Low-Voltage Switchgear with Integrated ATS
Archived on September 2, 2026. Solicitation posted by ENERGY, DEPARTMENT OF on August 12, 2026. Solicitation 383921kmb.
NAICS 335313 (Switchgear and Switchboard Apparatus Manufacturing). Place of performance: Batavia, Illinois. Original response deadline: . Full description on SAM.gov.
Description
**This posting has been amended. Please see attached Amendment 01 to Fermilab RFP 383921kmb. Please review the Amendment fully, as it provides clarification to the technical specification.**
Fermilab is seeking to procure low-voltage switchgear with integrated ATS. Please see attached Fermilab RFP 383921kmb and associated documentation. Please review the RFP document fully, as it outlines how to submit a complete proposal package.
Important information related to this RFP:
- Proposal Due Date: 5:00 PM CT, Tuesday, August 18, 2026
- Proposals must be submitted with a completed SARC (if not completed within the last year), PUR-466, and Questionnaire – 383921kmb
Overview
Award Overview
Possible prior contracts
Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).
Contacts
Contracting Officer
Primary Contact
Documents
Showing 6 of 6 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Solicitation | ENERGY, DEPARTMENT OF | Aug 12, 2026 | 391.87 KB | |||
| Solicitation | ENERGY, DEPARTMENT OF | Aug 12, 2026 | 468.83 KB | |||
| Solicitation | ENERGY, DEPARTMENT OF | Aug 12, 2026 | 10.65 MB | |||
| Solicitation | ENERGY, DEPARTMENT OF | Aug 12, 2026 | 475.79 KB | |||
| Solicitation | ENERGY, DEPARTMENT OF | Aug 12, 2026 | 38.03 KB | |||
| Solicitation | ENERGY, DEPARTMENT OF | Aug 12, 2026 | 259.8 KB |
Lifecycle
383921kmb- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 2×SolicitationCurrentAug 3, 2026
Low-Voltage Switchgear with Integrated ATS
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
Removal and replacment of six (6) existing full-duplex switchboard sections at SWPA’s New Madrid Substation with seven (7) new contractor-supplied sections. | Combined Synopsis | 335313 | No Set-Aside | 09/28/2026 | 10/05/2026 | - | |
Removal and replacment of six (6) existing full-duplex switchboard sections at SWPA’s New Madrid Substation with seven (7) new contractor-supplied sections. | Combined Synopsis | 335313 | No Set-Aside | 09/04/2026 | 10/05/2026 | - | |
PLEASE REVIEW THE BELOW NSN AND PROVIDE US WITH ANY SOURCES THAT ARE ABLE TO MANUFACTURE THE ITEM. PLEASE ALSO PROVIDE THE LOCATION (CITY AND STATE) OF THE MANUFACTURER AND POINTS OF CONTACT. PLEASE PROVIDE THIS TO Steven Oliver at steven.oliver@dla.mil. NSN: 6110012663542; Part Number: L5306354-041 THIS SOURCES SOUGHT IS FOR INFORMATIONAL PURPOSES ONLY. THIS IS NOT A REQUEST FOR A PROPOSAL. IT DOES NOT CONSTITUTE A SOLICITAITON AND SHALL NOT BE CONSTRUED AS A COMMITMENT BY THE GOVERNMENT. RESPONSES IN ANY FORM ARE NOT OFFERS AND THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. NO FUNDS ARE AVAILABLE TO PAY FOR PREPARATION OF RESPONSES TO THIS ANNOUNCEMENT. ANY INFORMATION SUBMITTED BY RESPONDENTS TO THIS TECHNICAL DESCRIPTION IS STRICTLY VOLUNTARY. | Market Research | 335313 | No Set-Aside | 10/05/2026 | 10/10/2026 | Richmond, VA | |
Fermi National Accelerator Laboratory (Fermilab or FNAL), managed and operated by Fermi Forward Discovery Group, LLC (FFDG) under a prime contract with the U.S. Department of Energy (DOE), is seeking to subcontract for work aligned with its mission objectives. The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab’s accelerator complex to enable the world’s most intense high-energy beam of neutrinos for the international Deep Underground Neutrino Experiment at LBNF and a broad physics program, powering discoveries for many decades to come. In support of this project, FNAL requires the design, manufacture, testing, documentation, and delivery of Booster GMPS Power Supply Girder Trimming Capacitors in accordance with the requirements of this specification, as identified herein. | Solicitation | 335999 | No Set-Aside | 10/02/2026 | 10/29/2026 | Batavia, IL | |
| Sole Source / J&A | 335313 | No Set-Aside | 10/02/2026 | Open | Vicksburg, MS |
Additional Details
Solicitation Number
383921kmb
Archive Date
Sep 2, 2026
Office Address
Batavia, IL, 60510