GovChime
Notice ID: 3b3da6c1e2b943c39bb278102a36e288Solicitation

PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION

Active, responses due . Full description on SAM.gov.

Overview

Response deadline
2:00 PM CST
Posted
November 12, 2026
Notice type
Solicitation
Set-aside
No Set aside used
NAICS
238220: Plumbing, Heating, and Air-Conditioning Contractors
Agency
Department of Energy

Notice details

Office
FERMILAB - DOE CONTRACTOR
Place of performance
Batavia, Illinois, 60510
PSC
K056: MODIFICATION OF EQUIPMENT- CONSTRUCTION AND BUILDING MATERIALS
Last updated
Nov 12, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
378854_MR
Notice ID
3b3da6c1e2b943c39bb278102a36e288

Description

This scope of work includes fabricating and installing a Low Conductivity Water (LCW) Piping System in the F-37 Pump Room. 

PLEASE NOTE the important information related to this RFP:

  • Pre-Proposal Meeting and Site Visit:        October 27, 10:00a CDT
  • Last Day for Questions:                                   November 5, 2026, 4:00p CDT
  • PROPOSALS DUE:                                               December 3, 2026, 2:00p CDT

To attend the Pre-Proposal Meeting and Site Visit, PPE is required.

As Fermilab is a federal facility, to access the Fermilab site, offerors MUST complete an Access Request form AT LEAST SEVEN (7) DAYS IN ADVANCE OF THE MEETING. AS THIS IS A SECURED DOE SITE, FNAL IS UNABLE TO PROCESS ACCESS REQUESTS THAT ARE NOT RECEIVED 7 DAYS PRIOR TO THE PRE-SOLICITATION CONFERENCE.  Additionally, to obtain on-site access approval, attendees must be a U.S. Citizen and have a REAL ID.

Please note that when entering Fermilab:

  • All vehicles are subject to search
  • No weapons, firearms, or ammunition (regardless of concealed carry permit) are allowed on-site.
  • No explosives or any other apparatus or material hazardous to the public or property are allowed on site.
  • No possession or illegal use of controlled substances or intoxicants, or being under their influence, is allowable.
  • No personal alcohol or marijuana
  • No Smoking or vaping within buildings and within 15-25 feet of entrances
  • Illinois Rules of the Road are to be followed while driving on Fermilab’s premises.

Full description on SAM.gov

Award Overview

No prior contract identified

No matching prior contract was found within an 18-month window using the same agency, NAICS, place-of-performance state, and PSC. This may be a new requirement, or the prior award uses a different classification.

Contacts

Contracting Officer

Primary Contact

Documents

Files (32)

  • Addenda_3.pdf

    139 KBAdded in Solicitation version 4Posted
    Download
  • Addenda_2.pdf

    164 KBAdded in Solicitation version 3Posted
    Download
  • HX drawing for F37.pdf

    426 KBAdded in Solicitation version 3Posted
    Download
  • PIP-II Pipe Support Analysis and Design Deliverable PO 683434.pdf

    4.2 MBAdded in Solicitation version 2Posted
    Download
  • PIP-II F37 Pump Room Concrete Pad Specification.pdf

    56 KBAdded in Solicitation version 2Posted
    Download
  • Flowserve pump data proposed.pdf

    1.3 MBAdded in Solicitation version 2Posted
    Download
  • Addenda_1.pdf

    163 KBAdded in Solicitation version 2Posted
    Download
  • 378854_MR.pdf

    323 KBAdded in Solicitation version 1Posted
    Download
  • EXHIBIT_25_Drawings.zip

    17 MBAdded in Solicitation version 1Posted
    Download
  • EXHIBIT_24_Sample Subcontract.pdf

    209 KBAdded in Solicitation version 1Posted
    Download
  • EXHIBIT_23_Performance Bond.pdf

    102 KBAdded in Solicitation version 1Posted
    Download
  • EXHIBIT_22_Payment Bond.pdf

    115 KBAdded in Solicitation version 1Posted
    Download
  • EXHIBIT_21_Bid_Bond.pdf

    115 KBAdded in Solicitation version 1Posted
    Download
  • EXHIBIT_20_SF1413-23a.pdf

    189 KBAdded in Solicitation version 1Posted
    Download
  • EXHIBIT_19_General_Decision_Number_IL20260008_05_18_2026.pdf

    889 KBAdded in Solicitation version 1Posted
    Download
  • EXHIBIT_18_Injury_Illness_Questionaire.pdf

    113 KBAdded in Solicitation version 1Posted
    Download
  • EXHIBIT_17_FL-55.pdf

    392 KBAdded in Solicitation version 1Posted
    Download
  • EXHIBIT_16__2025_Construction_Insurance_Requirements.pdf

    234 KBAdded in Solicitation version 1Posted
    Download
  • EXHIBIT_15_SARC.pdf

    471 KBAdded in Solicitation version 1Posted
    Download
  • EXHIBIT_14_Proposal Certifications.pdf

    406 KBAdded in Solicitation version 1Posted
    Download
  • EXHIBIT_13_CESHC.pdf

    428 KBAdded in Solicitation version 1Posted
    Download
  • EXHIBIT_12_014100 Quality Requirements.pdf

    166 KBAdded in Solicitation version 1Posted
    Download
  • EXHIBIT_11_013300 Submittals.pdf

    146 KBAdded in Solicitation version 1Posted
    Download
  • EXHIBIT_10_013100 ESH Requirements.pdf

    919 KBAdded in Solicitation version 1Posted
    Download
  • EXHIBIT_9_010010 General Requirements.pdf

    337 KBAdded in Solicitation version 1Posted
    Download
  • EXHIBIT_8_FESHM 5034 Pressure Testing.pdf

    512 KBAdded in Solicitation version 1Posted
    Download
  • EXHIBIT_7_ADDENDUM TO FESHM.pdf

    174 KBAdded in Solicitation version 1Posted
    Download
  • EXHIBIT_6_5031_1 Piping Systems March 2025.pdf

    1.5 MBAdded in Solicitation version 1Posted
    Download
  • EXHIBIT_5_F37_LCW_Electrical_Statement_of_Work_and_prints_rev_A.pdf

    754 KBAdded in Solicitation version 1Posted
    Download
  • EXHIBIT_4_ED0042585_PIP-II_F37_Bldg_Low_Conductivity_Water_Specification.pdf

    343 KBAdded in Solicitation version 1Posted
    Download
  • EXHIBIT_3_ED0042584_PIP-II_Low_Conductivity_Water_LCW_System_Instrumentation_Specification.pdf

    194 KBAdded in Solicitation version 1Posted
    Download
  • EXHIBIT_2_FFDG_General_Terms_and_Conditions.pdf

    320 KBAdded in Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Solicitation

    PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION

    Notice dc8ba2d3303a4cd1927e7b75f941886c on SAM.gov

  2. 2
    Version 2Solicitation

    PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION

    Notice 83e1899de95d4b858c62f5db751f24f4 on SAM.gov

  3. 3
    Version 3Solicitation

    PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION

    Notice 96b6316db2004decba9dabbf5f32ebb4 on SAM.gov

  4. 4
    Version 4SolicitationCurrent

    PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION

    Notice 3b3da6c1e2b943c39bb278102a36e288 on SAM.gov

Similar Opportunities

Title
Phase
Deadline

Additional Details

Solicitation Number

378854_MR

Archive Date

Dec 18, 2026

Office Address

Batavia, IL, 60510