GovChime
Notice ID: 2a66030c6e84430ebfafb880fcc55cf3SolicitationArchived

NV FLAP 500(1) Red Rock Trail

Archived on May 14, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM MST
Posted
April 1, 2025
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of TransportationFEDERAL HIGHWAY ADMINISTRATION

Notice details

Office
6982AF CENTRAL FEDERAL LANDS DIVISI
Place of performance
Las Vegas, NV
Last updated
Nov 15, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
6982AF24B000016
Notice ID
2a66030c6e84430ebfafb880fcc55cf3

Description

PROJECT NUMBER: NV FLAP 500(1) PROJECT NAME: Red Rock Trail PROJECT DESCRIPTION: The Red Rock Trail project is in Las Vegas, Nevada in the outskirts of Summerlin and into the entrance of Red Rock Conservation Area. This project includes construction of a multi-use trail and pedestrian bridge along with reconstruction of State Highway 159 widening. SCOPE OF THE WORK: The project is located adjacent to the Red Rock Conservation Area which is a highly environmentally sensitive area. It includes construction of approximately 1 mile of paved multi-use trail, widening of State Highway 159 for additional turn lane width and construction of a 210-foot pedestrian bridge with drilled shafts. The project includes multiple Partners with Bureau of Land Management, Nevada Department of Transportation and Clark County Public Works. The project will be broken up into a Schedule A and an Option X. Schedule A includes all the trail and bridge. Option X includes work related to State Highway 159.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

Files (13)

  • Tabulation of Bids.pdf

    1.3 MBAdded in Solicitation version 14Posted
    Download
  • Bid Opening Summary Red Rock Trail.pdf

    114 KBAdded in Solicitation version 12Posted
    Download
  • QnA 01.10.25.pdf

    152 KBAdded in Solicitation version 12Posted
    Download
  • A003 Red Rock.pdf

    2.7 MBAdded in Solicitation version 12Posted
    Download
  • QnA 01.08.25.pdf

    149 KBAdded in Solicitation version 12Posted
    Download
  • A002 Red Rock.pdf

    1.5 MBAdded in Solicitation version 12Posted
    Download
  • A001 Red Rock.pdf

    7.3 MBAdded in Solicitation version 12Posted
    Download
  • QnA 12.20.24 Red Rock.pdf

    141 KBAdded in Solicitation version 12Posted
    Download
  • 6982AF24B000016 IFB .pdf

    6.5 MBAdded in Solicitation version 12Posted
    Download
  • NV_FLAP_500(1)_01.100 Plans_Stamped_new_flat.pdf

    35 MBAdded in Solicitation version 12Posted
    Download
  • NV_FLAP_500(1)_21.100 FINAL HYD Report_Stamped_flat.zip

    125 MBAdded in Solicitation version 12Posted
    Download
  • NV_FLAP_500(1)_20.100 FINAL GEO Report_Stamped_flat.zip

    44 MBAdded in Solicitation version 12Posted
    Download
  • FP-14.pdf

    4.0 MBAdded in Solicitation version 12Posted
    Download

Lifecycle

  1. 2
    Version 2PresolicitationArchived

    NV FLAP 500(1) Red Rock Trail

    Notice 93758ee8aecf466aac4a84ae77f8d83c on SAM.gov

  2. 4
    Version 4SolicitationArchived

    Type changed from Presolicitation to Solicitation

    NV FLAP 500(1) Red Rock Trail

    Notice 52d4425b316144e286f3dbb9314a5905 on SAM.gov

  3. 5
    Version 5SolicitationArchived

    NV FLAP 500(1) Red Rock Trail

    Notice b69301a438d1447987f11910f3edfdce on SAM.gov

  4. 6
    Version 6SolicitationArchived

    NV FLAP 500(1) Red Rock Trail

    Notice 859cd7994be545d2a0beb557f250f3bc on SAM.gov

  5. 7
    Version 7SolicitationArchived

    NV FLAP 500(1) Red Rock Trail

    Notice 53757c2592814c67964a009709205a65 on SAM.gov

  6. 8
    Version 8SolicitationArchived

    NV FLAP 500(1) Red Rock Trail

    Notice 7c5fa9ffa051415881f1f3f44d1ade92 on SAM.gov

  7. 9
    Version 9SolicitationArchived

    NV FLAP 500(1) Red Rock Trail

    Notice cb01f2969fa54b85a5573e5dc6b3ed6f on SAM.gov

  8. 11
    Version 11SolicitationArchived

    NV FLAP 500(1) Red Rock Trail

    Notice 38fb850fe5b24d4e9fb6c6ce1a84b279 on SAM.gov

  9. 12
    Version 12SolicitationArchived

    NV FLAP 500(1) Red Rock Trail

    Notice 27bbc96a398140558dc1a4c815e48808 on SAM.gov

  10. 14
    Version 14SolicitationArchivedCurrent

    NV FLAP 500(1) Red Rock Trail

    Notice 2a66030c6e84430ebfafb880fcc55cf3 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

6982AF24B000016

Archive Date

May 14, 2025

Office Address

LAKEWOOD, CO, 80228