Notice ID: 96a7e8836be24479aa555b0a3c0dc574SolicitationArchived
SUMMIT VIEW WATER SYSTEM PIPE REPLACEMENT
Archived on August 14, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM MDT
- Posted
- July 29, 2026
- Notice type
- Solicitation
- NAICS
- 237110: Water and Sewer Line and Related Structures Construction
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- White River National Forest
- Place of performance
- Thompson, Utah, 84540
- PSC
- Y1NE: CONSTRUCTION OF WATER SUPPLY FACILITIES
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 1240LT26Q0136
- Notice ID
- 96a7e8836be24479aa555b0a3c0dc574
Description
Rev. 1 7/29/2026 - Documents Revised C04_1240LT26Q0136_RFQ C04b_Specifications *All revisions consist of administrative wording only and have no impact on the terms or timelines. Summit View Water System Replacement Montpelier Ranger District of the Caribou-Targhee National Forest Bear Lake County, Idaho Posting: 7/20/2026 Site Visit: Contact COR for Access Q&A Due Date: 07/27/2026 Quotes Due Date: 07/30/2026 Anticipated Award Date: 08/05/2026 This project includes the replacement of waterline originating at Thompson Spring and servicing the Summit View Campground to be preformed IAW documentation and specifications attached. The work includes removing and replacing approximately 1770 feet of waterline, from the sheep trough T to the iodinator. Replacement includes 2” minimum diameter HDPE waterline, pipe zone bedding, utility locating system, an air release valve, drains, and backflow preventer, along with incidentals like heat fusion joints and trenching. Quantities associated with these options are identified in the Schedule of Items. The project is located on the Montpelier Ranger District of the Caribou-Targhee National Forest, Bear Lake County, Idaho, in Section 15, T 10 S, R 44 E. It is located approximately 20 miles North of Montpelier, Idaho. The project may be accessed from State Highway 30 and Left-Hand Georgetown Canyon Road (42.5528° N, 111.2957° W). Firm Fixed Price Contract Price Range $40,000.00k - $60,000.00 Questions should be directed to the COR: Mary Jenkins mary.jenkins@usda.gov
Award Overview
Contacts
Contracting Officer
Primary Contact
Lonnie D Root, Contracting Officer
Secondary Contact
Mary Jenkins
Documents
Files (7)
- Download
C04_1240LT26Q0136_RFQ.pdf
1.5 MBAdded in Solicitation version 3Posted - Download
C04b_Specifications.pdf
510 KBAdded in Solicitation version 3Posted - Download
C04c_Drawings Summit Complete Package Signatures.pdf
8.0 MBAdded in Solicitation version 1Posted - Download
C04e - Experience Questionnaire.pdf
189 KBAdded in Solicitation version 1Posted - Download
C04f - Past Performance Data Sheet.pdf
76 KBAdded in Solicitation version 1Posted - Download
C04d_SAM_Wage Determination_ID20260021 051820.pdf
41 KBAdded in Solicitation version 1Posted - Download
C04a_Schedule of Items.xlsx
12 KBAdded in Solicitation version 1Posted
Lifecycle
- 1Version 1SolicitationArchived
SUMMIT VIEW WATER SYSTEM PIPE REPLACEMENT
- 3Version 3SolicitationArchivedCurrent
SUMMIT VIEW WATER SYSTEM PIPE REPLACEMENT
Similar Opportunities
Additional Details
Solicitation Number
1240LT26Q0136
Archive Date
Aug 14, 2026
Office Address
GLENWOOD SPRINGS, CO, 81601