GovChime
Notice ID: f6b3e9624f8747e789978eca80c87217Combined Synopsis/Solicitation

ELECTRICAL COMPONENTS FOR POWER UPGRADE

Archived on February 27, 2026. Combined Synopsis/Solicitation posted by ENERGY, DEPARTMENT OF on January 30, 2026. Solicitation 378240.

NAICS 423610 (Electrical Apparatus and Equipment, Wiring Supplies, and Related Equipment Merchant Wholesalers). Set-aside: No Set aside used. Place of performance: Batavia, Illinois. Original response deadline: . Full description on SAM.gov.

Description

Request for Quote | brand name or items equal to

Fermi Forward Discovery Group (FFDG) has a requirement for electrical panel board, circuit breaker, and motor starter

NAICS Code for this procurement is 423610, 423690, 423840

Fermi Research Alliance, LLC Strategic Commercial Purchasing located in Batavia, Illinois is issuing a Request for Quote (RFQ) for a commercial, single award contract. This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with the format in FAR subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation will not be issued.

Fermi Research Alliance, LLC intends to award Firm Fixed Price (FFP) contract. This is an all-or-non requirement, and the government will award a single purchase order to the offeror responsible whose offer conforms to the requirements as stated in the solicitation and is most advantageous to the Government based on the criteria listed within this solicitation.

  1. ELECTRICAL PANEL BOARD (See separate document for specifications)
  2. CIRCUIT BREAKER (See separate document for specifications)
  3. MOTOR STARTER (See separate document for specifications)

    Target date needed 26 Mar 2026

Oral communications are not acceptable in response to this notice.

Interested organizations may submit their capabilities and qualifications to perform the effort in writing to the identified point of contact no later than 4:00 p.m. Central Standard Time on  02/12/2026. Such capabilities /qualifications will be evaluated solely for the purpose of determining whether to conduct this procurement on a competitive basis. A determination by the Government not to compete this proposed effort on full and open competition basis, based upon responses to this notice, is solely with the discretion of the government.

The following terms and conditions shall become a part of any subsequent purchase order/subcontract resulting from this RFP.

  • FRA General Terms and Conditions for Commercial Products and Commercial Services (8/2025)

The above referenced terms and conditions are available on the Fermilab Business Services Web Site.  They are PDF Format and can be accessed at the following URL: 

https://procurement.fnal.gov/terms-conditions/

FERMI Strategic Commercial Purchasing will be the procuring center for this effort. All equipment and or services are to be delivered F.O.B. Fermi National Accelerator Laboratory (Fermilab), Batavia, IL 60510, Freight prepaid (delivered).

The following Representations must be completed and returned with your proposal.

  • SARC – Subcontractor Annual Reps & Certs
  • PUR-466 – Proposal Certifications

The RFP response shall include a completed RFP page include a price, with a completed SARC and PUR-466.

All contractual questions shall be directed to:

Cathleen E. Stadler

Procurement Specialist

630-840-2763

 cstadler@fnal.gov

Full description on SAM.gov

Overview

Agency:
Department of Energy
Office:FERMILAB - DOE CONTRACTOR
Posted:January 30, 2026
NAICS:423610: Electrical Apparatus and Equipment, Wiring Supplies, and Related Equipment Merchant Wholesalers
Last Updated:Aug 21, 2026
PSC:6110: ELECTRICAL CONTROL EQUIPMENT
Response Deadline:
Set-Aside:No Set aside used
Type:Combined Synopsis/Solicitation
Place of Performance:Batavia, Illinois, 60510

Award Overview

Possible prior contracts

Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).

Contacts

Contracting Officer

Primary Contact

Documents

Select documents to download

Showing 4 of 4 items

Document
Source
Agency
Posted Date
File Size
Actions
Combined Synopsis/SolicitationENERGY, DEPARTMENT OFJan 30, 2026210.97 KB
Combined Synopsis/SolicitationENERGY, DEPARTMENT OFJan 30, 2026362.33 KB
Combined Synopsis/SolicitationENERGY, DEPARTMENT OFJan 30, 2026193.78 KB
Combined Synopsis/SolicitationENERGY, DEPARTMENT OFJan 30, 2026364.17 KB

Lifecycle

Solicitation:378240
  1. Combined Synopsis
  1. Combined SynopsisCurrentJan 30, 2026

    ELECTRICAL COMPONENTS FOR POWER UPGRADE

    Notice f6b3e9624f8747e789978eca80c87217 on SAM.gov

Similar Opportunities

Title
Phase
Agency
NAICS
Set Aside
Posted
Deadline
Location
The Mu2e production target design effort requires a thermographic video camera for prototype thermal test monitoring at a high level of accuracy and detail to validate target performance and guarantee particle production yield for timely completion of the experiment. This specification covers the minimum requirements for a camera that meets the needs of the test series and project.
Combined Synopsis423410No Set-Aside10/01/202610/19/2026-
Army Contracting Command - Rock Island Arsenal (ACC-RIA) hereby issues Solicitation W519TC-26-Q-A219 for Multi-Tasking Machines in support of Rock Island Arsenal- Joint Manufacturing and Technology Center. This solicitation will result in a single firm-fixed price contract. This solicitation is issued in accordance with (IAW) Revolutionary Federal Acquisition Regulation Overhaul(RFO) Part 12 (Acquisition of Commercial Products and Commercial Services) and RFO FAR Part 15 (Contracting by Negotiation). This solicitation will be awarded to the lowest priced technically acceptable offeror. Multi-Tasking Machine specifications and procedures shall be in accordance with Attachment 0001 - RIPD.
Combined Synopsis423830No Set-Aside09/16/202610/14/2026Rock Island, IL
UChicago Argonne, LLC, operator of Argonne National Laboratory under a prime contract with the U.S. Department of Energy (DOE), has responsibility for acquiring the supplies and services that are the subject of this Request for Proposal (RFP), consisting of an artificial intelligence computing system and associated software/licensing, installation, and maintenance and support services. Offerors are invited to submit proposals in accordance with the solicitation requirements. UPDATE (09/28/2026): Please kindly note that additional documentation has been included to amend this solicitation: 1. Addendum No. 1 to RFP #6-B143-P-00251-00 UPDATE (10/12/2026): Please kindly note that additional documentation has been included to amend this solicitation: 1. Addendum No. 2 to RFP #6-B143-P-00251-00
Solicitation334111No Set-Aside10/12/202610/16/2026-
This scope of work includes fabricating and installing a Low Conductivity Water (LCW) Piping System in the F-37 Pump Room. PLEASE NOTE the important information related to this RFP: Pre-Proposal Meeting and Site Visit: Ocotber 27, 10:00a CDT Last Day for Questions: November 5, 2026, 4:00p CDT PROPOSALS DUE: November 19, 2026, 2:00p CDT To attend the Pre-Proposal Meeting and Site Visit, PPE is required. As Fermilab is a federal facility, to access the Fermilab site, offerors MUST complete an Access Request form AT LEAST SEVEN (7) DAYS IN ADVANCE OF THE MEETING. AS THIS IS A SECURED DOE SITE, FNAL IS UNABLE TO PROCESS ACCESS REQUESTS THAT ARE NOT RECEIVED 7 DAYS PRIOR TO THE PRE-SOLICITATION CONFERENCE. Additionally, to obtain on-site access approval, attendees must be a U.S. Citizen and have a REAL ID. Please note that when entering Fermilab: All vehicles are subject to search No weapons, firearms, or ammunition (regardless of concealed carry permit) are allowed on-site. No explosives or any other apparatus or material hazardous to the public or property are allowed on site. No possession or illegal use of controlled substances or intoxicants, or being under their influence, is allowable. No personal alcohol or marijuana No Smoking or vaping within buildings and within 15-25 feet of entrances Illinois Rules of the Road are to be followed while driving on Fermilab’s premises.
Solicitation238220No Set-Aside10/08/202611/19/2026Batavia, IL
On October 7, 2026, Amendment No. 2 was issued to correct badge access link provided in Amendment No. 1. On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits. This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 3rd January 2028; This milestone marks the point where construction work may begin. Milestone 3 – 31st January 2029; AUP 1 CUB Extension complete. Milestone 4 – 29th June 2029; AUP 2 Existing CUB Upgrade complete. Milestone 5 – 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.
Solicitation236210No Set-Aside10/07/202611/17/2026Batavia, IL

Additional Details

Solicitation Number

378240

Archive Date

Feb 27, 2026

Office Address

Batavia, IL, 60510