GovChime
Notice ID: d6ab1955392244cfa9bc62cab80281ffSolicitationCancelled on SAM.gov

WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

Cancelled on SAM.gov (notice posted December 16, 2025). Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM PDT
Posted
December 16, 2025
Notice type
Solicitation
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of TransportationFEDERAL HIGHWAY ADMINISTRATION

Notice details

Office
690567 WESTERN FEDERAL LANDS DIV
Place of performance
Yellowstone National Park, Wyoming
Last updated
Nov 6, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
69056724R000001
Notice ID
d6ab1955392244cfa9bc62cab80281ff

Description

Update 06/09/2025: Offer Summary Posted.

Update 06/04/2025: QA_06-04-2025.pdf posted to attachments.

Update 06/03/2025: QA_06-03-2025.pdf posted to attachments.

Update 05/30/2025: QA_05-30-2025.pdf posted to attachments.

Update 05/29/2025: Amendment A006 and QA_05-29-2025.pdf posted to attachments.

Update 05/28/2025: QA_05-28-2025_2.pdf posted to attachments.

Update 05/28/2025: Amendment A005 and QA_05-28-2025_1.pdf posted to attachments.

Update 05/27/2025: QA_05-27-2025_2.pdf posted to attachments.

Update 05/27/2025: Amemdment A004, QA_05-27-2025.pdf, and new physical data files (A004_yell10-24_XS_GOLDENGATE_LT Cut_86430 to 87425.pdf and A004_yell10-24_XS_GOLDENGATE_LT Cut_87767 to 88000.pdf) posted to attachments.

Update 05/23/2025: QA_05-23-2025_1.pdf posted to attachments.

Update 05/22/2025: Amendment A003, QA_05-22-2025.pdf, and new physical data file (A003_yell10-24_Earthwork_GOLDENGATE_859 to 889.pdf) posted to attachments.

Update 05/21/2025: Amendment A002, QA_05-21-2025.pdf, and new physical data file (A002_yell10-24_Phase 2 Erosion Control.pdf) posted to attachments.

Update 05/20/2025: QA_05-20-2025.pdf posted to attachments.

Update 05/19/2025: QA_05-19-2025.pdf posted to attachments.

Update 05/15/2025: Amendment A001 and QA_05-15-2025.pdf posted to attachments.

Update 05/14/2025: QA_05-14-2025.pdf posted to attachments.

Update 05/01/2025: QA_05-01-2025.pdf posted to attachments.

Project: WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

Solicitation No.: 69056724R000001

See attachments for Request for Proposal (RFP), plans, and phyiscal data files.

THIS “TASK ORDER REQUEST FOR PROPOSAL” IS SOLELY FOR THE FOLLOWING CONTRACTS AND CONTRACTORS:

  • H-K CONTRACTORS, INC
    • Contract Number: 69056724D000010
    • Phone: 208-523-6600
  • M.A. DEATLEY CONSTRUCTION, INC.
    • Contract Number: 69056724D000011
    • 509-751-1580
  • MISSOURI RIVER CONTRACTORS, LL
    • Contract Number: 69056724D000012
    • Phone: 406-443-2524
  • OFTEDAL CONSTRUCTION, INC
    • Contract Number: 69056724D000013
    • Phone: 406-232-5911
  • RIVERSIDE CONTRACTING INC
    • Contract Number: 69056724D000014
    • Phone: 406-721-9267
  • SUNDT CONSTRUCTION, INC.
    • Contract Number: 69056724D000015
    • Phone: 801-853-8070

THIS PROJECT IS BEING ADVERTISED ON SAM.GOV TO ANNOUNCE THE UPCOMING PROJECT AND ASSIST POTENTIAL SUBCONTRACTORS BY PUBLICIZING OPPORTUNITIES.  A PROPOSAL WILL ONLY BE ACCEPTED FROM THE ABOVE PRIME CONTRACTORS. 

This information is also available on our website:

https://highways.dot.gov/federal-lands/business/construction-contracting/yellowstone-grand-teton

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Contracts G. Office
Fax: 3606197932

Documents

Files (78)

  • OfferSum_WY NP YELL 10(24).pdf

    80 KBAdded in Solicitation version 21Posted
    Download
  • QA_06-04-2025.pdf

    164 KBAdded in Solicitation version 19Posted
    Download
  • QA_06-03-2025.pdf

    163 KBAdded in Solicitation version 18Posted
    Download
  • QA_05-30-2025.pdf

    161 KBAdded in Solicitation version 17Posted
    Download
  • Amendment A006.pdf

    1.7 MBAdded in Solicitation version 16Posted
    Download
  • QA_05-29-2025.pdf

    170 KBAdded in Solicitation version 16Posted
    Download
  • QA_05-28-2025_2.pdf

    153 KBAdded in Solicitation version 15Posted
    Download
  • Amendment A005.pdf

    269 KBAdded in Solicitation version 13Posted
    Download
  • QA_05-28-2025_1.pdf

    146 KBAdded in Solicitation version 13Posted
    Download
  • QA_05-27-2025_2.pdf

    146 KBAdded in Solicitation version 12Posted
    Download
  • Amendment A004.pdf

    5.6 MBAdded in Solicitation version 11Posted
    Download
  • QA_05-27-2025.pdf

    498 KBAdded in Solicitation version 11Posted
    Download
  • A004_yell10-24_XS_GOLDENGATE_LT Cut_86430 to 87425.pdf

    4.8 MBAdded in Solicitation version 11Posted
    Download
  • A004_yell10-24_XS_GOLDENGATE_LT Cut_87767 to 88000.pdf

    645 KBAdded in Solicitation version 11Posted
    Download
  • QA_05-23-2025_1.pdf

    101 KBAdded in Solicitation version 10Posted
    Download
  • Amendment A003.pdf

    4.1 MBAdded in Solicitation version 9Posted
    Download
  • QA_05-22-2025.pdf

    130 KBAdded in Solicitation version 9Posted
    Download
  • A003_yell10-24_Earthwork_GOLDENGATE_859 to 889.pdf

    473 KBAdded in Solicitation version 9Posted
    Download
  • Amendment A002.pdf

    4.5 MBAdded in Solicitation version 8Posted
    Download
  • QA_05-21-2025.pdf

    98 KBAdded in Solicitation version 8Posted
    Download
  • A002_yell10-24_Phase 2 Erosion Control.pdf

    3.7 MBAdded in Solicitation version 8Posted
    Download
  • QA_05-20-2025.pdf

    97 KBAdded in Solicitation version 7Posted
    Download
  • QA_05-19-2025.pdf

    62 KBAdded in Solicitation version 6Posted
    Download
  • Amendment A001.pdf

    838 KBAdded in Solicitation version 5Posted
    Download
  • QA_05-15-2025.pdf

    62 KBAdded in Solicitation version 5Posted
    Download
  • QA_05-14-2025.pdf

    61 KBAdded in Solicitation version 4Posted
    Download
  • QA_05-01-2025.pdf

    56 KBAdded in Solicitation version 3Posted
    Download
  • RFP_69056724R000001_WY NP YELL 10(24)_FINAL.pdf

    47 MBAdded in Solicitation version 2Posted
    Download
  • yell10-24_PLAN_(Set 1 of 2).pdf

    64 MBAdded in Solicitation version 2Posted
    Download
  • yell10-24_PLAN_(Set 2 of 2).pdf

    39 MBAdded in Solicitation version 2Posted
    Download
  • EPAcompiledSWPPP_NGG3_Pages 1 through 208.pdf

    61 MBAdded in Solicitation version 2Posted
    Download
  • EPAcompiledSWPPP_NGG3_Pages 209 through 250.pdf

    90 MBAdded in Solicitation version 2Posted
    Download
  • EPAcompiledSWPPP_NGG3_Pages 251 through 281.pdf

    11 MBAdded in Solicitation version 2Posted
    Download
  • EPAcompiledSWPPP_NGG3_Pages 282 through 1043.pdf

    4.0 MBAdded in Solicitation version 2Posted
    Download
  • EPAcompiledSWPPP_NGG3_Pages 1044 through 1137.pdf

    9.8 MBAdded in Solicitation version 2Posted
    Download
  • Geometry_Alignments.pdf

    198 KBAdded in Solicitation version 2Posted
    Download
  • Geometry_BioswaleCL.pdf

    130 KBAdded in Solicitation version 2Posted
    Download
  • Geometry_Edges of Curb (EC01-38).pdf

    444 KBAdded in Solicitation version 2Posted
    Download
  • Geometry_Grade Breaks (GB01-17).pdf

    348 KBAdded in Solicitation version 2Posted
    Download
  • Norris Geyser Basin_152.04(e)(2)(i)_Controlsheet.xlsx

    42 KBAdded in Solicitation version 2Posted
    Download
  • Superelevation_Entrance Road.pdf

    145 KBAdded in Solicitation version 2Posted
    Download
  • Traverse_Clearing Limits.pdf

    790 KBAdded in Solicitation version 2Posted
    Download
  • yell10-24_1570-001P - Golden Gate Viaduct Plans 1977.pdf

    43 MBAdded in Solicitation version 2Posted
    Download
  • yell10-24_1570-001P Golden Gate Bridge Safety Inspection - 2022.pdf

    3.4 MBAdded in Solicitation version 2Posted
    Download
  • yell10-24_AccessibilityInspectionReport_Form_2-14-19_v508.docx

    547 KBAdded in Solicitation version 2Posted
    Download
  • yell10-24_control-points.xlsx

    41 KBAdded in Solicitation version 2Posted
    Download
  • yell10-24_Earthwork_MAIN SCH A_Transition.pdf

    130 KBAdded in Solicitation version 2Posted
    Download
  • yell10-24_Earthwork_OPT Z_PED_1999-98 to 2005-80.pdf

    161 KBAdded in Solicitation version 2Posted
    Download
  • yell10-24_Earthwork_SCH A w OPT Z_MAIN_851-00 to 859-00.pdf

    229 KBAdded in Solicitation version 2Posted
    Download
  • yell10-24_Earthwork_SCH A without OPT Z_MAIN_851-00 to 859-00.pdf

    209 KBAdded in Solicitation version 2Posted
    Download
  • yell10-24_Earthwork_SCH A_DeepPatch.pdf

    117 KBAdded in Solicitation version 2Posted
    Download
  • yell10-24_Earthwork_SCH B_MAIN_822-20 to 851-00.pdf

    322 KBAdded in Solicitation version 2Posted
    Download
  • yell10-24_Earthwork_WATER01.pdf

    110 KBAdded in Solicitation version 2Posted
    Download
  • yell10-24_Earthwork_WATER02.pdf

    131 KBAdded in Solicitation version 2Posted
    Download
  • yell10-24_GR 03-24_Pages1-106.pdf

    8.3 MBAdded in Solicitation version 2Posted
    Download
  • yell10-24_GR 03-24_Pages107-503_AppxA-E.pdf

    55 MBAdded in Solicitation version 2Posted
    Download
  • yell10-24_GR 03-24_Pages504-End_OtherAppendices.pdf

    55 MBAdded in Solicitation version 2Posted
    Download
  • yell10-24_MAIN_SCH-A_Transition_HA Alignment.pdf

    151 KBAdded in Solicitation version 2Posted
    Download
  • yell10-24_MAIN_SCH-A_Transition_VA Alignment.pdf

    151 KBAdded in Solicitation version 2Posted
    Download
  • yell10-24_NGB_X-Sections.pdf

    6.6 MBAdded in Solicitation version 2Posted
    Download
  • yell10-24_PED_OPT Z_HA Alignment.pdf

    138 KBAdded in Solicitation version 2Posted
    Download
  • yell10-24_PED_OPT Z_VA Alignment.pdf

    130 KBAdded in Solicitation version 2Posted
    Download
  • yell10-24_Project-Name-Change.pdf

    107 KBAdded in Solicitation version 2Posted
    Download
  • yell10-24_proposed alignment_Horizontal_MAIN.pdf

    148 KBAdded in Solicitation version 2Posted
    Download
  • yell10-24_proposed alignment_Horizontal_WATER.pdf

    154 KBAdded in Solicitation version 2Posted
    Download
  • yell10-24_proposed alignment_Vertical_MAIN.pdf

    137 KBAdded in Solicitation version 2Posted
    Download
  • yell10-24_proposed alignment_Vertical_WATER.pdf

    137 KBAdded in Solicitation version 2Posted
    Download
  • yell10-24_Superelevation_MAIN.pdf

    161 KBAdded in Solicitation version 2Posted
    Download
  • yell10-24_XS_OPT Z_GLEN_8000-00 to 8007-00.pdf

    2.5 MBAdded in Solicitation version 2Posted
    Download
  • yell10-24_XS_OPT Z_OSPREY_1-00 to 10-80.pdf

    5.1 MBAdded in Solicitation version 2Posted
    Download
  • yell10-24_XS_OPT Z_PED_1999-98 TO 2005-80.pdf

    1.9 MBAdded in Solicitation version 2Posted
    Download
  • yell10-24_XS_SCH A Transition_MAIN 848-90 to 851-00.pdf

    793 KBAdded in Solicitation version 2Posted
    Download
  • yell10-24_XS_SCH A w OPT Z_MAIN_851-00 to 859-00.pdf

    2.9 MBAdded in Solicitation version 2Posted
    Download
  • yell10-24_XS_SCH A without OPT Z_MAIN_851-00 to 859-00.pdf

    2.4 MBAdded in Solicitation version 2Posted
    Download
  • yell10-24_XS_SCH A_Golden Gate.pdf

    17 MBAdded in Solicitation version 2Posted
    Download
  • yell10-24_XS_SCH A_WATER.pdf

    6.1 MBAdded in Solicitation version 2Posted
    Download
  • yell10-24_XS_SCH B_MAIN_820-18.24 to 851-00.pdf

    9.2 MBAdded in Solicitation version 2Posted
    Download
  • Physical Data.zip

    15 MBAdded in Solicitation version 2Posted
    Download

Lifecycle

  1. 1
    Version 1PresolicitationArchived

    WY NPS YELL 10(24), Norris to Golden Gate Phase 3

    Notice 39ff2380e8c042ecaf1b04ea394a1ed3 on SAM.gov

  2. 2
    Version 2SolicitationArchived

    Type changed from Presolicitation to Solicitation

    WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

    Notice 49887fd321a94029a9fbf5bff4025fa0 on SAM.gov

  3. 3
    Version 3SolicitationArchived

    WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

    Notice a4ea685e191249c194dd3db24b737ed6 on SAM.gov

  4. 4
    Version 4SolicitationArchived

    WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

    Notice 13152852fe0844e1b27d3eb4d8fb2bd1 on SAM.gov

  5. 5
    Version 5SolicitationArchived

    WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

    Notice dd85c8b88dfa4ae1ae3901aa662fd81b on SAM.gov

  6. 6
    Version 6SolicitationArchived

    WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

    Notice bc580cbbd1874cfa8d08e6f0076c2964 on SAM.gov

  7. 7
    Version 7SolicitationArchived

    WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

    Notice 71e34e9d9c18439d98ae3c151e38cd6b on SAM.gov

  8. 8
    Version 8SolicitationArchived

    WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

    Notice 818c2a2046734989b5e8dd73d3167de4 on SAM.gov

  9. 9
    Version 9SolicitationArchived

    WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

    Notice 71f3fc89ae9b43ec9b74e381f9d7d10d on SAM.gov

  10. 10
    Version 10SolicitationArchived

    WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

    Notice 1ba38051ac5643e18da4ca3a6cdfb90e on SAM.gov

  11. 11
    Version 11SolicitationArchived

    WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

    Notice f4ae15c2a1f54bbb98392ab7fcfcfc0a on SAM.gov

  12. 12
    Version 12SolicitationArchived

    WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

    Notice 3de703056c014bb19d64ebc7c4388488 on SAM.gov

  13. 13
    Version 13SolicitationArchived

    WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

    Notice eb0a874cca4e4c58b8ce3651047bc4ad on SAM.gov

  14. 14
    Version 14SolicitationArchived

    WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

    Notice 5d8318f4ad9b4f14a493ab7c46de45da on SAM.gov

  15. 15
    Version 15SolicitationArchived

    WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

    Notice 6c71289e5396400580265972a348696b on SAM.gov

  16. 16
    Version 16SolicitationArchived

    WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

    Notice 5b20db8e89a9490c874fb220ae2d44ec on SAM.gov

  17. 17
    Version 17SolicitationArchived

    WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

    Notice c11973a9c72d44db8958f5712c0c196e on SAM.gov

  18. 18
    Version 18SolicitationArchived

    WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

    Notice e56cea75f8fb47c4a5755e6aca72424d on SAM.gov

  19. 19
    Version 19SolicitationArchived

    WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

    Notice c26dbbec017b4207bc9f548507700932 on SAM.gov

  20. 21
    Version 21SolicitationArchived

    WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

    Notice 5aee5a61399c4114ae78b7cffb78c14d on SAM.gov

  21. 22
    Version 22SolicitationArchived

    WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

    Notice 584f58452f174fba9bc2e25781050661 on SAM.gov

  22. 23
    Version 23SolicitationCancelledArchivedCurrent

    WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

    Notice d6ab1955392244cfa9bc62cab80281ff on SAM.gov

Other notices for this solicitation

  1. 2×
    Pre-SolicitationSep 5, 2023

    WY NPS YELL 10(24), Norris to Golden Gate Phase 3

    Notice 81c25747387e422db437d7b1b222c52d on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

69056724R000001

Archive Date

Jun 20, 2025

Office Address

VANCOUVER, WA, 98661