GovChime
Notice ID: e929fe6a5c9d4c3692f93a60b29fdb97Solicitation

SD FLAP SDGFP PARKING(1) North Point Parking Lot

Archived on July 19, 2026. Solicitation posted by TRANSPORTATION, DEPARTMENT OF (FEDERAL HIGHWAY ADMINISTRATION) on July 8, 2026. Solicitation 6982AF26B000005.

NAICS 237310 (Highway, Street, and Bridge Construction). Set-aside: No Set aside used. Place of performance: Pickstown, South Dakota. Original response deadline: . Full description on SAM.gov.

Description

PROJECT DESCRIPTION: The proposed scope of this project includes reconstruction of the pavement within a parking lot servicing the boat ramp in the North Point Recreation Area near Pickstown, South Dakota. The project will address deteriorated pavement and sub-base for the 98,000 square-foot parking lot on the east side of the North Bay just upstream of the Fort Randall dam on the Missouri River. The project will provide a new pavement surface for the parking area while maintaining the operational qualities of this popular summer boat launch area. SCOPE OF THE WORK: The project will consist of removal of excavating the existing parking lot’s asphalt and base to a depth of 9.5-inches and placement of a 3.5-in asphalt pavement on 6-inches of aggregate base. Subexcavation work includes removing poor subgrade soils in the area. Parking lot slopes will match existing conditions with minor adjustments made to create an American Disabilities Act compliant handicap parking stall. A concrete pad for a dumpster and signing and striping are also included in the project. The parking lot will be closed during construction activities. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 5,700 CUYD 20402-0000 Subexcavation: 3,000 CUYD 30202-2000 Roadway Aggregate, Method 2: 3,800 TON 40301-0000 Asphalt Concrete Pavement, 2,300 TON

Full description on SAM.gov

Overview

Agency:
Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Office:6982AF CENTRAL FEDERAL LANDS DIVISI
Posted:July 8, 2026
NAICS:237310: Highway, Street, and Bridge Construction
Last Updated:Sep 25, 2026
PSC:Y1LB: CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Response Deadline:
Set-Aside:No Set aside used
Type:Solicitation
Place of Performance:Pickstown, South Dakota, 57367

Award Overview

Possible prior contracts

Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).

Contacts

Contracting Officer

Primary Contact

Stephanie Navarro

Secondary Contact

Documents

Select documents to download

Showing 10 of 12 items

Document
Source
Agency
Posted Date
File Size
Actions
SolicitationFEDERAL HIGHWAY ADMINISTRATIONJul 8, 20263.59 MB
SolicitationFEDERAL HIGHWAY ADMINISTRATIONJul 8, 202615.89 MB
Design Physical Data and Reports.zip
SolicitationFEDERAL HIGHWAY ADMINISTRATIONJul 8, 2026376.61 KB
SolicitationFEDERAL HIGHWAY ADMINISTRATIONJul 8, 20265.74 MB
SD FLAP SDGFP AD Plans.pdf
SolicitationFEDERAL HIGHWAY ADMINISTRATIONJul 8, 202641.62 MB
23.100 Floodplain Development Memo.pdf
SolicitationFEDERAL HIGHWAY ADMINISTRATIONJul 8, 202637.2 MB
SolicitationFEDERAL HIGHWAY ADMINISTRATIONJul 8, 202672.12 KB
SolicitationFEDERAL HIGHWAY ADMINISTRATIONJul 8, 2026209.65 KB
SolicitationFEDERAL HIGHWAY ADMINISTRATIONJul 8, 2026328.56 KB
SolicitationFEDERAL HIGHWAY ADMINISTRATIONJul 8, 2026150.21 KB

Showing 1 to 10 of 12 results

Lifecycle

Solicitation:6982AF26B000005
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 8×
    SolicitationCurrentApr 17, 2026

    SD FLAP SDGFP PARKING(1) North Point Parking Lot

    Notice e929fe6a5c9d4c3692f93a60b29fdb97 on SAM.gov

Similar Opportunities

Title
Phase
Agency
NAICS
Set Aside
Posted
Deadline
Location
INVITATION FOR BID (IFB) FULL AND OPEN COMPETITION WITH HUBZONE PREFERENCE PROJECT NUMBER: ND NP THRO 204(1) PROJECT NAME: Buck Hill Road PROJECT DESCRIPTION: Buck Hill Road, also known as Route 204, is located in Billings County within Theodore Roosevelt (THRO) National Park (NP) in the southeast portion of the park near the South Unit, Medora, ND. The route is located in mountainous terrain at approximate elevation of 2,500 to 2,800 feet. It begins at the intersection of Buck Hill Road and South Unit Scenic Loop Road. The route then proceeds southeasterly for approximately ¾ of a mile and ascends approximately 300 feet vertically to the Buck Hill Overlook parking area. The route is located entirely within Theodore Roosevelt NP. There is one (1) base schedule and no options. SCOPE OF THE WORK: The project includes three major components; 1) Approximately ¾ mile of roadway rehabilitation, 2) Approximately 1,000 linear feet of deep subexcavation to address an existing landslide, and 3) Reconstructing the existing Buck Hill Overlook parking lot. The main roadway rehabilitation includes pulverization of the existing roadway, placement of new roadway aggregate, and new hot asphalt concrete pavement and replacing existing guardrail with new guardrail. Additionally, this work includes constructing new paved ditches and installing concrete curb and gutter along most of the length of the roadway. This includes installation of several drainage inlets and culverts as well as new striping and signage. The deep subexcavation work includes removal of approximately existing unsuitable material to a 10 feet depth for a continuous 1,000 linear foot length of roadway and replacing with suitable material with geosynthetic reinforcement and installing subsurface drainage. A geotechnical report will be provided with the PS&E package. Reconstructing the existing Buck Hill Overlook parking lot expands and adds more parking spaces and accommodates larger trucks, recreational vehicles, and tour buses. The work includes removing the existing pavement, placing embankment material, new aggregate base, and new hot asphalt concrete pavement. This work also includes constructing accessible parking, placing new concrete sidewalk and curb and gutter, and striping and signage. New trash receptacles and stone benches will be installed as part of the new parking area. Buck Hill Road may be closed for the duration of construction. PRINCIPAL WORK ITEMS: Approximate quantities for major work items: 11,000 cubic yards of subexcavation 1,000 linear feet of geocomposite sheet drain 2,000 tons of hot asphalt concrete pavement 5,000 tons of roadway aggregate 550 linear feet of 24-inch pipe culvert (thick walled HDPE, fused) 5,100 linear feet of concrete curb and gutter (tan and onyx colored) 650 square yards of concrete sidewalk (tan colored) 1,600 linear feet of guardrail ANTICIPATED SCHEDULE: Advertisement – October 2026 Award - January 2027 Construction – April 2027 through November 2027 ESTIMATED COST RANGE: Between $5,000,000 and $10,000,000
Solicitation237310No Set-Aside10/14/202611/03/2026Medora, ND
Sealed bids from all business concerns will be accepted for the Natchez Trace Parkway, Project MS NP NATR 3F26, Solicitation Number 693C73-27-B-000001, located in Chickasaw County, Mississippi. The project consists of resurfacing the Parkway, including ramps, bridges, intersections and parking/pull-off areas. The work includes milling, asphalt overlay, shoulder widening, spot reconstruction, pavement markings, raised profile striping at bridge approaches, and other miscellaneous work. The project will be split into multiple work schedules/contract options, with the cost of the entire project expected to fall within the price range of $10,000,000 to $12,000,000. Bid documents should be issued on or about September 17, 2026. Bid due date and location will be specified on the SF 1442, Block 13a of the Solicitation. Use Internet address https://www.sam.gov (click on Contract Opportunities, then type “693C73” in the Search Contract Opportunities box and click the search button and all available projects will be listed) to check for the availability of advertisement documents. All documents can be directly downloaded from this website. Solicitation documents will not be mailed. Register to receive email notifications to be automatically notified when a document is added or updated for a specific project. If firms do not register as an interested vendor at this website, there will be no Interested Vendors List. Please send all questions concerning construction projects to eflhd.contracts@dot.gov. Include the solicitation number, project name and number, requesting firm and address, a point of contact and telephone number. Requests for 'faxing' or overnight mailing will not be accepted. IMPORTANT SAM REGISTRATION AND PAYMENT REQUIREMENTS In accordance with Federal Acquisition Regulation (FAR) 52.204-7 (DEVIATION NOV 2025), prospective contractors shall have an active Federal Government contracts registration in the System for Award Management (SAM) when submitting an offer in response to this solicitation and at the time of award. To register in SAM, go to https://www.sam.gov. Annual contractor representations and certifications must be completed online at https://www.sam.gov. Also, FAR 52.232-33 requires SAM registration for payment. The required annual Form VETS-4212 must also be completed online at http://www.dol.gov/vets/vets4212.htm per FAR 52.222-37. IMPORTANT SUBCONTRACTING PLAN REQUIREMENTS Required from all “other than small business” when the requirement is expected to exceed $900,000 ($2,000,000 for construction) [FAR 19.109]. Contracting Officer, Contracting Officer’s Representative, and Small Business Specialist are responsible for approving a reasonable and realistic plan [FAR 19.206-3] [TAM 1219.201(e)(6)]. Legislated subcontracting goals are 43.02% - Small Businesses (SB), 5% - Small Disadvantaged Businesses (SDB), 5% - Women-Owned Small Business Entities (WOSB), 3% - HUBZone, 5% - Service-Disabled Veteran-Owned Small Businesses (SDVOSB). A copy of each subcontracting plan (or contractor statement that no subcontracts are to be awarded) must be provided to Eastern Federal Lands and approved by the Office of Small Disadvantaged Business Utilization prior to close of negotiations (or award of the IFB) [TAM 1219.705-5 and -6]. PLEASE NOTE For security reasons, individuals requiring access to all government buildings must present a valid photo ID and be escorted to their destination by a Government employee. All visitors attending bid openings are urged to arrive at least 1 hour prior to a scheduled bid opening. All visitors must sign in at the main entrance of the Quantum Park facility and wait to be escorted by a Government employee to Eastern Federal Lands Highway Division (EFLHD) in Suite 200. Visitors must then register with the EFLHD Receptionist. A Government employee will collect all bids. Prior to the bid opening, a Government employee will escort all bidders to the bid opening. Unescorted visitors will be denied entry and no exceptions will be made. Bidders are encouraged to submit bids electronically per the instructions provided in the solicitation.
Solicitation237310No Set-Aside10/08/202610/20/2026-
INVITATION FOR BID (IFB) FULL AND OPEN COMPETITION WITH HUBZONE PREFERENCE PROJECT NUMBER: ND NP THRO 204(1) PROJECT NAME: Buck Hill Road PROJECT DESCRIPTION: Buck Hill Road, also known as Route 204, is located in Billings County within Theodore Roosevelt (THRO) National Park (NP) in the southeast portion of the park near the South Unit, Medora, ND. The route is located in mountainous terrain at approximate elevation of 2,500 to 2,800 feet. It begins at the intersection of Buck Hill Road and South Unit Scenic Loop Road. The route then proceeds southeasterly for approximately ¾ of a mile and ascends approximately 300 feet vertically to the Buck Hill Overlook parking area. The route is located entirely within Theodore Roosevelt NP. There is one (1) base schedule and no options. SCOPE OF THE WORK: The project includes three major components; 1) Approximately ¾ mile of roadway rehabilitation, 2) Approximately 1,000 linear feet of deep subexcavation to address an existing landslide, and 3) Reconstructing the existing Buck Hill Overlook parking lot. The main roadway rehabilitation includes pulverization of the existing roadway, placement of new roadway aggregate, and new hot asphalt concrete pavement and replacing existing guardrail with new guardrail. Additionally, this work includes constructing new paved ditches and installing concrete curb and gutter along most of the length of the roadway. This includes installation of several drainage inlets and culverts as well as new striping and signage. The deep subexcavation work includes removal of approximately existing unsuitable material to a 10 feet depth for a continuous 1,000 linear foot length of roadway and replacing with suitable material with geosynthetic reinforcement and installing subsurface drainage. A geotechnical report will be provided with the PS&E package. Reconstructing the existing Buck Hill Overlook parking lot expands and adds more parking spaces and accommodates larger trucks, recreational vehicles, and tour buses. The work includes removing the existing pavement, placing embankment material, new aggregate base, and new hot asphalt concrete pavement. This work also includes constructing accessible parking, placing new concrete sidewalk and curb and gutter, and striping and signage. New trash receptacles and stone benches will be installed as part of the new parking area. Buck Hill Road may be closed for the duration of construction. PRINCIPAL WORK ITEMS: Approximate quantities for major work items: 11,000 cubic yards of subexcavation 1,000 linear feet of geocomposite sheet drain 2,000 tons of hot asphalt concrete pavement 5,000 tons of roadway aggregate 550 linear feet of 24-inch pipe culvert (thick walled HDPE, fused) 5,100 linear feet of concrete curb and gutter (tan and onyx colored) 650 square yards of concrete sidewalk (tan colored) 1,600 linear feet of guardrail ANTICIPATED SCHEDULE: Advertisement – October 2026 Award - January 2027 Construction – April 2027 through November 2027 ESTIMATED COST RANGE: Between $5,000,000 and $10,000,000
Solicitation237310No Set-Aside10/07/202611/03/2026Medora, ND
PROJECT NUMBER: UT NP ARCH 100(2) PROJECT NAME: Bridges on Delicate Arch Road PROJECT DESCRIPTION: Delicate Arch Road (DAR) is within Arches National Park (Park) and provides access to Delicate Arch. DAR is a functional class 1 roadway (Principal Park Road) and is heavily traveled by visitors and often congested during periods with moderate-to-high levels of visitation. DAR crosses three low-gradient ephemeral washes (Salt Valley Wash, Salt Wash, and Winter Camp Wash) near their confluence in the Salt Wash Basin downstream of Wolfe Ranch. Culverts installed during original road construction in the mid-1990s and during subsequent upgrades are inadequate to allow unobstructed stream flow and sediment transport downstream. This existing condition produces flooding and sediment deposition, which creates unsafe conditions for visitors, triggers road closures, potentially strands Park visitors, diminishes visitor experience of the Park, and generates high operational costs associated with traffic management, visitor safety, and cleanup operations. SCOPE OF THE WORK: This project will be designated as Reconstruction (4R) with one segment of restoration (3R), and will design and construct 100&rsquo; span concrete bridges at the Salt Valley Wash, Salt Wash, and Winter Camp Wash. The DA roadway profile at each Wash will be raised to accommodate a 10-year design frequency and allow a medium-sized excavator to access each wash. The DA will be realigned at the Salt Valley wash, moving the roadway and new bridge location to the north of the existing roadway and drainage crossing. The remaining 3R sections of the roadway will receive full depth reclamation (FDR) or removal of pavement, including all parking areas, followed by a 4-inch pavement overlay. PRINCIPAL WORK ITEMS: 20420-0000 Embankment Construction: 10,000 CUYD 25101-0300 Placed Riprap, Class 3: 1,725 CUYD 30202-2000 Roadway Aggregate, Method 2: 5,140 TON 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, 1/2-Inch or 3/4-Inch Nominal Maximum Size Aggregate, 0.3 To <3 Million ESAL: 8,300 TON 55201-0200 Structural Concrete, Class A (AE): 752 CUYD 55401-2000 Reinforcing Steel, Epoxy Coated: 138,000 LB 55601-1100 Bridge Railing, Steel, Two Rail: 642 LNFT 56501-0200 Drilled Shaft, 24-Inch Diameter: 750 LNFT 56501-0300 Drilled Shaft, 30-Inch Diameter: 890 LNFT 60901-1300 Curb, Concrete, 15-Inch Depth (Reinforced, Colored): 3,921 LNFT 61701-4500 Guardrail System Mgs, Type 2, Class A Steel Posts: 1,290 LNFT 63506-0500 Temporary Traffic Control, Flagger: 5,800 HOUR ANTICIPATED SCHEDULE: Advertisement – September 2026 Award – November 2026 NTP – December 2026 Contract Completion – December 2028 ESTIMATED COST RANGE: Total estimated cost between $10,000,000 and $20,000,000 This will be solicited as a full and open competition.
Solicitation237310No Set-Aside10/06/202611/10/2026Moab, UT
INVITATION FOR BID (IFB) FULL AND OPEN COMPETITION WITH HUBZONE PREFERENCE PROJECT NUMBER: ND NP THRO 204(1) PROJECT NAME: Buck Hill Road PROJECT DESCRIPTION: Buck Hill Road, also known as Route 204, is located in Billings County within Theodore Roosevelt (THRO) National Park (NP) in the southeast portion of the park near the South Unit, Medora, ND. The route is located in mountainous terrain at approximate elevation of 2,500 to 2,800 feet. It begins at the intersection of Buck Hill Road and South Unit Scenic Loop Road. The route then proceeds southeasterly for approximately &frac34; of a mile and ascends approximately 300 feet vertically to the Buck Hill Overlook parking area. The route is located entirely within Theodore Roosevelt NP. There is one (1) base schedule and no options. SCOPE OF THE WORK: The project includes three major components; 1) Approximately &frac34; mile of roadway rehabilitation, 2) Approximately 1,000 linear feet of deep subexcavation to address an existing landslide, and 3) Reconstructing the existing Buck Hill Overlook parking lot. The main roadway rehabilitation includes pulverization of the existing roadway, placement of new roadway aggregate, and new hot asphalt concrete pavement and replacing existing guardrail with new guardrail. Additionally, this work includes constructing new paved ditches and installing concrete curb and gutter along most of the length of the roadway. This includes installation of several drainage inlets and culverts as well as new striping and signage. The deep subexcavation work includes removal of approximately existing unsuitable material to a 10 feet depth for a continuous 1,000 linear foot length of roadway and replacing with suitable material with geosynthetic reinforcement and installing subsurface drainage. A geotechnical report will be provided with the PS&E package. Reconstructing the existing Buck Hill Overlook parking lot expands and adds more parking spaces and accommodates larger trucks, recreational vehicles, and tour buses. The work includes removing the existing pavement, placing embankment material, new aggregate base, and new hot asphalt concrete pavement. This work also includes constructing accessible parking, placing new concrete sidewalk and curb and gutter, and striping and signage. New trash receptacles and stone benches will be installed as part of the new parking area. Buck Hill Road may be closed for the duration of construction. PRINCIPAL WORK ITEMS: Approximate quantities for major work items: 11,000 cubic yards of subexcavation 1,000 linear feet of geocomposite sheet drain 2,000 tons of hot asphalt concrete pavement 5,000 tons of roadway aggregate 550 linear feet of 24-inch pipe culvert (thick walled HDPE, fused) 5,100 linear feet of concrete curb and gutter (tan and onyx colored) 650 square yards of concrete sidewalk (tan colored) 1,600 linear feet of guardrail ANTICIPATED SCHEDULE: Advertisement – October 2026 Award - January 2027 Construction – April 2027 through November 2027 ESTIMATED COST RANGE: Between $5,000,000 and $10,000,000
Solicitation237310No Set-Aside10/01/202611/03/2026Medora, ND

Additional Details

Solicitation Number

6982AF26B000005

Archive Date

Jul 19, 2026

Office Address

LAKEWOOD, CO, 80228