Renovate Fitness Room

Archived on August 8, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM PDT
Posted
July 16, 2026
Notice type
Solicitation
Set-aside
Women-Owned Small Business
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
NATIONAL GUARD BUREAU.JFHQ USPFO CA.USPFO CA PROCUREMENT.W7MX USPFO ACTIVITY CAANG 144
Place of performance
Fresno, California, 93727
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W50S6T26QA028
Notice ID
e66f155053ad43dd83b665d2bcd9c1fb

Description

Interior renovation of a 2,997 square foot facility, consisting of five sub-tasks:
A. Paint: Correct deficiencies in the walls, if any; and repaint 5,078 approximately sq ft.
B. Mirror Installation: furnish and secure mirrors to walls. Approximately 2,214 sq ft.
C. Flooring: prepare, seal, and level concrete; raise existing floor drains to be flush with the floor. Install athletic mats to cover approx. 2,592 sq ft.
D. Electrical and Lighting: Replace 33 existing fluorescent lights with LED fixtures. Replace 10 ceiling fans with 10 fans containing LED lighting.
E. Install a one-way backflow prevention valve on exterior drain.

Request for Quote (RFQ) details are provided on the attached solicitation. This requirement is being solicited as a women-owned small business set-aside. Review the RFQ solicitation instructions for quote submission criteria. Quotes shall be submitted electronically to the following email addresses: jarrod.sanchez@us.af.mil; justin.scales.1@us.af.mil

The magnitude of this requirement is between $100,000 and $250,000.

A site visit is tentatively scheduled for Tuesday, 23 June at 0900 PDT.  The designated rally point will be the west gate visitor parking lot. Parking space is limited therefore carpooling is strongly advised. To be granted base access, Offerors must complete Defense Biometric Identification System (DBIDS) Prequalification and submit a base access form.  Complete all fields under the CONTRACTOR/VENDOR/VISITOR INFORMATION section consisting of attendee names, citizenship, and DBIDS code (6-digit code). The base access form must be provided before the site visit. Refer to Attachment, Base Access Request, for additional instructions.

Questions will be accepted until seven days prior to solicitation response deadline.  The site visit is not mandatory but strongly recommended.  Offerors are responsible for verifying conditions at the project site.

As required by 15 U.S.C. § 644(w), implemented by RFO FAR 36.101-4, the following information is provided to interested small businesses:

(A).  The National Guard Bureau (NGB) has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts, other than those described at FAR 43.204, DFARS 243.204 and Army FAR Supplement (AFARS) 5143.204.

(B).  Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the NGB is currently unavailable, however data for Department of the Army (which NGB reports to) is listed below:

Selected Agency: DEPT OF THE ARMY
Time to definitize after receipt of an adequate Change Order Definitization Proposal under Construction Contracts:    Number of Change Order Proposals definitized under Construction Contracts
30 days or less:    0
31 to 60 days:    1
61 to 90 days:    0
91 to 180 days:    0
181 to 365 days:    1
Greater than 365 days:    1
After completion of contract performance via a contract modification addressing all un-definitized equitable adjustments received during contract performance    2

Amendment Issued: Updates have been made to the solicitation. Amendment W50S6T26QA0280002 must be acknowledged to be considered for award. The SF30 must be acknowledged by completing signature fields at 15a, b, c. Submit the SF30 with your quote.

Update 1: RFI questions 31 - 59 have been attached. Available As-builts have been attached.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (9)

  • BLDG 124 - As-Builts.pdf

    4.6 MBAdded in Solicitation version 5Posted
    Download
  • RFI Question and Answer 31 -59.pdf

    292 KBAdded in Solicitation version 5Posted
    Download
  • Solicitation Amendment W50S6T26QA0280002 SF 30.pdf

    3.8 MBAdded in Solicitation version 3Posted
    Download
  • Statement of Work - Gym Renovation Revision 7.14.2026.pdf

    293 KBAdded in Solicitation version 3Posted
    Download
  • RFI Question and Answer 1-30 and Paint Scheme Exhibit.pdf

    342 KBAdded in Solicitation version 3Posted
    Download
  • Base Access Request - 144 SFS DVES FORM (20240320).pdf

    412 KBAdded in Solicitation version 2Posted
    Download
  • Solicitation Amendment - W50S6T26QA0280001 Professional Appearance.pdf

    3.2 MBAdded in Solicitation version 1Posted
    Download
  • Wage Determination CA20260018 Rev 5 18 May 2026.pdf

    215 KBAdded in Solicitation version 1Posted
    Download
  • Technical Factors 26QA28.pdf

    68 KBAdded in Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1SolicitationArchived

    Renovate Fitness Room

    Notice 3b14fcf059a34771b0b9318fc2ac345a on SAM.gov

  2. 2
    Version 2SolicitationArchived

    Renovate Fitness Room

    Notice 01a1e0cb109e4dbeac0da7a0a844a95e on SAM.gov

  3. 3
    Version 3SolicitationArchived

    Renovate Fitness Room

    Notice 09e7ca6f82d94b3fa4fa91a57affa0bb on SAM.gov

  4. 5
    Version 5SolicitationArchivedCurrent

    Renovate Fitness Room

    Notice e66f155053ad43dd83b665d2bcd9c1fb on SAM.gov

  5. 8
    Version 8Award NoticeArchived

    Type changed from Solicitation to Award Notice

    Renovate Fitness Room

    Notice 713a19c78787462787d3986346556873 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This procurement is restricted to the General MACC contractors. Only the General MACC contractors listed on the RFP cover letter may submit a proposal. See attached documents for scope of work and any applicable drawings.
74%
Solicitation11/09/2026
AMENDMENT 0001 Amendment 0001 is hereby issued against Sources Sought Notice W519TC-27-R-B129.Changes: From Original language: Description: The Army Contracting Command–Rock Island (ACC-RI), on behalf of the Project Lead Joint Services (PL JS) and the McAlester Army Ammunition Plant (MCAAP) Directorate of Public Works (DPW), is seeking capable sources for the design and construction of a modernized facility (Renovation and Modernization of Building 129, Lunch and Locker Room Facility) capable of supporting consolidated personnel operations at MCAAP while complying with strict Department of Defense physical security, environmental, and facility modernization standards. The United States Government (Government) intends to utilize the information submitted in response to this Sources Sought Notice (SSN) to issue a follow-on Request for Solutions (RFS) that will encompass the full requirement for the modernized Building 129 facility. The Government is contemplating using a Stand-Alone Other Transaction Agreement (OTA) under 10 U.S.C. § 2808a (Facility construction or repair: transactions other than contracts and grants) to satisfy this requirement. This authority allows the Department of Defense to carry out repair and construction projects for facilities outside the traditional Federal Acquisition Regulation (FAR) framework. However, if the acquisition approach changes, the information obtained from this SSN will be utilized in the planning and award of the project. The Government's intent is to award the proposed transaction(s) based on the capabilities demonstrated in response to the follow-on RFS; therefore, all interested sources shall ensure that they have fully identified, in writing, their capabilities to perform the requirements included in this SSN and subsequent updates. The Government encourages responses from traditional defense contractors, non-traditional defense contractors, construction technology companies, commercial innovators, and consortia, even if they have not previously performed work for the Department of Defense. To Revised Language: Description: The Army Contracting Command–Rock Island (ACC-RI), on behalf of the Project Lead Joint Services (PL JS) and the McAlester Army Ammunition Plant (MCAAP) Directorate of Public Works (DPW), is seeking capable sources for the design and construction of a modernized facility (Renovation and Modernization of Building 129, Lunch and Locker Room Facility) capable of supporting consolidated personnel operations at MCAAP while complying with strict Department of War physical security, environmental, and facility modernization standards. The United States Government (Government) intends to utilize the information submitted in response to this Sources Sought Notice (SSN) to issue a follow-on solicitation, request for solutions, request for quote that will encompass the full requirement for the modernized Building 129 facility. The Government is contemplating using a Stand-Alone Other Transaction Agreement (OTA) under 10 U.S.C. § 2808a (Facility construction or repair: transactions other than contracts and grants, 10 U.S.C § 4022 Authority of the Department of Defense to carry out certain prototype projects, and Federal Acquisition Regulation (FAR) 12, Acquisition of Commercial Products and Services to satisfy this requirement. The Other Transaction authorities allow the Department of War to carry out repair and construction projects for facilities, prototype projects outside the traditional Federal Acquisition Regulation (FAR) framework. However, if the acquisition approach changes, the information obtained from this SSN will be utilized in the planning and award of the project. The U.S Government is seeking input from interested parties related to the strategy considerations. Please provide input under separate cover to the points of contact listed below. Stand-Alone Other Transaction Agreement (OTA) under 10 U.S.C. § 2808a (Facility construction or repair: transactions other than contracts and grants Stand-Alone Other Transaction Agreement (OTA) 10 U.S.C. § 4022 Authority of the Department of Defense to carry out certain prototype projects Federal Acquisition Regulation (FAR) 12, Acquisition of Commercial Products and Services The Government's intent is to award the proposed transaction(s) based on the capabilities demonstrated in response to the follow-on RFS; therefore, all interested sources shall ensure that they have fully identified, in writing, their capabilities to perform the requirements included in this SSN and subsequent updates. The Government encourages responses from traditional defense contractors, non-traditional defense contractors, construction technology companies, commercial innovators, and consortia, even if they have not previously performed work for the Department of War. All terms and conditions remain unchanged. ****************************************************************************************************************************************************** DESCRIPTION: The Army Contracting Command-Rock Island (ACC-RI), on behalf of the McAlester Army Ammunition Plant (MCAAP) Directorate of Public Works (DPW), is seeking capable sources for the design and construction of a modernized facility (Renovation and Modernization of Building 129, Lunch and Locker Room Facility) capable of supporting consolidated personnel operations at MCAAP while complying with strict Department of Defense physical security, environmental, and facility modernization standards. The United States Government (Government) intends to utilize the information submitted in response to this Sources Sought Notice (SSN) to issue a follow-on Request for Solutions (RFS) that will encompass the full requirement for the modernized Building 129 facility. The Government is contemplating using a Stand-Alone Other Transaction Agreement (OTA) under 10 U.S.C. § 2808a (Facility construction or repair: transactions other than contracts and grants) to satisfy this requirement. This authority allows the Department of Defense to carry out repair and construction projects for facilities outside the traditional Federal Acquisition Regulation (FAR) framework. However, if the acquisition approach changes, the information obtained from this SSN will be utilized in the planning and award of the project. The United States Governement's (Government) intends to award the proposed transaction(s) based on the capabilities demonstrated in response to the RFS; therefore, all interested sources shall ensure that they have fully identified, in writing, their capabilities to perform the requirements included in this SSN and subsequent updates. The Government encourages responses from traditional defense contractors, nontraditional defense contractors, construction technology companies, commercial innovators, and consortia, even if they have not previously performed work for the Department of Defense. ATTACHMENTS Additional information regarding SSN can be found in attachments
69%
Market Research11/23/2026
**The submission date has been updated to 18 April 2025 at 10:00am. And Attachment 7 has been deleted because it contained incorrect information.**The Mission and Installation Contracting Command (MICC), Fort McCoy, Wisconsin has a requirement for FY 25-FY 30, Five Year Multiple-Award Indefinite Delivery Indefinite Quantity (MAIDIQ) contract FY25 - FY30. For the 63rd Readiness Division, Region 4 which encompasses the state of California. Work to be performed will be within the North American Industry Classification System (NAICS) Code 236220 with a small business size standard of $45 Million. Solicitation W911SA25RA010 will be issued as a Request for Proposal (RFP) using the procedures outlined in Federal Acquisition Regulation (FAR) Part 15 as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), and the Army Federal Acquisition Regulation Supplement (AFARS). It is anticipated that this requirement will be awarded as a multiple (5) award, firm fixed-price contract. This solicitation will be 100% HUBZone Set-Aside Project magnitude: Max Value is $15 million. Period of Performance: 5-Year Ordering Period MICC Fort McCoy intends to issue the solicitation within 30 days of this presolicitation notice. The site visit date and time will be provided in the solicitation, once it is posted. Do not contact the Contract Specialist for requests to change the set aside or to state your interest. Parties interested in the solicitation, associated documents, and solicitation amendments can add themselves to the Interested Vendors List; contractors will not be directly notified of postings of any related documents.
69%
Solicitation04/18/2025
Login at https://piee.eb.mil and search for 'N4008526R0232' to obtain more details.*
68%
Solicitation09/08/2026
The Contractor shall provide all personnel, equipment, tools, supervision, and any other items and services necessary, to perform all operations in connection with successfully completing the renovation to building 2340 of the 549 CTS Nellis AFB squadron. The scope of renovation work shall include the complete demolition and replacement of the existing male and female restrooms with modernized, full bathroom facilities. Additionally, the contractor shall install new epoxy flooring in designated areas, upgrade lighting to LCD fixtures where necessary, paint interior walls, and complete all remaining tasks in a manner that will present a clean, neat, and professional appearance in accordance with this Statement of Work (SOW). Installation and testing be accomplish within, 120 days, period of performance. Proposals will be evaluated using lowest price, technically acceptable. A site visit will take place on 8/12/2026 at 0900 AM PDT, meeting in front of building 2340 main entrance. Please ensure your base pass request has been submitted to me by 2PM PDT on 7/30/2026 if you do not have base access to Nellis AFB to ensure you have access by the date of the site visit. Proposals are due by 09/03/2026 at 2:00 PDT. Please submit all questions directly to the william.vance.6@us.af.mil and justin.woosley@us.af.mil. Answers will be provided via a solicitation amendment.
68%
Solicitation09/03/2026

Additional Details

Solicitation Number

W50S6T26QA028

Archive Date

Aug 8, 2026

Office Address

FRESNO, CA, 93727-2199