Binghamton New York First Floor Buildout Solicitation
Archived on May 26, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 6:00 PM EDT
- Posted
- April 29, 2026
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- General Services AdministrationPUBLIC BUILDINGS SERVICE
Notice details
- Office
- PBS PROJECT DELIVERY EAST - BRANCH C
- Place of performance
- Binghamton, New York, 13901
- PSC
- Z2AA: REPAIR OR ALTERATION OF OFFICE BUILDINGS
- Last updated
- Oct 31, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 47PC5326R0002
- Notice ID
- 976260f5f29040108bbbb1e26e8593f2
Description
Amendment 4:
The purpose of this amendment is to extend the due date for proposals to 5/11/2026 at 6PM Eastern.
Amendment 3:
The purpose of this amendment is to provide responses to RFIs.
As a result of this amendment:
1. REPLACE pages 2 and 3 only of Specification Section 000100 – Table of Contents with the attached. Section 081113 is not required. Section listed “224217” is a typo and should be changed to “224216”.
2. REPLACE page 1 only of Specification Section 011000 with the attached, which changes paragraph 1.1.B.1 - revised to read “Binghamton Federal Building & Courthouse 1 st Floor Build-Out”.
3. REPLACE Drawing Sheet AE600 with the attached revised Drawing Sheet AE600 with “Door Hardware Schedule” information included.
4. REPLACE Drawing Sheet AE-601 with the attached revised Drawing Sheet AE601, clarifying a typo on the Room Finish Schedule – “PNT4” should be “PNT2”.
The following Attachments are incorporated: 1. Specification Section 000100 – Table of Contents (pages 2 & 3) 2. Specification Section 011000 - Summary (page 1) 3. Drawing Sheet AE600 4. Drawing Sheet AE-601 5. 47PC5326R0002 RFI Responses Binghamton 1st Floor Build-out
The due date for proposals is extended to May 4, 2026 at 4:00 PM Eastern.
Amendment 2:
The purpose of this amendment is to extend the due date for proposals to 5/1/2026.
This will allow time to provide responses to questions received. An additional amendment will be forthcoming with the responses to questions received.
Amendment 1:
The purpose of the amendment is to include the SF1442 and the site visit sign in sheet.
Offerors are reminded their SAM registration status must be “Active”, at the time their offer is submitted, to be considered for award (see FAR 52.204-7). Offerors submitting a proposal in response to this Solicitation shall complete electronic Annual Representations and Certifications in conjunction with required Entity registration in System for Award Management (SAM), accessed via System for
Award Management. Offerors shall also submit with their proposal, the completed provisions identified in Section IV
of the solicitation.
_________________
The General Services Administration (GSA), Public Buildings Service, Upstate Service District, intends to procure construction services for the build-out of the 1st Floor at the Binghamton Federal Building and U.S. Courthouse, located at 15 Henry Street, Binghamton, New York 13901.
Site Visit is scheduled for Tuesday, April 14, 2026.
This project involves the furnishing of all materials, equipment, labor, and supervision to complete the work described in the contract documents, including drawings and specifications developed by N.K. Bhandari Architecture & Engineering, P.C.
The total renovated space is approximately 3,015 Sq. Ft. and will be constructed as a Sensitive Compartmented Information Facility (SCIF). Base interior work includes, but is not limited to: demolition, abatement, new walls, hard ceiling, doors, casework, woodwork, flooring, plumbing, electrical, IT, fire protection, and mechanical work.
Qualification Requirements
Interested contractors must meet the following minimum qualifications:
- Experience: Minimum 8 years of successful experience in comparable projects (size, complexity, and scope).
- Past Performance:
- All three required past performance projects must have a minimum award value of $1,500,000.
- At least one of the three required past performance projects must be SCIF construction, performed as the General Contractor.
- Key Personnel Experience: The Project Manager and Superintendent must each have a minimum of 8 years of experience in their respective positions.
- Prohibition: The Company owner may not serve as the Project Manager.
Special Requirements
The contractor must adhere to the following special conditions:
- Security: All personnel must meet HSPD-12 security requirements and any additional customer agency requirements.
- Site Conduct: Cell phones and transmittal devices are prohibited on the project site.
- Scheduling: Loud or disruptive work must be performed off-hours at no additional cost to the Government.
- Coordination: The Contractor is responsible for coordinating all building shut-offs and roof penetrations with GSA Building Management and the Security Division Access Control (SDAC).
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
Files (23)
- Download
Solicitation Amendment 47PC5326R0002_0004.pdf
566 KBAdded in Solicitation version 11Posted - Download
47PC5326R0002 SF1442.pdf
1.3 MBAdded in Solicitation version 9Posted - Download
Binghamton 1st Floor_AE600.pdf
3.1 MBAdded in Solicitation version 8Posted - Download
Pages from SPECIFICATIONS_Binghamton 1st Flr Build-Out.pdf
1.0 MBAdded in Solicitation version 8Posted - Download
20260114 DCMA Security Design Guide-V4.1-(2.28.24).pdf
781 KBAdded in Solicitation version 8Posted - Download
Solicitation Amendment 47PC5326R0002_0003.pdf
572 KBAdded in Solicitation version 8Posted - Download
Binghamton 1st Floor_AE601.pdf
530 KBAdded in Solicitation version 8Posted - Download
Bing-Roof close out-warranty .pdf
135 KBAdded in Solicitation version 8Posted - Download
47PC5326R0002 RFI Responses Binghamton 1st Floor Build-out.pdf
149 KBAdded in Solicitation version 8Posted - Download
Solicitation Amendment 47PC5326R0002_0002.pdf
566 KBAdded in Solicitation version 7Posted - Download
Solicitation Amendment 47PC5326R0002_0001.pdf
568 KBAdded in Solicitation version 6Posted - Download
47PC5326R0002 Site Visit Sign in Sheet .pdf
75 KBAdded in Solicitation version 6Posted - Download
47PC5326R0002 Agreement Binghamton 1st Floor Build-out.pdf
608 KBAdded in Solicitation version 2Posted - Download
47PC5326R0002 Solicitation Binghamton 1st Floor Build-out.pdf
370 KBAdded in Solicitation version 2Posted - Download
Attachment 1 Experience on Similar Projects Offeror Form.xlsx
152 KBAdded in Solicitation version 2Posted - Download
Attachment 3 Key Personnel Resume.docx
66 KBAdded in Solicitation version 2Posted - Download
Attachment 2 PBS Past Performance Questionnaire.pdf
33 KBAdded in Solicitation version 2Posted - Download
Construction SOW Binghamton 1st Fl 02 19 2026.pdf
105 KBAdded in Solicitation version 2Posted - Download
GSA527-21a.pdf
897 KBAdded in Solicitation version 2Posted - Download
SF24-23a.pdf
703 KBAdded in Solicitation version 2Posted - Download
Wage Determination NY20260004 01 30 2026.pdf
83 KBAdded in Solicitation version 2Posted - Requires SAM.gov sign-in
CONSTRUCTION DRAWINGS Binghamton 1st Flr Build-Out REV1.pdf
22 MBAdded in Solicitation version 2Posted - Requires SAM.gov sign-in
CONSTRUCTION_ SPECIFICATIONS_Binghamton 1st Flr Build-Out_REV1.pdf
30 MBAdded in Solicitation version 2Posted
Links (1)
- Definitization of Equitable Adjustments for Change Orderswww.gsa.govPosted
Lifecycle
- 4Version 4PresolicitationArchived
PRESOLICITATION NOTICE - Binghamton New York First Floor Buildout
- 2Version 2SolicitationArchived
Type changed from Presolicitation to Solicitation
Binghamton New York First Floor Buildout Solicitation
- 3Version 3SolicitationArchived
Binghamton New York First Floor Buildout Solicitation
- 6Version 6SolicitationArchived
Binghamton New York First Floor Buildout Solicitation
- 7Version 7SolicitationArchived
Binghamton New York First Floor Buildout Solicitation
- 8Version 8SolicitationArchived
Binghamton New York First Floor Buildout Solicitation
- 9Version 9SolicitationArchived
Binghamton New York First Floor Buildout Solicitation
- 11Version 11SolicitationArchivedCurrent
Binghamton New York First Floor Buildout Solicitation
Similar Opportunities
Additional Details
Solicitation Number
47PC5326R0002
Archive Date
May 26, 2026
Office Address
Washington, DC, 20405