Notice ID: 453ccfe334c6480aafdb48329689947fAward NoticeAwarded
Y1BG--EHRM Infrastructure Upgrades Design-Build San Francisco, CA - Project # 662-20-700
Awarded on March 15, 2022. Full description on SAM.gov.
Awarded tounder 36C77622C0022 (source: SAM.gov award notice)• $30.1M
Overview
- Posted
- March 31, 2022
- Notice type
- Award Notice
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of Veterans Affairs
Notice details
- Place of performance
- San Francisco VA Medical Center 4150 Clement St, San Francisco, 94121
- Last updated
- Dec 4, 2025
- Award date
- Mar 15, 2022
- Award amount (SAM.gov award notice)
- $30.1M
Identifiers
- Solicitation number
- 36C77621R0105
- Notice ID
- 453ccfe334c6480aafdb48329689947f
- Award number (PIID)
- 36C77622C0022
Description
Page 1 of 1 INTRODUCTION: The Department of Veterans Affairs (VA), Veterans Health Administration (VHA), Program Contracting Activity Central (PCAC) anticipates soliciting proposals and subsequently awarding a single Firm-Fixed-Price contract for the Design-Build VISN 21 EHRM Infrastructure Upgrades project at the San Francisco VA Medical Center (SFVAMC) located at 4150 Clement St, San Francisco, CA 94121. PROJECT DESCRIPTION: Contractor shall provide all labor, materials, tools and equipment, and services necessary for design, pre-construction, construction, and closeout of the project. The project includes either the relocation or remodel of approximately 50 existing telecommunications rooms (TRs) and 1 data center to bring them up to the Electronic Health Records Modernization (EHRM) IT standards while IT services remain operational. The DB shall provide a turn-key project for these rooms in accordance with VA Office of Information and Technology (OIT) and EHRM infrastructure standards. ADMINISTRATIVE: The solicitation will be issued as a Request For Proposal (RFP) conducted in accordance with FAR Part 36.3 Two-Phase Design-Build Selection Procedures and will be evaluated in accordance with the procedures listed in the solicitation. The solicitation will be advertised as a total Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. Offers received from other than SDVOSB concerns will not be considered. The applicable North American Industry Classification System (NAICS) code is 236220 with a size standard of $39.5 million. The solicitation will be issued in early to mid-July of 2021. The period of performance is approximately 540 calendar days from the issuance of the Notice to Proceed. In accordance with VAAR 836.204, the magnitude of construction is between $10,000,000 and $20,000,000. This notice is not a request for competitive offers. All questions must be submitted in writing to the issuing office via email to: jamahel.fayall@va.gov. Telephone calls will not be accepted. -END-
Award Overview
Award Number
36C77622C0022
Award Amount (SAM.gov award notice)
$30.1M
Award Date
Mar 15, 2022
Awardee
Awardee UEI
N6F2MJSH4WM8
Awardee CAGE Code
4TJX4
Original Solicitation
Notice ID: 453ccfe334c6480aafdb48329689947f
Posted Date: Mar 31, 2022
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $409.3KSigned Oct 23, 2026
- $7.5MSigned Oct 21, 2026
- $53.8KSigned Oct 19, 2026
- $7.1MSigned Sep 11, 2026
- $73.9KSigned Sep 11, 2026
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
36C77621R0105- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- Pre-SolicitationJun 21, 2021
Y1BG--EHRM Infrastructure Upgrades Design-Build San Francisco, CA - Project # 662-20-700
- 4×SolicitationAug 12, 2021
Y1BG--EHRM Infrastructure Upgrades Design-Build San Francisco, CA - Project # 662-20-700
- AwardedCurrentMar 31, 2022
Y1BG--EHRM Infrastructure Upgrades Design-Build San Francisco, CA - Project # 662-20-700
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Lyons EHRM Infrastructure Upgrades Construction | 93% | Solicitation | 03/18/2026 |
Amendment 0007 has been posted. This amendment responds to RFIs, updates Attachment 9, provides Addendum 1, and extends the date for receipt of offers. The update to Attachment 9 corrects the incorrect solicitation number and location in the header. The new date and time for receipt of offers is 8/17 at 3PM EDT. Specifications and drawings found in Addendum 1 dated 8-6-26 replace the corresponding specification section or drawing in the original package. Amendment 0006 has been posted. This amendment extends the date for offers due to 8/14 at 3PM EDT. Amendment 0005 has been posted. This amendment extends the date for offers due to 8/7 at 3PM EDT. It also adds FAR clause 52.212-4 and removes FAR clauses 52.249-2 and FAR 52.249-10. Amendment 0004 has been posted. This amendment extends the date for offers due to 7/27 at 3PM EDT. Amendment 0003 has been posted. This amendment extends the date for offers due to 7/13 at 3PM EDT. Amendment 0002 has been posted. This amendment extends the date for offers due to 7/1 at 3PM EDT. Amendment 0001 has been posted along with its attachments. This amendment adds the site visit sign-in sheet and agenda from the site visit on 6/9. The contractor shall provide all tools, equipment, materials, labor, supervision, and management to complete the construction of infrastructure upgrades to the campus. Construction practices shall comply with all VA solicitation drawings and specifications, VA regulations, procedures, and conditions for work at the medical center and any applicable codes as per requirements of all governing agencies. Work includes, but is not limited to, electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building Management System interfaces, asses for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes, cable), Renovation Datacenter work (HVAC, UPS, Power distribution, cable management, expansion of space, fire suppression, finishes), communication infrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, provide diversified path for wide area network connection, hazardous material abatement. Project buildings include: Buildings 47, 62, 14, 15, 9, 7, 6, 5, 4, 3, 2, 73, 70, 11, 12 and site. Contractor shall complete the intent of project 637-22-700 in strict accordance with the drawings and specifications. All work not specifically identified by the drawings and/or specifications but necessary for a complete system shall be included as if specifically identified in the Contract Documents. | 80% | Solicitation | 08/17/2026 |
Project 619-21-106 - EHRM Infrastructure Upgrades - Construction - Montgomery VAMC located in Montgomery, AL | 79% | Solicitation | 01/05/2027 |
Amendment 0007 has been posted. Amendment 0007 extends the date for receipt of offers. The new date for receipt of offers is 10/14 at 3PM EDT. Amendment 0007 also provides an update to RFIS and a new basis of design for HVAC units. Amendment 0006 has been posted. Amendment 0006 extends the date for receipt of offers. The new date for receipt of offers is 10/9 at 3PM EDT. Amendment 0006 also excludes the draft schedule from the page limit for Technical Volume I and provides responses to technical questions. Amendment 0005 has been posted. Amendment 0005 extends the date for receipt of offers. The new date for receipt of offers is 10/2 at 3PM EDT. Amendment 0004 has been posted. Amendment 0004 extends the date for receipt of offers. The new date for receipt of offers is 9/18 at 3PM EDT. Amendment 0003 has been posted. Amendment 0003 provides the site visit sign-in sheet and agenda from the 8/20 site visit. Amendment 0002 has been posted. Amendment 0002 provides an updated Attachment 11 - Site Visit Details which includes a campus map. Amendment 0001 has been posted. Amendment 0001 Provides updated Volume 2 drawings and renumbers attachments. The scope of this project includes, but is not limited to the following infrastructure improvements: Electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes) cabling and rack/cabinet work for Data Center (relocation of racks/cabinets, cable management), communication infrastructure (new data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, provide diversified path for wide area network connection, hazardous material abatement. Project building locations include: Buildings 1, 2, 3, 4, 5, 6, 7, 8, 9, 13, 14, 15, 16, 45, 46, 49, 136, 142, 147, 171, Jennings M.H. CBOC, and the Fort Polk CBOC. The Jennings CBOC, Lafayette CBOC, Lafayette Campus B CBOC, and the Natchitoches CBOC are also included in the scope. | 79% | Solicitation | 10/14/2026 |
EHRM Infrastructure Upgrades - Construction - Montgomery VA Medical Center | 79% | Pre-Solicitation | Open |
Additional Details
Solicitation Number
36C77621R0105
Archive Date
May 30, 2022
Office Address
INDEPENDENCE, OH, 44131