MT0055AW, 34406, Roof and Building Envelope Modernization, Turner LPOE - Amendment 0002
Archived on October 7, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 4:30 PM MST
- Posted
- October 6, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- General Services AdministrationPUBLIC BUILDINGS SERVICE
Notice details
- Office
- PBS PROJECT DELIVERY WEST - BRANCH E
- Place of performance
- Turner, Montana
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 47PD5526R0042
- Notice ID
- 7eeb6df6c5bf43dbaf58cc58a032c205
Description
All offers should be submitted electronically to john.morelion@gsa.gov
The following documents are included:
- joint sealants
-2024-07-26_GSA Turner_100% CD Project Manual
-CRCI Updated Turner Roof Inspection Report 6.3.2022
-RFIs and responses
The U.S. General Services Administration intends to solicit construction services for the Turner Roof & Building Envelope Project at the Turner Land Port of Entry, 41725 Turner Road, Turner, Montana 59542, Building No. MT0055AW.
The project includes roof replacement and building envelope improvements at the main building, including work on the U.S. and Canadian sides of the facility, and envelope improvements at the water treatment building. Work includes, but is not limited to, selective demolition, roof replacement, exterior wall/cladding repairs, thermal and moisture protection, metals, openings, finishes, and incidental electrical, communications, and security-related coordination.
The facility will remain occupied and operational during construction. The contractor must phase and secure the work daily, maintain safe access, protect ongoing border operations, and coordinate with GSA, CBP, CBSA, and other stakeholders regarding antennas, cameras, cables, signs, access, security, and inspections. Work affecting the Canadian side may require Canadian access, work permit, and material import coordination.
Certain roofing materials may be furnished through the existing roofing warranty process; the contractor will be responsible for coordinating those materials with the manufacturer/certified installer and providing all remaining labor, materials, equipment, supervision, bonds, permits, and incidentals required to complete the work.
The contractor shall comply with the solicitation documents, drawings, specifications, applicable codes and standards, GSA PBS Core Building Standards, security and badging requirements, environmental survey requirements, fire/life safety requirements, submittal requirements, and closeout requirements.
The anticipated period of performance is 150 calendar days after notice to proceed. The solicitation is expected to include base bid work for the main building roof and envelope on the U.S. side, main building roof and envelope on the Canadian side, and water treatment building envelope work on the U.S. side. An in-person site visit is anticipated. Currently the date is TBD.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
Files (20)
- Download
Solicitation Package (47PD5526R0042 Amendment 0002).zip
1.7 MBAdded in Combined Synopsis/Solicitation version 8Posted - Download
T10- RFI 09302026.xlsx
28 KBAdded in Combined Synopsis/Solicitation version 8Posted - Requires SAM.gov sign-in
CRCI Updated Turner Roof Inspection Report 6-3-2022.pdf
18 MBAdded in Combined Synopsis/Solicitation version 8Posted - Requires SAM.gov sign-in
2024-07-26_GSA Turner_100 CD percent Project Manual.pdf
1.6 MBAdded in Combined Synopsis/Solicitation version 8Posted - Download
_079200 - JOINT SEALANTS.pdf
126 KBAdded in Combined Synopsis/Solicitation version 8Posted - Download
T10-Amendment 0001.pdf
569 KBAdded in Combined Synopsis/Solicitation version 3Posted - Requires SAM.gov sign-in
1_10-23-2023_TurnerLPOE_100 CD.pdf
63 MBAdded in Combined Synopsis/Solicitation version 2Posted - Download
Solicitation Package (47PD5526R0042).zip
1.2 MBAdded in Combined Synopsis/Solicitation version 1Posted - Requires SAM.gov sign-in
T02-Land Port of Entry Design Standard_December 2018 - Additional Appendices.pdf
24 MBAdded in Combined Synopsis/Solicitation version 1Posted - Requires SAM.gov sign-in
T02-FOUO_Land Port of Entry Design Standard_December 2018.pdf
23 MBAdded in Combined Synopsis/Solicitation version 1Posted - Requires SAM.gov sign-in
T02-Existing Roof Warranty.pdf
1.6 MBAdded in Combined Synopsis/Solicitation version 1Posted - Requires SAM.gov sign-in
T02-CBP Security Clearance Documents.docx
25 KBAdded in Combined Synopsis/Solicitation version 1Posted - Requires SAM.gov sign-in
T02-Camera Phasing Diagram.pdf
1.3 MBAdded in Combined Synopsis/Solicitation version 1Posted - Requires SAM.gov sign-in
T02-5_NCMMS Equipment Uploader Spreadsheet.xlsx
196 KBAdded in Combined Synopsis/Solicitation version 1Posted - Requires SAM.gov sign-in
T02-2_09-28__2023 Turner Climax_100_ Proj Manual.pdf
3.0 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
T10-Sol_SBSA_LPTA_MAY 2026.docx
2.1 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
T10-Agr_SBSA_GC_MAY 2026.docx
2.1 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
T10- SF1442-47PD5526R0042 Form.pdf
1.3 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
T05-Blaine-MT20260026 05182026.pdf
39 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
T02-Turner Roof_Building Envelope SOW 5_04_2026.pdf
348 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
Turner Roof and Building Envelope Project
- 2Version 2Combined Synopsis/SolicitationArchived
Turner Roof and Building Envelope Project
- 3Version 3Combined Synopsis/SolicitationArchived
MT0055AW, 34406, Roof and Building Envelope Modernization, Turner LPOE - Amendment 0001
- 4Version 4Combined Synopsis/SolicitationArchived
MT0055AW, 34406, Roof and Building Envelope Modernization, Turner LPOE - Amendment 0001
- 5Version 5Combined Synopsis/SolicitationArchived
MT0055AW, 34406, Roof and Building Envelope Modernization, Turner LPOE - Amendment 0001
- 6Version 6Combined Synopsis/SolicitationArchived
MT0055AW, 34406, Roof and Building Envelope Modernization, Turner LPOE - Amendment 0001
- 8Version 8Combined Synopsis/SolicitationArchivedCurrent
MT0055AW, 34406, Roof and Building Envelope Modernization, Turner LPOE - Amendment 0002
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
47PD5526R0042
Archive Date
Oct 7, 2026
Office Address
Washington, DC, 20405