GovChime
Notice ID: ea1079b2c8634ecb828ad03ee4715775Combined Synopsis/SolicitationArchived

W912DW25Q8004 Mud Mountain Dam Crane Rental for Stoplog Picks

Archived on July 3, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:00 PM PDT
Posted
June 16, 2025
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
238990: All Other Specialty Trade Contractors
Agency
Department of WarDepartment of the Army

Notice details

Office
W071 ENDIST SEATTLE
Place of performance
Enumclaw, 98022
Last updated
Nov 13, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W912DW25Q8004
Notice ID
ea1079b2c8634ecb828ad03ee4715775

Description

REQUIREMENTS: The U.S. Army Corps of Engineers, Mud Mountain Dam has a requirement for 2 total crane picks on the upstream face. We are seeking a properly sized (see below) crane with operator to install/ remove metal stop logs. Access to the location has a steep grade and will take time to traverse in and out. Counterweights can be installed at the top of the dam; however, any additional counterweights will need to be brought down on a smaller truck as a tractor trailer cannot traverse the grade and switch backs. Photos are provided (see SOW attached) showing the stoplog lifting beam, access along the upstream side of the dam, and the location where the crane will operate. An additional photo shows a crane placing a stoplog. Contractor to verify all weights and radiuses prior to mobilization. A full walk through of all the lifts will be required prior to mobilization to ensure appropriate equipment is mobilized. Contractor will need to supply proper rigging gear to attach to the Govt provided lifting beam (shackles provided as seen in picture attached) at a weight of 104,00lbs (beam + largest stop log). Due to the inability to access the connection points, this beam is equipped with a pneumatic cylinder pin release mechanism and is required for all picks. Mud Mountain project personnel will operate this device. 1. Pick #1: Requirements for (3) Items - Install Tunnel Entrance Stoplogs (100k @ 40 ft approximately) Liebherr LTR 1060 or Similar (Telescopic Crawler Crane) Capable of lifting 100,000lbs at 40 Crane rental with operator, rigger, and rigging gear required to install 3 tunnel entrance stoplogs on R-3 intake at Mud Mountain Dam. Movement of crane, counterweights, and all other required equipment down to bottom of dam @ 960 deck and back up present an additional challenge due to grade of road. Stoplogs to be installed, weigh approx. - Bottom - 80,0001bs / Middle - 72,0001bs / Top - 52,000Ibs. (Clean and dry) Work to be done the week of 14 July 2025. 2. Pick #2: Requirements for (3) Items - Remove Tunnel Entrance Stoplogs (100k @ 40 ft Approximately) Liebherr LTR 1060 or Similar (Telescopic Crawler Crane) Capable of lifting 100,000lbs at 40 Crane rental with operator, rigger, and rigging gear required to remove 3 tunnel entrance stoplogs on R-3 intake at Mud Mountain Dam. Movement of crane, counterweights, and all other required equipment down to bottom of dam @ 960 deck and back up present an additional challenge due to grade of road. Stoplogs to be installed, weigh approx. - Bottom - 80,0001bs / Middle - 72,0001bs / Top - 52,000Ibs. (Clean and dry) Work to be done the first or second week of October 2025. SEE STATEMENT OF WORK (SOW) FOR FURTHER DETAILS **Amendment 1 - 6 June 2025: Required Response Date was incorrect on solicitation form, updated from 5 June to 18 June. ** **Amendment 2 - 16 June 2025: Answered questions recieved from the solicitation.**

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (4)

  • W912DW25Q8004 Amendment 0002.pdf

    386 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • W912DW25Q8004 Amendment 0001.pdf

    360 KBAdded in Combined Synopsis/Solicitation version 2Posted
    Download
  • W912DW25Q8004 MMD Crane Rental for Stoplog Picks.pdf

    1.6 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • SOW 2025 - MMD Stoplog Placement and Removal.pdf

    1.3 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationArchived

    W912DW25Q8004 Mud Mountain Dam Crane Rental for Stoplog Picks

    Notice 5089b2db7e3e4e25ab598bd8ad0af8fe on SAM.gov

  2. 2
    Version 2Combined Synopsis/SolicitationArchived

    W912DW25Q8004 Mud Mountain Dam Crane Rental for Stoplog Picks

    Notice 31ba24d8cd9344ee8f8bcc9f13e84259 on SAM.gov

  3. 5
    Version 5Combined Synopsis/SolicitationArchivedCurrent

    W912DW25Q8004 Mud Mountain Dam Crane Rental for Stoplog Picks

    Notice ea1079b2c8634ecb828ad03ee4715775 on SAM.gov

  4. 7
    Version 7Award NoticeArchived

    Type changed from Combined Synopsis/Solicitation to Award Notice

    W912DW25P8005 Mud Mountain Dam Crane Rental for Stoplog Picks

    Notice fa98e19381fe4200afd004f91c1392a2 on SAM.gov

Other notices for this solicitation

  1. Special NoticeRelated noticeMay 22, 2025

    Site Visit - Mud Mountain Dam Crane Rental for Stop Log Placement and Removal

    Notice 2dbe15dd205b480183438366849110ea on SAM.gov

  2. Special NoticeRelated noticeMay 27, 2025

    Site Visit - Mud Mountain Dam Crane Rental for Stop Log Placement and Removal

    Notice 6e59cf4923a14770b65ce75dc378a8e3 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912DW25Q8004

Archive Date

Jul 3, 2025