Notice ID: 87a83a1c3c4441f3b1d42cf3adc7bffcSolicitationArchived
Renovate Suite 140, B1601 for Drug Demand Reduction (DDR) Facility
Archived on August 20, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM CDT
- Posted
- August 20, 2025
- Notice type
- Solicitation
- Set-aside
- SBA Certified Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15)
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- FA4819 325 CONS PKP
- Place of performance
- B1601 Tyndall AFB, FL, Tyndall AFB, 32403
- Last updated
- Nov 9, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- FA481925R0022
- Notice ID
- 87a83a1c3c4441f3b1d42cf3adc7bffc
Description
Renovate approximately 1,400 SF of finish interior space within B1601 to support Drug Demand Reduction (DDR). Room 140 will be altered to accommodate separate entry and exist points for admin and patients. All modifications to the Mechanical, Electrical, Plumbing, Fire Protection MEP/FP design systems will correlate with existing facility components.This is a Design-Build project to renovate B1601 for Drug Demand Reduction (DDR) Facility with a period of performance of 360 days, with 120 days for construction documents and 240 calendar days for construction, from date of Notice to Proceed receipt. The project is comprised of new work on Tyndall AFB and the related disciplines of work as specific tasks in Scope of Work. A. NAICS 236220 - Commercial and Institutional Building ConstructionB. The resulting contract will be a firm-fixed price contract. See section J for applicable attachments.C. This acquisition has been designated for procurement as a Woman Owned Small Business Set-aside and will be awarded via request for proposal IAW FAR Part 15.D. The project magnitude for this requirement is IAW FAR 36.204(e) between $500,000 and $1,000,000.E. Performance and Payment Bonds shall be obtained IAW FAR 28.102.F. The construction wage requirements statute (DAVIS-Bacon) FL20250005, Building applies to this project.G. The Period of Performance is 360 Calendar Days, with 120 days for construction documents and 240 calendar days for construction, after Notice to Proceed (NTP).H. A site visit will be conducted with the end user, contractor, CE and CONS as described in Section L.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Links (4)
- PIEE Solicitation Module Link for FA481925R0022piee.eb.milPosted
- Web Based Training for the PIEE Solicitation Modulepieetraining.eb.milPosted
- Registration Instructions for the PIEE Solicitation Modulewww.acq.osd.milPosted
- Department of Defense Procurement Toolboxdodprocurementtoolbox.comPosted
Lifecycle
- 1Version 1SolicitationArchived
Renovate Suite 140, B1601 for Drug Demand Reduction (DDR) Facility
- 2Version 2SolicitationArchived
Renovate Suite 140, B1601 for Drug Demand Reduction (DDR) Facility
- 4Version 4SolicitationArchivedCurrent
Renovate Suite 140, B1601 for Drug Demand Reduction (DDR) Facility
Other notices for this solicitation
- Pre-SolicitationRelated noticeJul 17, 2025
Design-Build Renovate B1601 for Drug Demand Reduction Program
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
FA481925R0022
Archive Date
Aug 20, 2026
Office Address
TYNDALL AFB, FL, 32403