MAGIS-100 Infrastructure Modifications
Archived on June 5, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM CDT
- Posted
- May 12, 2026
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 238220: Plumbing, Heating, and Air-Conditioning Contractors
- Agency
- Department of Energy
Notice details
- Office
- FERMILAB - DOE CONTRACTOR
- Place of performance
- Batavia, Illinois, 60510
- PSC
- Y1JZ: CONSTRUCTION OF MISCELLANEOUS BUILDINGS
- Last updated
- Oct 30, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- ISD_373244_DA
- Notice ID
- 49f99012d330401ab008a00f93bdf684
Description
On 5/12/26, Amendment 03 was issued to provide responses to questions from prospective offerors, provide partial as-built drawings, and provide revised documents. This Amendment also extends the RFP due date to 5:00pm CT on May 21, 2026. See attached files for more information.
On 5/5/26, Amendment 02 was issued to extend the RFP due date to 5:00pm CT on May 14, 2026.
On 4/15/26, Amendment 01 was issued to provide the attendance sheet from the pre-proposal meeting/site visit held on 4/8/26 – see attached files for more information.
Fermi National Accelerator Laboratory (FNAL) is requesting proposals for the demolition, re-installation, and relocation of ducts and piping to allow future installation of the MAGIS-100 experiement in the MINOS Service Building. The project is located on the Fermi National Accelerator Laboratory (Fermilab) Site, adjacent to the city of Batavia, Illinois. The project is in Kane County. Refer to the site map for the exact location of the Minos Building.
The Subcontractor shall furnish all required supervision, labor, materials, tools, and equipment necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings and technical specifications.
For more detailed information, please review the attached SOW entitled, “Construction Services for MAGIS-100 Infrastructure Modifications.”
Proposals are due 05/06/2026 at 5pm CT.
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
Files (34)
- Download
Amend 03 to RFP ISD_373244_DA.pdf
137 KBAdded in Solicitation version 5Posted - Download
QandA-MAGIS-100 - Fermi Responses 20260511.pdf
75 KBAdded in Solicitation version 5Posted - Download
NuMI MINOS Partial As-Built Drawings.pdf
3.7 MBAdded in Solicitation version 5Posted - Download
Exhibit T (REVISED) MAGIS-100_Drawings_Rev1.pdf
3.8 MBAdded in Solicitation version 5Posted - Download
SECTION 233113 (REVISED) - METAL DUCTS REV1.pdf
107 KBAdded in Solicitation version 5Posted - Download
Amend 02 to RFP ISD_373244_DA.pdf
121 KBAdded in Solicitation version 3Posted - Download
Amend 01 to RFP ISD_373244_DA.pdf
121 KBAdded in Solicitation version 2Posted - Download
Pre-Proposal Sign In Sheet_MAGIS-100.pdf
651 KBAdded in Solicitation version 2Posted - Download
1.0 Request for Proposal_ISD_373244_DA.pdf
344 KBAdded in Solicitation version 1Posted - Download
2.0 Price Proposal Form.pdf
1.5 MBAdded in Solicitation version 1Posted - Download
Business Visitor Registration Instructions and Directions-MAGIS100.pdf
157 KBAdded in Solicitation version 1Posted - Download
Exhibit A Statement_of_Work_MAGIS-100.pdf
147 KBAdded in Solicitation version 1Posted - Download
Exhibit B SECTION_010010_-_GENERAL_REQUIREMENTS.pdf
388 KBAdded in Solicitation version 1Posted - Download
Exhibit C SECTION_013100_-_ESH_Requirements.pdf
1.1 MBAdded in Solicitation version 1Posted - Download
Exhibit D SECTION_013300_-_Submittals.pdf
146 KBAdded in Solicitation version 1Posted - Download
Exhibit E SECTION_014100_-_QUALITY_REQUIREMENTS.pdf
809 KBAdded in Solicitation version 1Posted - Download
Exhibit F FFDG General Terms and Conditions for Construction (08.2025).pdf
320 KBAdded in Solicitation version 1Posted - Download
Exhibit G 2025 Construction Insurance Requirements.pdf
234 KBAdded in Solicitation version 1Posted - Download
Exhibit H Bid Bond FL-41.pdf
749 KBAdded in Solicitation version 1Posted - Download
Exhibit I Payment Bond FL-42_FFDG.pdf
737 KBAdded in Solicitation version 1Posted - Download
Exhibit J Performance Bond FL-40_FFDG.pdf
743 KBAdded in Solicitation version 1Posted - Download
Exhibit K Fermilab Subcontractor Safety Information Questionnaire.pdf
956 KBAdded in Solicitation version 1Posted - Download
Exhibit L SF1413_fill-ins.pdf
79 KBAdded in Solicitation version 1Posted - Download
Exhibit M PUR-466_Proposal Certifications_r5_10.14.25.pdf
476 KBAdded in Solicitation version 1Posted - Download
Exhibit N SARC_Subcontractor Annual RepsCerts Rev 8.pdf
476 KBAdded in Solicitation version 1Posted - Download
Exhibit O General Decision IL20260008 dated 2026_0109 Mod 1.pdf
910 KBAdded in Solicitation version 1Posted - Download
Exhibit P Sample FFP Subcontract.pdf
183 KBAdded in Solicitation version 1Posted - Download
Exhibit Q Director Safety Letter.pdf
81 KBAdded in Solicitation version 1Posted - Download
Exhibit R Fermilab Site Map-MINOS.pdf
3.0 MBAdded in Solicitation version 1Posted - Download
Exhibit S Summary of Required Solicitation Documents.pdf
183 KBAdded in Solicitation version 1Posted - Download
Exhibit T MAGIS-100_Drawings.pdf
3.6 MBAdded in Solicitation version 1Posted - Download
Exhibit U MAGIS-100 Tech_Specs.zip
1.0 MBAdded in Solicitation version 1Posted - Download
Exhibit V FESHM_4230_CONFINED_SPACES.pdf
359 KBAdded in Solicitation version 1Posted - Download
Exhibit W FESHM_7060_Fall_Protection_Program.pdf
354 KBAdded in Solicitation version 1Posted
Lifecycle
- 1Version 1SolicitationArchived
MAGIS-100 Infrastructure Modifications
- 2Version 2SolicitationArchived
MAGIS-100 Infrastructure Modifications
- 3Version 3SolicitationArchived
MAGIS-100 Infrastructure Modifications
- 5Version 5SolicitationArchivedCurrent
MAGIS-100 Infrastructure Modifications
Similar Opportunities
Additional Details
Solicitation Number
ISD_373244_DA
Archive Date
Jun 5, 2026
Office Address
Batavia, IL, 60510