GovChime
Notice ID: f2b4a35d8dd14641af95902121ae5e59Award NoticeAwardedArchived

Z--BADL REHAB PROPANE DISTRIBUTION LINES

Awarded on April 10, 2026. Full description on SAM.gov.

Awarded tounder 140P6326C0001 (source: SAM.gov award notice)• $346.0K

Overview

Posted
April 10, 2026
Notice type
Award Notice
NAICS
237120: Oil and Gas Pipeline and Related Structures Construction
Agency
Department of the InteriorNATIONAL PARK SERVICE

Notice details

Office
MWR NEKOTA(63000)
Place of performance
Interior, South Dakota
Last updated
Nov 1, 2026
First published
Last updated on SAM.gov
Award date
Apr 10, 2026
Award amount (SAM.gov award notice)
$346.0K

Identifiers

Solicitation number
140P6326B0003
Notice ID
f2b4a35d8dd14641af95902121ae5e59
Award number (PIID)
140P6326C0001

Description

This contract is for construction services to rehab propane distribution lines at Badlands National Park.

Full description on SAM.gov

Award Overview

Award Number

140P6326C0001

Award Amount (SAM.gov award notice)

$346.0K

Award Date

Apr 10, 2026

Awardee

Awardee UEI

FHNCUMP16GP5

Awardee CAGE Code

6TZY6

Awardee Address

21617 US HWY 18, Martin, SD 57551, UNITED STATES

Original Solicitation

Notice ID: f2b4a35d8dd14641af95902121ae5e59

Posted Date: Apr 10, 2026

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Documents

Files (9)

  • Sol_140P6326B0003_Amd_0002.pdf

    201 KBAdded in Solicitation version 8Posted
    Download
  • B09_Solicitation_Amendment_2_attach_1_Questions_and_Answers__0002.pdf

    145 KBAdded in Solicitation version 8Posted
    Download
  • Sol_140P6326B0003_Amd_0001.pdf

    201 KBAdded in Solicitation version 5Posted
    Download
  • Sol_140P6326B0003.pdf

    617 KBAdded in Solicitation version 2Posted
    Download
  • B08_Solicitation_attach_1_SPECS.pdf

    1.2 MBAdded in Solicitation version 2Posted
    Download
  • B08_Solicitation_attach_2_Drawings.pdf

    12 MBAdded in Solicitation version 2Posted
    Download
  • B08_Solicitation_attach_3_submittal_list.pdf

    46 KBAdded in Solicitation version 2Posted
    Download
  • B08_Solicitation_attach_4_WD.PDF

    55 KBAdded in Solicitation version 2Posted
    Download
  • B08_Solicitation_attach_5_Limitations_on_Subcontracting_Report.xlsx

    158 KBAdded in Solicitation version 2Posted
    Download

Lifecycle

  1. 3
    Version 3SolicitationArchived

    Z--BADL REHAB PROPANE DISTRIBUTION LINES

    Notice 396535f6022741c5899b2e2d824c89ee on SAM.gov

  2. 5
    Version 5Award NoticeArchivedCurrent

    Type changed from Solicitation to Award Notice

    Z--BADL REHAB PROPANE DISTRIBUTION LINES

    Notice f2b4a35d8dd14641af95902121ae5e59 on SAM.gov

Other notices for this solicitation

  1. Market ResearchRelated noticeJan 28, 2026

    Z--BADL REHAB PROPANE DISTRIBUTION LINES

    Notice c314399f73644604a04f9fbff5ae9b29 on SAM.gov

  2. Pre-SolicitationRelated noticeFeb 5, 2026

    Z--BADL REHAB PROPANE DISTRIBUTION LINES

    Notice f76ceba61f644c0ebf6feb8bdbb528e9 on SAM.gov

  3. SolicitationRelated noticeFeb 25, 2026

    BADL REHAB PROPANE DISTRIBUTION LINES

    Notice 49d56ffcc9c549ef8a4e5533b1881d1b on SAM.gov

  4. SolicitationRelated noticeMar 20, 2026

    Z--BADL REHAB PROPANE DISTRIBUTION LINES

    Notice 5731b56b00a44efab742d97e4461c6e6 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
ID-CAMAS NWR- Fuel Tanks Wiring
-Solicitation10/08/2026
Description This is a solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. Solicitation number 75110PR270000104 is issued as a request for quotation (RFQ) for gas-leak detection and repair, gas-valve installation, gravel backfill, asphalt patching, and site cleanup at Birmingham Southern College in Birmingham, Alabama. This acquisition is set aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2026-01 Effective Date 03/13/2026. The associated North American Industrial Classification System (NAICS) code for this procurement is 237120, with a small business size standard of $45.0M. Product Service Code is Z2NA. Submission of offers. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. As a minimum, offers shall include— (1) The solicitation number. (2) The name, address, telephone number of the Offeror. (3) The Offeror’s Unique Entity Identifier (UEI) (4) Information necessary to evaluate the factors contained in the provision at 52.212-2 (5) Responses to provisions that require Offeror completion of information, representations, and certifications (other than those collected via the System for Award Management (SAM)); and (6) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and any solicitation amendments. Period for acceptance of offers. The Offeror agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation. The Coast Guard Training Center Birmingham Southern is seeking to purchase gas-leak repair services, including excavation, gas-line repair, gas-valve installation, testing, gravel backfill, asphalt patching, and site cleanup. All interested companies must provide quotation(s) for the following services: CLIN 0001 — Gas Leak Detection, Excavation, Spoil Removal, and Gravel Backfill. The Contractor shall locate the gas leak, saw-cut and excavate the parking lot as needed, use required safety measures, remove and dispose of excavated material and debris, and place and compact clean gravel or approved backfill after repair and testing. The expected excavation area is about 6 feet by 6 feet and up to 6 feet deep. The Government will provide utility markings before excavation; however, the Contractor remains responsible for safe digging. This CLIN is associated with SOW Task 2.1, SOW Task 2.3, and SOW Section 5.0. CLIN 0002 — Gas-Line Repair, Valve Installation, Testing, and Test Record. The Contractor shall provide all labor, materials, equipment, pipe, fittings, connectors, one new gas shutoff valve, and testing needed to repair the identified gas leak. The Contractor shall test the repaired gas line and valve before backfill and provide a written test record to the GTR and Contracting Officer. The Contractor shall not restart gas service until testing is successful and any required gas-utility approval is received. This CLIN is associated with SOW Task 2.2. CLIN 0003 — Asphalt Repair. After the gas-line repair, testing, and backfill are complete, the Contractor shall prepare the base and install an asphalt patch. The patch shall match the existing pavement as closely as practical, be properly compacted and level with the surrounding surface, and be safe for normal parking-lot traffic. The Contractor shall seal edges and joints as needed. This CLIN is associated with SOW Task 2.3. CLIN 0004 — Site Cleanup and Demobilization. The Contractor shall remove all debris, spoils, excess materials, equipment, signs, barriers, and temporary items from the work area. The Contractor shall leave the site clean, orderly, and safe for normal use. This CLIN is associated with SOW Task 2.4. Reference Attached Statement of Work in Solicitation 75110PR270000104 The period of performance for this firm-fixed-price contract must not exceed ten (10) business days from the date of award. All work, including final cleanup and demobilization, must be completed within this period Place of Performance The primary place of performance is the parking lot at Coast Guard Training Center Birmingham Southern, 900 Arkadelphia Road, Birmingham, AL 35204. 52.237-1 Site Visti (Apr 1984) To facilitate this process, an organized site visit has been scheduled for November 5, 2026, at 10:00am cst. Participants are requested to assemble at Training Center Birmingham main gate. Please note that all visitors must provide the following information prior to scheduling a site visit: full legal name, date of birth, contact number, email address, Real Id Driver’s License, registration of vehicle and proof of insurance. No personnel with felony convictions are permitted to access Coast Guard facilities under any circumstance. All vendors interested in attending a site visit shall submit their request and information by sending an email to john.h.caicedo2@uscg.mil with the following information: 1: Company Name 2. Company Phone 3: Visitor Name 4: Last 4 of SSN: 5: Date of Birth: 6: Place of Birth: 7: Real Id Driver’s License Number:
-Solicitation11/12/2026
The 375th Contracting Squadron is performing Market Research to identify potential SBA-certified Women-Owned Small Businesses (WOSB) under NAICS 237120 (Oil and Gas Pipeline and Related Structures Construction) with the qualifications, licenses, and technical capabilities to perform electrical conduit repair, drop tube replacement, and overfill alarm installation across designated fueling facilities at Scott Air Force Base, IL. Please contact MSgt Nolan Strange, nolan.strange.1@us.af.mil or Mr. Jody Noram, jody.noram.1@us.af.mil if you have any questions or concerns. DISCLAIMER: This Sources Sought is issued solely for information and planning purposes. It does not constitute a Request for Proposal (RFP), Invitation for Bid (IFB), or Request for Quotation (RFQ), nor does it guarantee a future solicitation will be issued. The Government will not reimburse respondents for any costs associated with preparing or submitting information in response to this notice. 3. Capability Statement Submittal Requirements Interested vendors possessing the required expertise, equipment, and certified personnel are invited to submit a Capabilities Statement (maximum 5 pages) addressing the following: Company Information: Company name, address, SAM Unique Entity Identifier (UEI), CAGE Code, Point of Contact (name, email, phone), and Socioeconomic status (e.g., 8(a), SDVOSB, WOSB, HUBZone, Small Business). Technical Capabilities & Experience: Summary of relevant past performance completed within the last three (3) years on underground storage tank (UST) fueling systems, conduit breakout/pour-back, overfill drop tube replacements, and Veeder-Root or automatic tank gauge (ATG) sensor/alarm installations. Licensing & Certifications: Confirmation that personnel hold required state/local UST service technician certifications, Veeder-Root certified installer/technician credentials, and applicable electrical licensing. Rough Order of Magnitude (ROM): Optional feedback on typical lead times, mobilization timeframes, and commercial pricing structure for tasks of this nature. PART 2: STATEMENT OF WORK (SOW) 1.0 Objective & Overview The Contractor shall furnish all necessary labor, supervision, materials, tools, equipment, testing apparatus, and transportation (except for specified Government/Owner-Furnished Equipment) to perform concrete breakout and conduit correction, electrical re-wiring, drop tube replacement, and overfill alarm installation across designated fueling facilities. 2.0 Detailed Scope of Work by Facility and Task TASK AREA 1: Premium Tank Sump Conduit Repair & Electrical Remediation The Contractor shall repair incorrectly poured conduit serving the Premium tank sump, complete necessary electrical re-pulls, and restore the concrete pad to original structural grade. Demolition & Concrete Breakout: Precision sawcut and breakout existing concrete around the Premium tank sump to expose the buried conduit line. Protect adjacent sump structures, lid seats, and underground utilities from collateral damage during breakout operations. Conduit Clearing & Realignment: Cut apart the obstructed/incorrect conduit run and clear out concrete or foreign debris resulting from the prior incorrect pour. Reconnect the conduit run using code-compliant, liquid-tight, fuel-resistant fittings and conduit rated for Class I, Division 1/2 hazardous fuel environments. Ensure proper pitch, sealing, and alignment. Electrical Wiring & Terminations: Pull new electrical conductors/wiring from the main building panel/control area to the tank sub-unit junction box in accordance with the National Electrical Code (NEC/NFPA 70). Terminate all wiring connections, verify seal-offs, and conduct comprehensive continuity, insulation resistance (megger), and operational tests to ensure proper equipment operation. Civil Restoration: Backfill excavated trench using suitable aggregate, compacted in uniform lifts to match surrounding base compaction specifications. Form and pour back high-early-strength concrete to match the existing grade, thickness, and finish of the fueling apron. TASK AREA 2: Facility 6047806 – Tank 3 Drop Tube Replacement The Contractor shall remove obsolete fill hardware and install a compliant drop tube assembly on Tank 3. Hardware Removal & Disposal: Remove the existing fill adapter, fill cap, and drop tube assembly. Safely load, manifest (if required), transport, and legally dispose of all obsolete components off-site in compliance with all local, state, and federal environmental regulations. Furnish & Install New Hardware: Furnish and install one (1) new OPW overfill prevention drop tube (or Government-approved equal), one (1) new fill adapter, and one (1) new heavy-duty locking cap. Special Technical Condition: Work assumes the existing drop tube is removable without structural failure and the existing spill container (spill bucket) remains sound and reusable. If the drop tube is seized or the spill bucket is found to be compromised/damaged, the Contractor shall immediately notify the Contracting Officer Representative (COR). Any required replacement of seized components or spill containers shall be evaluated and authorized via a formal bilateral change order prior to proceeding. Regulatory Compliance Verification: Set and verify that the drop tube shutoff mechanism operates at the exact level mandated by 40 CFR Part 280 / state UST regulations (e.g., 95% tank capacity shutoff or 90% flow restriction). Deliverables & Documentation: Document pre-work conditions, intermediate installation stages, and final configuration with high-resolution digital photographs. Submit photos and completed compliance checklist with the final job completion paperwork. TASK AREA 3: Facility 6047801 – Overfill Alarm Installation The Contractor shall remove the existing overfill alarm and install owner-provided Veeder-Root monitoring hardware. Demolition: Disconnect and remove the existing overfill alarm unit; transport and dispose of all removed scrap components off-site. Installation of Government/Owner-Furnished Equipment (GFE/OFE): The Government/Owner will provide: One (1) Veeder-Root Overfill Alarm (Part # 790091-001 / SKU: 790091-001) One (1) Veeder-Root Universal Sensor Mounting Kit (Part # 330020-012 / SKU: 330020-012) The Contractor shall furnish all certified labor, wiring, hardware, seals, and incidental consumables to properly mount, wire, and integrate the alarm with the existing automatic tank gauge (ATG) system. Testing & Commissioning: Perform functional operational checkout of the Veeder-Root alarm and sensor assembly to verify positive alarm annunciation and correct signal communication to the console. Deliverables & Documentation: Take detailed digital photographs of the completed installation, wiring junction, and console status screen indicating an operational, alarm-free condition. Submit completion paperwork and test verification logs to the COR. 3.0 Site Cleanup, Waste Management & Housekeeping Debris Haul-Off: The Contractor shall continuously maintain a clean and safe work zone. Upon completion of each task, the Contractor shall collect, load, haul off, and legally dispose of all concrete rubble, excavated soils, cut conduit, old wiring, discarded drop tubes, and packaging debris. Hazardous Materials: Any fuel-wetted materials or petroleum rags generated during servicing shall be managed and disposed of in accordance with applicable RCRA and local environmental standards. 4.0 Submittals and Deliverables Deliverable Site Safety Plan & AHAs Activity Hazard Analysis for sawcutting, confined spaces, and hazardous fuel zones Technician Certifications Veeder-Root certified technician & state UST licenses With quote / proposal submittal Drop Tube Compliance Verification Documented drop tube shutoff height calculation and verification sheet Photo Documentation Package Clear digital photos showing before, during, and after conditions for all tasks Disposal Manifests/Receipts Proof of lawful disposal for concrete and metallic/fuel-wetted scrap 5.0 Safety, Code Compliance & Working Conditions Safety Regulations: All work shall comply with OSHA 29 CFR 1910 and 1926 standards, NFPA 30 (Flammable and Combustible Liquids Code), NFPA 30A (Motor Fuel Dispensing Facilities), and NFPA 70 (National Electrical Code). Hot Work & Hazardous Locations: Sump areas represent Class I, Division 1/2 environments. The Contractor shall implement atmospheric monitoring (LEL meters) and obtain all required hot work permits before operating saws, cutting tools, or electrical equipment near open sumps.
-Market Research10/30/2026
On or about 20 May 2026, Government intends to issue a solicitation for ?Grand Forks Fueling System Repair.? The solicitation will close on or about 15 June 2026. This solicitation will be 100% set-aside for Small Business.
-Pre-SolicitationOpen
14 July 2026: The purpose of Amendment 0001 is to extend the proposal due date, update documents, and incorporate missing documents into the solicitation.________________THE DOCUMENT NAMED: 26-R-A056-SPECS HAS BEEN UPDATED; PLEASE ENSURE YOU ARE USING THE CORRECT VERSION DATED APRIL 2026. The previous version dated October 2025 is not valid and has been removed. This project includes performing repairs to two aboveground horizontal bulk storage tanks and their associated equipment. These repairs include providing grounding systems, pipe supports, replacement nozzles, replacement normal vents, independent level alarms, mechanical clock-type level gauges, and automatic tank gauging systems.
-Solicitation07/28/2026

Additional Details

Solicitation Number

140P6326B0003

Archive Date

Apr 25, 2026

Office Address

Rapid City, SD, 57701