PROJECT NUMBER: UT NP ARCH 100(2)

PROJECT NAME: Bridges on Delicate Arch Road

PROJECT DESCRIPTION: 

Delicate Arch Road (DAR) is within Arches National Park (Park) and provides access to Delicate Arch. DAR is a functional class 1 roadway (Principal Park Road) and is heavily traveled by visitors and often congested during periods with moderate-to-high levels of visitation.

DAR crosses three low-gradient ephemeral washes (Salt Valley Wash, Salt Wash, and Winter Camp Wash) near their confluence in the Salt Wash Basin downstream of Wolfe Ranch. Culverts installed during original road construction in the mid-1990s and during subsequent upgrades are inadequate to allow unobstructed stream flow and sediment transport downstream. This existing condition produces flooding and sediment deposition, which creates unsafe conditions for visitors, triggers road closures, potentially strands Park visitors, diminishes visitor experience of the Park, and generates high operational costs associated with traffic management, visitor safety, and cleanup operations.

SCOPE OF THE WORK: 

This project will be designated as Reconstruction (4R) with one segment of restoration (3R), and will design and construct 100’ span concrete bridges at the Salt Valley Wash, Salt Wash, and Winter Camp Wash. The DA roadway profile at each Wash will be raised to accommodate a 10-year design frequency and allow a medium-sized excavator to access each wash. The DA will be realigned at the Salt Valley wash, moving the roadway and new bridge location to the north of the existing roadway and drainage crossing. The remaining 3R sections of the roadway will receive full depth reclamation (FDR) or removal of pavement, including all parking areas, followed by a 4-inch pavement overlay. 

PRINCIPAL WORK ITEMS:

  • 20420-0000 Embankment Construction: 10,000 CUYD
  • 25101-0300 Placed Riprap, Class 3: 1,725 CUYD
  • 30202-2000 Roadway Aggregate, Method 2: 5,140 TON
  • 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, 1/2-Inch or 3/4-Inch Nominal Maximum Size Aggregate, 0.3 To <3 Million ESAL: 8,300 TON
  • 55201-0200 Structural Concrete, Class A (AE): 752 CUYD
  • 55401-2000 Reinforcing Steel, Epoxy Coated: 138,000 LB
  • 55601-1100 Bridge Railing, Steel, Two Rail: 642 LNFT
  • 56501-0200 Drilled Shaft, 24-Inch Diameter: 750 LNFT
  • 56501-0300 Drilled Shaft, 30-Inch Diameter: 890 LNFT
  • 60901-1300 Curb, Concrete, 15-Inch Depth (Reinforced, Colored): 3,921 LNFT
  • 61701-4500 Guardrail System Mgs, Type 2, Class A Steel Posts: 1,290 LNFT
  • 63506-0500 Temporary Traffic Control, Flagger: 5,800 HOUR

ANTICIPATED SCHEDULE: 

Advertisement – September 2026

Award – November 2026

NTP – December 2026

Contract Completion – December 2028

ESTIMATED COST RANGE: 

Total estimated cost between $10,000,000 and $20,000,000

This will be solicited as a full and open competition.

Full description on SAM.gov

Overview

Agency:
Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Office:6982AF CENTRAL FEDERAL LANDS DIVISI
Posted:October 22, 2026
NAICS:237310: Highway, Street, and Bridge Construction
Last Updated:Oct 22, 2026
First published:
Last updated on SAM.gov:
PSC:Y1LB: CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Set-Aside:No Set aside used
Type:Solicitation
Place of Performance:Moab, Utah, 84532

Award Overview

Possible prior contracts

Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (16)

  • Amendment A001.pdf

    295 KBAdded in Solicitation version 6Posted
    Download
  • QnA 10.15.26.pdf

    106 KBAdded in Solicitation version 5Posted
    Download
  • Sign-in Sheet.pdf

    124 KBAdded in Solicitation version 5Posted
    Download
  • UT NP ARCH 100(2) Pre-Show Powerpoint 10-8-2026.pdf

    31 MBAdded in Solicitation version 5Posted
    Download
  • 6982AF27B000005.pdf

    4.4 MBAdded in Solicitation version 3Posted
    Download
  • UT NP ARCH 100(2) - PLANS.pdf

    143 MBAdded in Solicitation version 3Posted
    Download
  • UT PRA ARCH 100(1) As-Builts.pdf

    7.4 MBAdded in Solicitation version 3Posted
    Download
  • UT NP ARCH 100(2) - Cross Sections-Option Y.pdf

    2.7 MBAdded in Solicitation version 3Posted
    Download
  • UT NP ARCH 100(2) - Cross Sections-Option X.pdf

    5.8 MBAdded in Solicitation version 3Posted
    Download
  • UT NP ARCH 100(2) - Cross Sections-Schedule A.pdf

    15 MBAdded in Solicitation version 3Posted
    Download
  • UT.NP.ARCH.100(2).Bridges on Delicate Arch Road.Geotech Rpt FINAL.February 2025.pdf

    49 MBAdded in Solicitation version 3Posted
    Download
  • UT NP ARCH100(2) Bridges on Delicate Arch Road Final Hydraulics Report_Signed.pdf

    15 MBAdded in Solicitation version 3Posted
    Download
  • UT NP ARCH 100(2) Bridges on Delicate Arch Road Pavement Memo.pdf

    251 KBAdded in Solicitation version 3Posted
    Download
  • UT NP ARCH 100(2) Physical Data.zip

    35 MBAdded in Solicitation version 3Posted
    Download
  • UT NP ARCH 100(2) Bridges on Delicate Arch Road-Delineators-JOFOC.pdf

    110 KBAdded in Solicitation version 3Posted
    Download
  • Site Visit Notice.pdf

    91 KBAdded in Presolicitation version 4Posted
    Download

Lifecycle

  1. 4
    Version 4PresolicitationArchived

    UT NP ARCH 100(2) Bridges on Delicate Arch Road

    Notice e7f22f34b4084bc4a51cbe7efcdf7158 on SAM.gov

  2. 2
    Version 2Solicitation

    Type changed from Presolicitation to Solicitation

    UT NP ARCH 100(2) Bridges on Delicate Arch Road

    Notice e8bc65bff25a4308ba8f551f74459ef7 on SAM.gov

  3. 3
    Version 3Solicitation

    UT NP ARCH 100(2) Bridges on Delicate Arch Road

    Notice af685a99d2ee4c27bb5ee208f29a097a on SAM.gov

  4. 5
    Version 5Solicitation

    UT NP ARCH 100(2) Bridges on Delicate Arch Road

    Notice 98f2b984a52d48129a35f56b3c6cc43d on SAM.gov

  5. 6
    Version 6SolicitationCurrent

    UT NP ARCH 100(2) Bridges on Delicate Arch Road

    Notice 5e8ded2c1748433f991428d1a4ed3a71 on SAM.gov

Similar Opportunities

Title
Phase
Agency
NAICS
Set Aside
Posted
Deadline
Location

Additional Details

Solicitation Number

6982AF27B000005

Archive Date

Jan 1, 2027

Office Address

LAKEWOOD, CO, 80228