Rubberized Roof Sealant Removal and Replacement, Fort Devens
Archived on July 23, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 4:00 PM EDT
- Posted
- July 7, 2026
- Notice type
- Solicitation
- Set-aside
- Service-Disabled Veteran-Owned Small Business Set Aside
- NAICS
- 238160: Roofing Contractors
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- AMC.ACC.ACC-CTRS.ACC-NJ.W6QK ACC-PICA
- Place of performance
- Massachusetts, 01434
- PSC
- Z2AZ: REPAIR OR ALTERATION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W15QKN26QA132
- Notice ID
- 3d1177c3926c4097b9123f86576d7429
Description
Amendment 0002:
The purpose of this amendment is to answer vendors' questions.
Amendment 0001:
The purpose of this amendment is to extend the response due date from 12PM EST 2 July 2026 to 4PM EST 8 July 2026 and answer vendors' questions.
ItemCritical Project ParameterDetail / RequirementProject NameRubberized Roof Sealant Removal and ReplacementBuilding 3574, Devens Reserve Forces Training Area (RFTA), Devens, MASolicitation No.W15QKN26QA132Request for Proposal (RFP)Contract TypeFirm-Fixed-Price (FFP)Single-award commercial construction services contract.Set-Aside Status100% Service-Disabled Veteran-Owned Small Business (SDVOSB)NAICS: 238160 (Roofing Contractors) | Size Standard: $19.0MBonding / SecurityWaivedPre-award bid guarantees, post-award performance and payment bonds (SF 25/SF 25A), and alternative payment protections are not required.Period of Performance20 Working DaysThe performance period begins after the issuance of the Notice to Proceed (NTP).Mandatory Labor RatesDavis-Bacon Act Prevailing WagesMiddlesex County Wage Determination MA20260001 (issued May 18, 2026).Questions DeadlineJune 30, 2026, at 12:00 PM ESTSubmitted in writing via email to the Contract Specialist and Contracting Officer.Proposal DeadlineJuly 02, 2026, at 12:00 PM EST100% Electronic Submission via Email to the Contract Specialist.Primary Contact (CS)Nelia Shyshak, Contract Specialistnelia.shyshak.civ@army.mil
Summary of What the Contractor Shall Provide
To be deemed technically acceptable and responsive, the successful contractor must deliver the physical services and technical deliverables detailed below:
-
Physical Construction & Specialty Trade Services:
-
Sealant Removal: Complete removal of the existing failed under-eave rubberized sealant on Building 3574.
-
Surface Preparation: Prepare the exposed surface to ensure it is completely dry, clean, and free of residues. The Government reserves the right to inspect the surface prior to new installation.
-
Sealant Installation: Provide and install new commercial-grade sealant, ensuring uniform application over the designated 270 to 300 square foot under-eave perimeter.
-
General Scope: The Contractor shall provide all plant, labor, equipment (including scissor lift), tools, materials, supervision, and transportation necessary to accomplish the work.
-
-
Mandatory Technical Submittals & Deliverables (Within 10 business days of NTP):
-
Rubberized Roof Sealant Replacement Plan
-
Warranty Management Plan
-
Manufacturer's Instructions
-
Operations and Maintenance Data
-
-
Completed Cost Breakdown Form (Attachment 0003): An itemized breakdown specifying direct labor (compliant with the specified Wage Determination), materials/equipment, and a separate calculation for Overhead/G&A and Profit.
Mandatory Site Visit & Access
Prospective offerors are highly encouraged to inspect the site. Failure to do so will not constitute grounds for a claim after award.
-
Site Visit Schedule:
-
Primary Site Visit: Tuesday, June 25, 2026, at 9:00 AM EST
-
Secondary Site Visit: Wednesday, June 26, 2026, at 9:00 AM EST
-
Site Visit Address: Building 3574, Devens RFTA, Main Cantonment Area, Devens, MA 01434.
-
-
Access Pass Security (Mandatory 48-Hour Advance Notice):
Attendees must submit the "Devens Visitors Pass" request form at least forty-eight (48) hours prior to the scheduled site visit date and time.-
Zygmunt Osiecki, DPW Director | Email: zygmunt.v.osiecki.civ@army.mil | Phone: (978) 615-6104
-
Post-Award Contract Execution Sequence
Contract performance shall follow this strict chronological sequence. Physical mobilization, tool delivery, or actual onsite work is strictly prohibited prior to receiving the written Notice to Proceed (NTP).
-
Contract Award: The Government executes and issues the FFP contract in the Army Contract Writing System (ACWS).
-
Notice to Proceed (NTP) Issuance: Upon contract execution, the Contracting Officer issues the formal NTP, which officially starts the 20-working-day Period of Performance (PoP) clock.
-
Required Submittals: Within ten (10) business days following NTP, the Contractor shall submit all required technical documents for Government review and approval.
-
Pre-Construction Conference: After NTP issuance but prior to starting work, a conference will be held to review base access and safety.
-
Onsite Work Commencement: The Contractor may begin physical onsite work only after submittals are approved and the pre-construction conference is complete.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (8)
- Download
Solicitation Amendment W15QKN26QA1320002 SF 30.pdf
3.8 MBAdded in Solicitation version 7Posted - Download
Solicitation Amendment W15QKN26QA1320001 SF 30.pdf
3.8 MBAdded in Solicitation version 5Posted - Download
Davis-Bacon Act WD MA20260001 d. 5.18.2026.pdf
5.4 MBAdded in Solicitation version 4Posted - Download
Solicitation - W15QKN26QA132 Professional Appearance.pdf
6.2 MBAdded in Solicitation version 4Posted - Download
Devens_Visitors_Pass_Request.pdf
527 KBAdded in Solicitation version 4Posted - Download
BLDG 3574 Rubberized Roof Sealant Replacement 17 June 2026.pdf
237 KBAdded in Solicitation version 4Posted - Download
ATTACHMENT 0003 - CONTRACTOR PRICE BREAKDOWN FORM.xlsx
16 KBAdded in Solicitation version 4Posted - Download
BLDG 3574 Rubberized Roof Sealant Replacement 1 May 2026.pdf
443 KBAdded in Sources Sought version 3Posted
Lifecycle
- 3Version 3Sources SoughtArchived
Rubberized Roof Sealant Removal and Replacement, Fort Devens
- 4Version 4SolicitationArchived
Type changed from Sources Sought to Solicitation
Rubberized Roof Sealant Removal and Replacement, Fort Devens
- 5Version 5SolicitationArchived
Rubberized Roof Sealant Removal and Replacement, Fort Devens
- 7Version 7SolicitationArchivedCurrent
Rubberized Roof Sealant Removal and Replacement, Fort Devens
Similar Opportunities
- Berlin Roof Replacement
Department of War · Posted 09/24/2026
- Pleasant Hill Dam Intake Roof Rehabilitation and Sealant Replacement
Department of War · Posted 08/26/2026
- Berlin Roof Replacements
Department of War · Posted 05/18/2026
- London Locks and Dam Pier House Roof Replacements
Department of War · Posted 04/24/2026
- Berlin Roof Replacements
Department of War · Posted 04/23/2026
Additional Details
Solicitation Number
W15QKN26QA132
Archive Date
Jul 23, 2026
Office Address
PICATINNY ARSENAL, NJ, 07806-5000