GovChime
Notice ID: d163bbe08eee4f0cac774eb131a9a25eSolicitation

PRE-DEMOLITION SURVEY VARIOUS BUILDINGS Marine Corps Air Station in Yuma, Arizona

Responses closed . Full description on SAM.gov.

Overview

Response deadline
9:00 AM CDT
Posted
July 15, 2026
Notice type
Solicitation
Set-aside
Women-Owned Small Business
NAICS
238910: Site Preparation Contractors
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.SCO ALEXANDRIA.SUPPORT CENTER HUNTSVILLE.W2V6 USA ENG SPT CTR HUNTSVIL
Place of performance
Yuma, Arizona
PSC
P400: SALVAGE- DEMOLITION OF BUILDINGS
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W912DY26RA107
Notice ID
d163bbe08eee4f0cac774eb131a9a25e

Description

The purpose of this amendment is to extend the proposal submission deadline from 15 July 2026 to 27 July 2026.PRE-DEMOLITION SURVEY VARIOUS BUILDINGS Marine Corps Air Station in Yuma, Arizona. The objective of this Performance Work Statement (PWS) is to plan and complete the environmental sampling of excess facilities at the specified installation. The structures of concern are listed in Table I. The sampling will identify and determine the extent of Asbestos-Containing Materials (ACM) and Other Regulated Materials (ORM). Additionally, the Contractor shall complete a Waste Stream Analysis for RCRA 8 metals, Lead-Based Paint (LBP), and PCBs-in-paint for those parts of the structure currently identified as potentially having painted components. Following sampling, the Contractor shall be able to characterize and quantify the environmental contamination present to the extent necessary for demolition planning and waste disposal profiling. The Contractor shall identify the methods required to abate, remove, and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with applicable Federal, State, and local regulations. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. The results of the site investigation and sampling effort will be provided in a comprehensive Pre- Demolition Assessment Report encompassing all assessed facilities. The Contractor?s proposed schedule, submitted with their proposal, shall establish the timeline for laboratory testing, analysis, and the final report submittal. The intent of this contract?s effort is to provide comprehensive sampling for all ACM/ORM materials, including the facility exterior, roof, basements, and crawl spaces. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within the structures that were not accessible during the survey, detailing the size of the area not accessed and the current or immediate previous use of the area not sampled.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (14)

Lifecycle

  1. 1
    Version 1Solicitation

    Pre-Demolition Survey of Various Buildings, Marine Corps Air Station, Yuma, Arizona

    Notice cefea61876024538a833dd3282268ed9 on SAM.gov

  2. 2
    Version 2Solicitation

    Pre-Demolition Survey of Various Buildings, Marine Corps Air Station, Yuma, Arizona

    Notice e4a5de77160b4460b7f9514d36f28946 on SAM.gov

  3. 3
    Version 3SolicitationCurrent

    PRE-DEMOLITION SURVEY VARIOUS BUILDINGS Marine Corps Air Station in Yuma, Arizona

    Notice d163bbe08eee4f0cac774eb131a9a25e on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

W912DY26RA107

Archive Date

Jul 15, 2027

Office Address

REDSTONE ARSENAL, AL, 35898-0000