Notice ID: b217fa420ac347c784052b4450f812b4Award NoticeAwardedArchived
Western Federal Lands Highway Division (WFLHD) Geotechnical Drilling Services BPA
Awarded on January 27, 2026. Full description on SAM.gov.
Awarded tounder 69056726A000002 (source: SAM.gov award notice)• $20.0M
Overview
- Posted
- January 28, 2026
- Notice type
- Award Notice
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 238910: Site Preparation Contractors
- Agency
- Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Notice details
- Office
- 690567 WESTERN FEDERAL LANDS DIV
- Last updated
- Nov 3, 2026
- First published
- Last updated on SAM.gov
- Award date
- Jan 27, 2026
- Award amount (SAM.gov award notice)
- $20.0M
Identifiers
- Solicitation number
- 69056726A000002
- Notice ID
- b217fa420ac347c784052b4450f812b4
- Award number (PIID)
- 69056726A000002
Description
BPA Award Notice for WFHLD Geotechnical Drilling Services
Award Overview
Award Number
69056726A000002
Award Amount (SAM.gov award notice)
$20.0M
Award Date
Jan 27, 2026
Awardee
Awardee UEI
CYDTJGJJUHD7
Awardee CAGE Code
1YG95
Awardee Address
Anchorage, AK 99501, UNITED STATES
Original Solicitation
Notice ID: b217fa420ac347c784052b4450f812b4
Posted Date: Jan 28, 2026
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $216.7KSigned May 14, 2026
- —Signed Jan 27, 2026
- $246.6KSigned Jul 21, 2025
- $246.6KSigned May 12, 2025
- $216.7KSigned Apr 8, 2025
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Angy Liljedahl
Documents
Lifecycle
- 2Version 2Combined Synopsis/SolicitationArchived
Western Federal Lands Highway Division (WFLHD) Geotechnical Drilling Services BPA
- 5Version 5Award NoticeArchivedCurrent
Type changed from Combined Synopsis/Solicitation to Award Notice
Western Federal Lands Highway Division (WFLHD) Geotechnical Drilling Services BPA
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The Western Federal Lands Highway Division (WFLHD) of the Federal Highway Administration (FHWA) is preparing a geotechnical subsurface exploration program for the Winchester Creek Bridge in Douglas County, Oregon. The primary goal is to assess the subsurface conditions for designing a replacement bridge structure. Agency partners include the U.S. Forest Service. The project is located at latitude N 43.6751° and longitude W 124.1788° in the northeast ¼ of the southwest ¼ of Section 7, Township 22 South, Range 12 West of the Bureau of Land Management (BLM) Public Land Survey System (PLSS). See attachments for full requirements. QA 11_04_2026 Uploaded 11-04-2026 Amendment A001 Posted 11-04-2026 | - | Combined Synopsis | 11/17/2026 |
Under an Interagency Agreement, the U.S. Department of Transportation John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the Federal Aviation Administration (FAA) Facilities Environmental Cleanup (ECU) Program. As part of this effort, a Remedial Action (RA) will be conducted at one facility in the FAA Eastern Service Area (ESA) to remove identified soil contamination. The site requiring remediation for lead- and polychlorinated biphenyl (PCB)-contaminated soils is QPI RCAG – Matawan, NJ (40.370895°,-74.220954°). The FAA’s ECU Program has identified the potential for environmental and human health risks and/or liability associated with the facility above based on prior research, known historic operations and practices, and required cleanup actions. The Contractor shall conduct all work in accordance with Federal, State, and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirement. The Contractor shall submit a draft Remediation and Restoration work plan (Work Plan) (where applicable) within ten (10) business days of the project kick-off meeting that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all contaminated soil remediation, disposal, and site restoration activities described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished information (GFI) for pertinent information. The removal quantities and depths in the Preliminary Assessment/Site Investigation and Remedial Investigation reports (if provided) are to be used as a guide along with the estimated total quantities listed in this SOW Section 2.2.2. The Work Plan shall describe methods and procedures for performing soil remediation, disposal, and restoration. Disposal methods must be detailed by the contractor for the site. FAA has consulted a Licensed Site Remediation Professional (LSRP), and the LSRP will select and approve all disposal facilities where waste and debris is to be shipped. Disposal sampling and paperwork is the responsibility of the contractor. Confirmatory sampling has already been conducted at the site. Additionally, the work plan shall also identify any required permits needed to perform the work. Futhermore, components required with the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a brief Risk Management Plan that identifies major risks and hazards on each site and discusses ways to minimize these risks. An outline summarizing the required content of the work plan is Technical Approach (Method and procedures for soil remediation, removal, disposal a. Identification of required work permits and b. Site Safety Health Plan (SSHP). Risk Management Plan a. Identification of major risks and b.Risk mitigation plan. The contractor should expect a 5-business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments. Contaminated Soil Remediation: Preliminary Assessment/Site Investigation (PA/SI) and Remedial Investigation (RI) activities completed between 2020 and 2025 found soils at the below site containing contamination above FAA’s action levels, which are based on U.S. Environmental Protection Agency (EPA) and/or New Jersey Residential Soil Remediation Standards. Examples include lead-in-soil concentrations above 200 mg/kg (ppm) or PCB-in-soil concentrations above 0.25 mg/kg. See SOW for greater details. | - | Combined Synopsis | 11/23/2026 |
EO 14398 Make ABAAS improvements and construct family restroom foundations at Fairholme Campground - OLYM | - | Awarded | Open |
| - | Awarded | Open | |
The Washington Air National Guard, 194th Wing at Camp Murray requires to complete government vehicle parking area and roadway surfaces at the new ASOG Complex, building 140. This project will include asphalt paving, concrete curbing, retaining wall construction, covered parking installation, and well as some lighting and security fence installation. Amendment 0003 is to update and correct some information to avoid confusion. See W50S9E26BA0002P00003 SF30 for list of changes. This update is to correct the closeout date and time for the solicitation module only, no other changes occured. | - | Solicitation | 10/15/2026 |
Additional Details
Solicitation Number
69056726A000002
Archive Date
Feb 11, 2026
Office Address
VANCOUVER, WA, 98661