources Sought notice is for market research and planning purposes only. This does not constitute a solicitation and shall not be construed as a commitment by the Government to award a contract from responses to this announcement, nor does it obligate the Government to produce a solicitation in the future. Any information submitted by interested parties is strictly voluntary and no monetary compensation will be provided for response preparation or follow-up requests. The purpose of this Sources Sought Notice is to gain knowledge of potential and interested qualified contractors capable of performing hazardous material abatement, building demolition, decommissioning services, and removal of improvements. This effort is classified through the North American Industry Classification System (NAICS) under 238910 Site Preparation Contractors. The small business size standard for NAICS 238910 is $19M. The magnitude of this project is more than $10,000,000.00. It is anticipated that a solicitation announcement will be published on SAM.gov in mid-2026. The following information is requested in this Sources Sought (SS) announcement: 1. Firm’s name, address, email address, website address, telephone number, and point of contact. 2. Firm’s CAGE Code and UEI number. 3. Company size (Small or Large), in accordance with the NAICS 238910. 4. If a Small Business, specify if your company is any of the following: Small Disadvantaged Business, Service-Disabled Veteran Owned Small Business (SDVOSB); Veteran Owned Small Business, HUBZone Small Business; 8(a) Small Business concern; or Women-Owned Small Business. 5. Firm’s interest in providing a proposal as the prime contractor on the pending solicitation once issued. 6. Experience: Evidence of capabilities to perform work comparable to that required for the project. 7. Provide a maximum of 3 recent (within the last 6 years) relevant/comparable projects and describe how they are similar to this project. Include the project name; when the project was completed; dollar value of the project; description of the key/salient features of the project, identify the contracting office & the customer/user (include POC information). Construction Bonding level per contract and aggregate construction bonding level, both expressed in dollars. A summary of the scope is below: Abatement of hazardous materials and environmental liabilities within GLWACH and other facilities to be demolished Demolition of GLWACH (472,600sf) and Primary Care Clinic structures, including foundations. Demolition of Central Utility Plant Demolition of Fuel Tanks Demolition of utilities, paving and other site appurtenances, within the boundaries identified. Demolition of communications infrastructure to various buildings that are currently served from GLWACH. Demolition of temporary Helipad. Construction of new exterior wall between Regional Optical Fabrication Lab and GLWACH. Construction of storm drainage and detention Backfill and establishment of turf following removal of building foundations. Decommissioning Statement The contractor shall remove all debris, and any other material not otherwise tagged for salvage or reuse on the project (examples are existing attic stock, old architectural drawings, spare parts & materials, files, etc.) 1. Decommission medical air, vacuum, and gas systems: a. Disconnect master medical gas alarm b. Disconnect zone medical gas alarms. c. Remove medical gas manifolds d. Remove medical air pumps e. Remove medical vacuum pump and tank f. Remove dental air pump g. Remove dental vacuum pumps and tank h. Purge and cap medical gas system throughout MTF. Cut and cap MED gas at main entry point, then purge lines at each valve and tag “NOT IN USE” i. Remove spit tank, filter, and dispose of contaminant off post. 2. Decommission medical low-voltage systems: a. Disable temperature monitoring system. b. Deactivate and remove pharmacy duress visible components. c. Deactivate and remove Infant Abduction System/HUGS systems and visible components. d. Remove all information technology (IT) switches. e. Deactivate and remove ceiling mounted Wi-Fi antennas and repeaters f. Deactivate and remove ceiling and external mounted cameras. 3. Decommission HVAC systems: a. Clean and cap laboratory & radiology vent hoods, dispose of filters, and remove hazardous signs. b. Disconnect all HVAC lines for refrigerant systems. c. Cut and cap chilled water (CHW) from central utility plant (CUP) d. Drain and purge HVAC CHW and reheat hot water (RHW) in CUP e. Drain and purge glycol from all HVAC systems. 4. Decommission wastewater systems and laboratory systems: a. Survey drains and P-traps in Dental and Laboratory for mercury contamination; remove all sink P-traps and remediate. b. Dental vacuum lines in dental clinic are contaminated for mercury, remove vacuum lines from dental clinic to storage tank. 5. Decommission Nutrition Care Division (NCD) and Sterile Processing Department (SPD): a. Cut and cap steam lines. 6. Decommission/Deactivate Fire Suppression Systems: a. Deactivate and secure range hood fire suppression systems in NCD kitchen. b. Deactivate the Data Center FM200 suppression systems; remove and dispose of storage tanks. c. Deactivate carbon dioxide extinguishing system in emergency generator room; remove and dispose of storage tanks. d. Dispose of the left-over fire extinguishers. 7. Decommission Hydraulic Elevators (2): a. Drain and purge hydraulic oil from elevators (2) from GLWACH. b. Contractor shall dispose of oil off post. 8. Decommission Two Diesel Fuel Tank (approximately 10,000 Gallons) located next to CUP in an exterior closure. a. Drain and purge diesel from tanks and lines going to generator and fire pump. b. Contractor shall take possession of fuel. The responses must be specific to the qualifications listed above to show that the respondent is qualified and possesses the necessary skills, experience, and capabilities. If a response does not clearly demonstrate that the respondent meets the qualifications, possesses the necessary skills, experience, and capability the response will not be considered as confirmed capability for the purposes of market research. Please send your Sources Sought responses via email to stephanie.r.kretzer@usace.army.mil and jeri.l.halterman@usace.army.mil. Submissions should be received by 10:00 a.m. Central Daylight Time (CDT), March 20, 2026. | 63% | Market Research | 03/20/2026 |
The 633 Contracting Squadron has a need to acquire non-personnel services to provide Contractor services to demolish a Fire Training Building, Facility 1345, located at Joint Base Langley-Eustis (JBLE) - Langley, Virginia. This is not a formal Request for Quote (RFQ), and no contract will result from this notice, nor does it commit the Government to any acquisition for these services. The Government plans to consider all information submitted in response to this Sources Sought Notice. Your response will be used solely for market research purposes in the formulation of an acquisition strategy as applicable. Please refer to the attached documentation for detailed requirements and response instructions. | 61% | Market Research | 11/25/2026 |
61% | Awarded | Open |
Additional Details
Solicitation Number
36C25926R0047
Archive Date
Sep 14, 2026
Office Address
Greenwood Village, CO, 80111