Geotechnical Drilling Services for Project OR FLAP DOUGLAS 251(2), Winchester Bridge Replacement
Active, responses due . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM PST
- Posted
- November 4, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 238910: Site Preparation Contractors
- Agency
- Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Notice details
- Office
- 690567 WESTERN FEDERAL LANDS DIV
- Place of performance
- Oregon
- PSC
- F015: NATURAL RESOURCES/CONSERVATION- WELL DRILLING/EXPLORATORY
- Last updated
- Nov 4, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 69056727Q000006
- Notice ID
- d5133ebfbf594d868f11839d22af1488
Description
The Western Federal Lands Highway Division (WFLHD) of the Federal Highway Administration (FHWA) is preparing a geotechnical subsurface exploration program for the Winchester Creek Bridge in Douglas County, Oregon. The primary goal is to assess the subsurface conditions for designing a replacement bridge structure. Agency partners include the U.S. Forest Service.
The project is located at latitude N 43.6751° and longitude W 124.1788° in the northeast ¼ of the southwest ¼ of Section 7, Township 22 South, Range 12 West of the Bureau of Land Management (BLM) Public Land Survey System (PLSS).
See attachments for full requirements.
QA 11_04_2026 Uploaded 11-04-2026
Amendment A001 Posted 11-04-2026
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
Files (9)
- Download
Amendment A001.pdf
238 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
QA 11_04_2026.pdf
98 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
Attachment 005 FLH Rock Identification Guidelines_2025.pdf
9.6 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment 004 FLH Soil Identification Guidelines_2025.pdf
9.2 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment 001 Boring Location Map.pdf
2.8 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
RFQ 69056727Q000006.pdf
1.1 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment 006 Wage Determination.pdf
133 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment 003 Geotechnical Activities Categorical Exclusions.pdf
89 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment 002 Table of Borings.pdf
46 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/Solicitation
Geotechnical Drilling Services for Project OR FLAP DOUGLAS 251(2), Winchester Bridge Replacement
- 2Version 2Combined Synopsis/Solicitation
Geotechnical Drilling Services for Project OR FLAP DOUGLAS 251(2), Winchester Bridge Replacement
- 3Version 3Combined Synopsis/SolicitationCurrent
Geotechnical Drilling Services for Project OR FLAP DOUGLAS 251(2), Winchester Bridge Replacement
Similar Opportunities
Additional Details
Solicitation Number
69056727Q000006
Archive Date
Dec 2, 2026
Office Address
VANCOUVER, WA, 98661