Notice ID: e7bf94ae51e941c2b32065099ce8ad33Special NoticeArchived

Notice of Intent - Sole Source Procurement for Wells Control System Upgrade at Fort Drum

Archived on April 17, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM EDT
Posted
March 18, 2026
Notice type
Special Notice
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTH ATLANTIC.ENDIST NEW YORK.W2SD ENDIST NEW YORK
Place of performance
Fort Drum, New York, 13602
Last updated
Nov 2, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W912DS-26-S-0018
Notice ID
e7bf94ae51e941c2b32065099ce8ad33

Description

1.0 Introduction & Background

This document provides the justification for using other than full and open competition for the procurement of control system hardware, software, and integration services for the wells control system upgrade project at Fort Drum. The project requires the expansion and modernization of the existing Supervisory Control and Data Acquisition (SCADA) system controlling the facility's water wells.

The existing wells are operated by a proprietary control system. To maintain operational integrity, system stability, and cybersecurity posture, the new controls must seamlessly integrate with the incumbent manufacturer's platform. 

2.0 Justification for Other Than Full and Open Competition

2.1 Authority Cited

The proposed procurement is justified under the authority of FAR 6.302-1, "Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements." This authority is applicable because the required supplies and services must be procured from a specific manufacturer to ensure compatibility with the existing installed infrastructure, thereby avoiding substantial duplication of cost and unacceptable delays.

2.2 Description of Supplies/Services

The required supplies and services include proprietary programmable logic controllers (PLCs), input/output (I/O) modules, SCADA software licenses, and the associated engineering services for programming, configuration, and integration. These components must be fully compatible with the existing Fort Drum wells control system, which is based on the Trane platform. Only this manufacturer and its authorized representatives can provide the hardware, firmware, and software required to expand the system without compromising its integrity while maintaining the full functionality required by the Fort Drum licensed water operator.

2.3 Demonstration of Sole Source Necessity

The existing SCADA system for the wells at Fort Drum is a highly integrated and proprietary platform. Key components, including the central servers, communication protocols, and programming environment, are specific to the incumbent manufacturer. Awarding a contract to another source would prevent the new well controls from integrating into the existing system for the following reasons:

  • Proprietary Architecture: The system's communication bus and software are not open-protocol, preventing third-party controllers from being recognized or functioning within the established network.
  • Data Analysis: The system’s proprietary data analysis would be unable to fully integrate with non-Trane equipment.
  • Data & Alarm Consistency: An alternative system would be unable to integrate into the existing alarm, trending, and historical data logging schemas, creating operational inefficiencies and information gaps.
  • Cybersecurity: Introducing a different platform would require a completely new cybersecurity evaluation and Authority to Operate (ATO), creating a separate, less secure control network or a risky and unproven integration gateway.

2.4 Rationale for Substantial Duplication of Cost

Utilizing a different controls manufacturer would result in substantial duplication of costs that would not be recovered through competition. These sunk costs would include:

  • System Replacement: A wholesale replacement of the existing central SCADA servers, operator workstations, and network hardware would be required.
  • Reprogramming: All existing sequences of operation for the current wells would need to be reprogrammed and recommissioned on the new platform.
  • Operator Training: Facility operators would need to be retrained on an entirely new system, leading to lost productivity and the potential for operational errors.

These duplicated costs are estimated to far exceed any potential savings from a competitive procurement for the new expansion scope alone.

2.5 Rationale for Unacceptable Delays

Introducing an alternate controls brand would cause unacceptable delays to a mission-critical utility infrastructure project. Specific delays would include:

  • Extended Redesign: The control system architecture would require a complete redesign to accommodate a new platform.
  • Complex Integration & Testing: Significant time would be spent developing and testing a new integration method, with no guarantee of success.
  • Commissioning Delays: Commissioning and functional performance testing would be significantly extended to validate the performance of a non-standard, multi-vendor system.

These delays would jeopardize the project schedule and impact the operational readiness of the facility's water supply.

2.6 Market Research

Market research confirmed that while multiple vendors manufacture control systems, no other vendor can provide components that are fully and seamlessly compatible with the proprietary architecture of the installed system at Fort Drum. Research confirmed that any attempt to use an alternative would require the costly and time-consuming replacement of the existing system, validating the conclusion that only the incumbent manufacturer can meet the agency's requirements without causing unacceptable delays and cost duplication.

3.0 Conclusion

Based on the technical constraints of the existing proprietary system, the only viable path to meet the government's needs is to procure controls from the incumbent manufacturer. Therefore, a sole-source justification pursuant to FAR 6.302-1 is appropriate and necessary to ensure the successful, timely, and cost-effective completion of the Fort Drum wells control system upgrade.

Full description on SAM.gov

Award Overview

Mentioned in the description

From description, unverified
controls must seamlessly integrate with the incumbent manufacturer&#39;s platform.&nbsp;</p> <p>2.

We searched the solicitation description for the word “incumbent” and surfaced the surrounding text. This is not a confirmed match.

Contacts

Contracting Officer

Primary Contact

Documents

Files (2)

  • Trane NOI_Rev 1.docx

    18 KBAdded in Special Notice version 6Posted
    Download
  • Sources Sought -Wellfield.docx

    81 KBAdded in Sources Sought version 3Posted
    Download

Lifecycle

  1. 3
    Version 3Sources SoughtArchived

    Construction of the ERCIP Wellfield Expansion at Fort Drum, NY

    Notice 4f21265d6da04896b8aeb690bb041142 on SAM.gov

  2. 6
    Version 6Special NoticeArchivedCurrent

    Type changed from Sources Sought to Special Notice

    Notice of Intent - Sole Source Procurement for Wells Control System Upgrade at Fort Drum

    Notice e7bf94ae51e941c2b32065099ce8ad33 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
69%
Solicitation11/20/2026
Webbers Falls Excitation System Replacements, Webbers Falls, Oklahoma. *AM0001 - This Amendment provides pre-proposal site visit information, please review the attachment for details. *AM0002 - This Amendment provides specification, plans, and drawings updates resulting from answered Bidder Inquiries. A proposal due date extension has also been granted. Please review all attachments for full details. *AM0003 - This Amendment is to provide a revised specification sections and changes the Wage Determinations for this project. Please review all the attachments for full details.
68%
Solicitation11/05/2026
66%
AwardedOpen
Northwest Division Powerhouse Life Safety Upgrades Stage 1 The U.S. Army Corps of Engineers (USACE), Walla Walla District, intends to issue a single-phase solicitation on or about 30 November 2026 for a Construction Indefinite-Delivery, Indefinite-Quantity (IDIQ) Multiple-Award Task Order Contract (MATOC). The anticipated MATOC will provide construction services for renovation and upgrade projects at hydroelectric powerhouses located at large, remote civil works projects within the Northwestern Division. The primary area of performance is anticipated to include USACE Walla Walla District projects at McNary, Ice Harbor, Lower Monumental, Little Goose, Lower Granite, and Dworshak. Task orders may also include work at other USACE projects within the Pacific Northwest, including locations within the Seattle and Portland Districts in Washington, Oregon, Idaho, and Montana. The U.S. Army Corps of Engineers, Walla Walla District, anticipates awarding up to four (4) IDIQ MATOCs. At least one, and up to two, MATOCs will be reserved for award to qualified small business concerns. Task orders issued under the MATOCs will be firm-fixed-price. The aggregate shared contract capacity for all awarded MATOCs is anticipated to be $99 million. Each contract is anticipated to include a 36-month base period and two (2) 24-month option periods, exercisable at the Governments discretion. The Government may issue individual task orders with values up to $25,000,000. The Government reserves the right to issue additional solicitations and award additional contracts for the same or similar work within the geographic area covered by the MATOCs. The applicable North American Industry Classification System (NAICS) code is 237990, Other Heavy and Civil Engineering Construction. This notice is for informational purposes only and is not a solicitation. The solicitation is anticipated to be issued on or about 30 November 2026. Summary Scope of Work: The purpose of this IDIQ MATOC is to provide construction services to renovate and upgrade life-safety systems at large hydroelectric powerhouses located at large, remote civil works projects. These powerhouses may range in size from 75,000 square feet to 420,000 square feet and from 5 stories to 11 stories. The work may consist of the following major industrial construction elements for installation and/or modification: 1. Fire detection and mass notification alarm systems 2. Wet pipe, fine water mist, and clean agent sprinkler fire suppression system(s) 3. Smoke control system, including stair pressurization fans, smoke exhaust fans, motorized fire-smoke dampers, and complex logic and programming matrix digital controls 4. HVAC direct digital controls 5. HVAC ventilation and conditioning equipment, dampers, and ductwork 6. Fabricated steel stairs and guardrails 7. Architectural fire barrier walls, fire doors, safety glazing and finishes 8. Firestopping 9. Emergency and exit lighting systems 10. Electrical power supply and distribution 11. Precast concrete 12. Low-slope roofing 13. Specific aspects of this project that may be especially challenging include: a. Robust industrial safety protocols with rigorous lockout tagout procedures b. Construction in a continuously operating industrial environment c. Proximity to high voltage equipment and transmission lines d. Multiple underground levels with limited access e. Fire alarm designers and installers must be NICET Level III or IV certified f. Work in ceilings up to 60 feet high The project will involve the development and management of Contractor furnished submittals for items such as shop drawings, product data, commissioning plans, and contract close-out documentation as required by technical specifications of the task orders. Miscellaneous work within the project includes the delivery of Record Drawings. Placement of Task Orders. The actual amount of work to be performed and the time of such performance will be determined by a Contracting Officer who will issue written task orders. Prices will be requested and evaluated for each task order in accordance with FAR 16.505. The Government will evaluate price and past performance at a minimum but may include additional non-price factors. Each RFP will state the method of selection and any additional non-price factors. Whenever possible, award will be made without discussions. If discussions are required, each contractor included in the competitive range will be requested to provide a final proposal revision, unless eliminated from discussions. Important Note: The sam.gov response date listed elsewhere in this synopsis is for the sam.gov archive purposes only. It has no relationship to the actual proposal submission date. The proposal submission date will be contained in the solicitation and any solicitation amendments that are issued. When issued, the solicitation documents for this project will be available via sam.gov. No CDs OR HARD COPIES WILL BE AVAILABLE. Offerors are responsible for checking the reference page for any update(s) to the Notice. The Government is not responsible for any loss of Internet connectivity or for an offerors inability to access the document(s) posted at the referenced website. To obtain automatic notifications of updates to this solicitation, you MUST log in to sam.gov and add the solicitation to your watchlist. If you would like to list your firm so others can see you are an interested vendor, you must click the Add Me To Interested Vendors button in the listing for this solicitation on sam.gov.
65%
Pre-Solicitation01/08/2027
THIS IS A REQUEST FOR INFORMATION ANNOUNCEMENT ONLY This announcement is issued solely for market research purposes in accordance with Revolutionary FAR Overhaul (RFO) Part 10, Market Research. The U.S. Army Corps of Engineers (USACE), New York District, is seeking information regarding the interest, capability, and qualifications of firms that may be capable of performing the requirement described below. This RFI is for planning and informational purposes only. It does not constitute a solicitation, Request for Proposals (RFP), Invitation for Bids (IFB), or commitment by the Government to issue a solicitation or award a contract. Responses to this RFI are not offers and cannot be accepted by the Government to form a binding contract. The Government will not pay for, reimburse, or otherwise compensate respondents for costs associated with preparing or submitting information in response to this RFI. The Government does not intend to rank submissions or provide individual responses to interested firms. Information submitted and clearly marked as “Proprietary” will be handled accordingly. The U.S. Army Corps of Engineers, New York District is issuing this Request for Information (RFI) for an Indefinite Delivery/Indefinite Quantity, Single Award Task Order Contract (SATOC) to determine interest, capabilities, and qualifications to for Design-Build contractors. The NAICS codes for this procurement is 237990, Size Standard is $45 Million. The Request for Proposals is planned to be issued in the Spring of 2027 with construction to begin early in 2028. The estimated SATOC capacity is $70,000,000 with the anticipated Task Order magnitude between $10,000,000 and $25,000,000. Work under this contract is expected to begin in winter of 2028. The SATOC will be for contractor to replace/restore 2,800-foot seawall at the United States Merchant Marine Academy, Kings Point, NY. The project will be constructed within the access-controlled installation along the waterfront of the United States Merchant Marine Academy. Adjacent facilities will remain occupied during construction with minimal disruption to operations requiring precise construction planning. Work for this project is described below: 1. Project Purpose and Program Context USACE and USMMA have undertaken an agreement to modernize the campus in its entirety providing upgraded Barracks, Academic Buildings, Training Buildings, Athletic Facilities and Waterfront Spaces. The Seawall will serve to protect critical land side facilities essential to the education and training of Midshipmen from storm, wave action, and tidal erosion. ________________________________________ 2. Existing Conditions The existing seawall along the United States Merchant Marine Academy (USMMA) campus shoreline extends approximately 2,800 linear feet and is aligned generally north–south along the western waterfront. The seawall exhibits significant variability in height, construction type and functional purpose along with its length. At the northern end (north of Hague Basin), the shoreline protection system transitions through several construction types in sequence: beginning with a timber (wooden) bulkhead, followed by a stone and mortar wall, then reverting to a timber bulkhead and transitioning to a steel sheet pile bulkhead with a concrete cap. (See Attachment - USMMA Seawall Site Map) Within the Hague Basin, the shoreline structures consist primarily of steel sheet pile bulkheads and stone façade walls. Presume the stone façade walls incorporate a concrete core based on visual assessment. South of Hague Basin, the shoreline is predominantly stabilized by a concrete seawall with riprap protection, which further transitions to cast-in-place (poured) concrete only toward the southern extent. The southernmost seawall segment, segment 9, includes stabilizing the adjacent slope to address its instability, mitigate further erosion, and support a future 12 ft. wide roadway/walkway to connect existing roads on campus. ________________________________________ 3. Design and Construction Scope This project will rehabilitate/restore 2,800-feet of seawall at the United States Merchant Marine Academy. The scope includes progressing the government provided 35% design consisting of nine segments to 100% Design, completing all required permitting documents, reconstructing the seawall, and restoring the waterfront. The contractor will review, validate, and advance the government-furnished 35% Design RFP package to 65% and 100% Issued for Construction (IFC) submittals across civil, structural, coastal, and geotechnical disciplines. Following design finalization for a segment construction will commence to remove and/or restore the degraded segment of seawall. The contractor will be required to complete the work in accordance with all required permits, certifications and licenses required by Federal, State, and local law for the execution of this work. ________________________________________ 4. Design Standards and Performance Requirements All work will meet the USMMA Campus Design Guide and Engineering Design Standards which contain DOT standards including the International Building Code (IBC), GSA standards, and DoD Unified Facilities Criteria (UFC). ________________________________________ 5. Acquisition Strategy and Contracting Approach The Government intends to establish a Design-Build (D-B) Single Award Task Order Contract (SATOC) Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract with a total contract capacity of $70,000,000 over an anticipated five-year ordering period. INFORMATION REQUESTED FROM RESPONDENTS Areas of particular interest to the government are responses to the following questions: 1) Is your firm interested in competing for this project? If so, do you anticipate proposing as an integrated prime contractor/Designer of Record (DOR) team, a joint venture (JV), or a prime construction contractor with a subcontracted design firm? 2) Based on the anticipated scope (steel sheet pile, bulkhead replacement, concrete seawall replacement, splash pads, and drainage system replacement), what percentage of the construction work do you anticipate self-performing with your own labor and equipment versus subcontracting? 3) Describe your teams experience over the past 5–10 years designing and constructing coastal infrastructure or shoreline stabilization projects of similar scale (exceeding 2,000 linear feet) or projects involving multiple, distinct structural wall types within a single contract. 4) What is the largest existing bulkhead or seawall replacement contract (by total dollar value and approximate linear footage) that your firm has completed as the prime contractor and/or Designer of Record? (Please specify whether each project was executed as Design-Build or Design-Bid-Build). 5) In a Design-Build delivery model, how would your team approach executing in-water geotechnical borings in tidal Long Island Sound conditions? Do you possess the in-house marine equipment and personnel to perform this subsurface investigation, or would you subcontract it to a specialized marine geotechnical firm? 6) Given that the 2,800-foot seawall is divided into 9 distinct segments with varying construction types (e.g., sheet pile, gravity wall, revetment), what specific technical challenges or efficiencies do you foresee in transitioning between these different wall typologies? 7) Describe your experience obtaining and/or working in compliance with Clean Water Act Section 401 Water Quality Certifications through the New York State Department of Environmental Conservation (NYSDEC) and Section 404 permits through USACE Regulatory, including managing design and construction schedules around Long Island Sound tidal and seasonal in-water work windows. What other permits would you anticipate on this project? 8) To minimize shoreline exposure, tidal vulnerability, and site disruption, would you recommend designing and constructing the 9 segments sequentially, concurrently in clusters, or prioritized by existing structural degradation? Based on your recommended approach, what is your estimated overall duration (broken down by design/permitting vs. construction)? 9) Considering the varying geometry and coastal exposure of the 9 segments along Long Island Sound, do you anticipate utilizing land-based equipment, marine-based barges/vessels, or a hybrid approach for demolition, material delivery, and staging? What specific site access, staging, or upland constraints should the Government clarify or address in the Design-Build Request for Proposal (RFP)? 10) Describe your team’s in-house or sub-consultant capabilities to perform advanced coastal engineering and numerical modeling, including nearshore wave transformation, wave overtopping, toe scour, and sea-level change lifecycle analysis. Which specific modeling tools or field measurements (e.g., spectral wave models such as SWAN/STWAVE, Boussinesq models, or Acoustic Doppler Current Profiler [ADCP] current measurements) do you anticipate needing to support final design? 11) Describe your team’s experience managing complex marine geotechnical risks along Long Island Sound or similar coastal environments, specifically regarding Soil-Structure Interaction (SSI) modeling, lateral earth/hydrostatic loading, and global slope stability analysis in soft, saturated marine sediments or variable glacial till strata. 12) Based on your experience with coastal Design-Build solicitations, what specific baseline coastal, hydrographic, and geotechnical data (e.g., historical storm surge/water-level statistics, offshore wave hindcast data, recent bathymetric/topographic surveys, or preliminary boring logs) do you expect the Government to provide in the 35% RFP package so that your team can accurately price and propose on the project? 13) Assuming the Government provides regional water-level statistics and baseline offshore wave data in the 35% RFP, what site-specific numerical modeling (e.g., nearshore wave transformation, EurOtop wave overtopping, localized toe-scour analysis, or USACE Sea Level Change projections) would your team anticipate executing post-award to finalize the design across the 2,800-foot alignment? 14) Given the variable subsurface stratigraphy of Long Island Sound, what supplemental field investigations (e.g., Standard Penetration Test [SPT] borings, Cone Penetration Testing [CPT], laboratory testing) and geotechnical modeling (e.g., PLAXIS 2D/3D, SEEP/W seepage and piping analysis, or global slope stability) do you anticipate performing post-award to advance the 35% concept into a sealed, Issued-for-Construction (IFC) foundation and wall design? 15) How will regional regulatory moratoriums and site usage restrictions along Long Island Sound (e.g., Essential Fish Habitat [EFH] and winter flounder/anadromous fish spawning windows, protected avian nesting seasons, and peak summer recreational beach/waterway usage) impact your proposed mobilization, staging, and construction sequencing across the 9 segments? 16) Are there specific materials anticipated for this seawall replacement (e.g., marine-grade steel sheet piling compliant with federal domestic sourcing requirements, specialized corrosion coatings, custom precast concrete units, or specific armor stone gradations) that are currently experiencing extended fabrication lead times or significant price volatility? 17) What do you view as the top three technical, schedule, or commercial risks for this 9-segment Design-Build project (e.g., unforeseen subsurface boulders/obstructions in glacial till, coastal storm events during open excavation, or permitting/utility delays), and how can the Government best structure the RFP or allocate risk to mitigate them? INFORMATION REQUESTED FROM RESPONDENTS All interested, capable, qualified, and responsive firms are encouraged to reply to this announcement. The Government is requesting that interested firms furnish the following information in addition to responses to the questions above: Corporate Information 1. Company name, address, point of contact, telephone number, and e-mail address. 2. Geographical areas in which you are capable of servicing. 3. Business-size and socioeconomic status, as applicable: a. Small or large business firm as defined by SBA, or b. Certified HUBZone firm, or c. Service-Disabled Veteran Owned Small Business (SDVOSB) firm, or d. SBA certified 8(a) firms. 4. Contractor’s comments or recommendations. Please provide, if any. SUBMISSION INSTRUCTIONS Due Date: All responses must be submitted no later than the date and time specified on the first page of this RFI. Limit response to 5 pages. Format: Submissions should be in Adobe PDF format. The file name should be: [Company Name]_Response_RFI_W912DS-27-S-0008.pdf. Submission: Responses shall be submitted via email only to the following points of contact: Contract Specialist: Mohenda Surage at mohenda.r.surage@usace.army.mil Project Manager: Richard Gussenhoven at Richard.Gussenhoven@usace.army.mil
65%
Market Research12/04/2026

Additional Details

Solicitation Number

W912DS-26-S-0018

Archive Date

Apr 17, 2026

Office Address

NEW YORK, NY, 10278-0004