GovChime
Notice ID: a7d511d34b4b4f659708dbe262695661Award NoticeAwardedArchived

Z--This requirement involves removing existing conduit; removing concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells.

Awarded on April 21, 2025. Full description on SAM.gov.

Awarded tounder 140R2025C0005 (source: SAM.gov award notice)• $5.0M

Overview

Posted
April 21, 2025
Notice type
Award Notice
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of the Interior

Notice details

Last updated
Nov 15, 2026
First published
Last updated on SAM.gov
Award date
Apr 21, 2025
Award amount (SAM.gov award notice)
$5.0M

Identifiers

Solicitation number
140R2025R0004
Notice ID
a7d511d34b4b4f659708dbe262695661
Award number (PIID)
140R2025C0005

Description

This requirement involves removing existing conduit; removing concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells.

Full description on SAM.gov

Award Overview

Award Number

140R2025C0005

Award Amount (SAM.gov award notice)

$5.0M

Award Date

Apr 21, 2025

Awardee

Awardee UEI

C9RAA5KDBKC5

Awardee CAGE Code

6E9D1

Original Solicitation

Notice ID: a7d511d34b4b4f659708dbe262695661

Posted Date: Apr 21, 2025

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

2
  • 140R2025C0005
    SUULUTAAQ, INC.
    Department of the InteriorNAICS 237990
    $5.0MSigned Feb 11, 2026
  • 140R2025C0005
    SUULUTAAQ, INC.
    Department of the InteriorNAICS 237990
    $5.0MSigned Apr 21, 2025

Contacts

Documents

Files (19)

  • Sol_140R2025R0004_Amd_0003.pdf

    87 KBAdded in Solicitation version 7Posted
    Download
  • Amendment_0003_to_140R2025R0004_0003.pdf

    125 KBAdded in Solicitation version 7Posted
    Download
  • Sol_140R2025R0004_Amd_0002.pdf

    91 KBAdded in Solicitation version 5Posted
    Download
  • Amendment_0002_to_Solicitation_140R2025R0004_0002.pdf

    7.8 MBAdded in Solicitation version 5Posted
    Download
  • Sol_140R2025R0004_Amd_0001.pdf

    87 KBAdded in Solicitation version 5Posted
    Download
  • Attachment_11_-_Virtual_Presentation_Slides_0001.pptx

    23 MBAdded in Solicitation version 5Posted
    Download
  • Amendment_0001_to_140R2025R0004_0001.pdf

    185 KBAdded in Solicitation version 5Posted
    Download
  • Attachment_12_-_In_Person_Site_Visit_Sign_in_Sheet_0001.pdf

    117 KBAdded in Solicitation version 5Posted
    Download
  • Attachment_10_-_Virtual_Site_Visit_Attendance_23JAN25_0001.pdf

    46 KBAdded in Solicitation version 5Posted
    Download
  • Attachment_13_-_In_Person_Site_Visit_Agenda_0001.pdf

    162 KBAdded in Solicitation version 5Posted
    Download
  • Sol_140R2025R0004.pdf

    98 KBAdded in Solicitation version 5Posted
    Download
  • C05_04__Attachment_5_-_General_Decision_No__CA20250007.pdf

    249 KBAdded in Solicitation version 5Posted
    Download
  • C05_04_140R2025R0004_Solicitation_-_Folsom_RWD.pdf

    1.7 MBAdded in Solicitation version 5Posted
    Download
  • C05_04__Attachment_6_-_Past_Performance_Questionnaire.pdf

    696 KBAdded in Solicitation version 5Posted
    Download
  • C05_04__Attachment_4_-_Release_of_Claims.pdf

    420 KBAdded in Solicitation version 5Posted
    Download
  • C05_04__Attachment_9_-_Electronic_Proposal_Submission_Instructions_Kiteworks.pdf

    321 KBAdded in Solicitation version 5Posted
    Download
  • Construction_Contract_Administration.docx

    13 KBAdded in Solicitation version 5Posted
    Download
  • C05_04__Attachment_7_-_Past_Performance_Data_Form.pdf

    601 KBAdded in Solicitation version 5Posted
    Download
  • C05_04__Attachment_8_-_Offeror_Responsibility_Information.pdf

    221 KBAdded in Solicitation version 5Posted
    Download

Lifecycle

  1. 2
    Version 2SolicitationArchived

    Z--Folsom Right Wing Dam Ditch Bypass Modifications

    Notice 46772e93aad040c6940cc4b4cfd1bf51 on SAM.gov

  2. 5
    Version 5Award NoticeArchivedCurrent

    Type changed from Solicitation to Award Notice

    Z--This requirement involves removing existing conduit; removing concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells.

    Notice a7d511d34b4b4f659708dbe262695661 on SAM.gov

Other notices for this solicitation

  1. 2×
    Pre-SolicitationDec 20, 2024

    Z--Folsom Right Wing Dam - North Fork Ditch Bypass

    Notice ad6ff13b5f624e2098fa6a79b9c974e8 on SAM.gov

  2. 2×
    SolicitationJan 13, 2025

    Z--Folsom Right Wing Dam Ditch Bypass Modifications

    Notice dcf3df1b445245c1bdc3e3f4c69a95f0 on SAM.gov

  3. SolicitationRelated noticeFeb 11, 2025

    Z--Folsom Right Wing Dam Ditch Bypass Modifications

    Notice e49337dede85412d95d963951abc154e on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

140R2025R0004

Archive Date

May 6, 2025

Office Address

SACRAMENTO, CA, 95825