GovChime
Notice ID: ab713ee42b444003a9d5876b694a874dCombined Synopsis/SolicitationArchived

Rock Creek Road Maintenance

Archived on April 25, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM CDT
Posted
March 12, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
USDA-FS, CSA SOUTHWEST 7
Place of performance
Tres Piedras, New Mexico, 87577
PSC
Z1LB: MAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
Last updated
Nov 2, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
127EAX26Q0014
Notice ID
ab713ee42b444003a9d5876b694a874d

Description

Amendment 0001 - 3/12/2026

The Purpose of Amendment 0001 is to:
1. Correct the quote due date discrepancy. Quote Due Date is April 10th, 2026 at 1:00 pm Central Daylight Time.
2. Remove Scheduled Site visit date. Due to current weather conditions at project location, there will not be a scheduled site visit. Contractors can visit the location on their own.

The Carson National Forest is pursuing road maintenance activities to be accomplished on the Tres Piedras Ranger
District.  Base items include drain dip construction, road widening, curve widening, road obliteration, new construction, rip rap placement, road reconditioning, and culvert installation. Drain dip construction will involve excavation and compaction of approximately 180 cubic yards of native material. Road widening will involve approximately 1390 cubic yards of excavation and compaction and will result in total road widths of twelve (12) feet.  New construction will involve 0.6 miles of clearing and grubbing and approximately 600 cubic yards of excavation and compaction. Road reconditioning will involve ditch maintenance, shoulder maintenance, roadbed maintenance, and aggregate surface maintenance where applicable. Lastly, culvert installation will involve the placement of a 57” x 38” arched corrugated metal pipe thirty (30) feet in length on top of approximately 30 cubic feet of uncompacted bedding material.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Troy A. McCullough

Documents

Files (4)

  • 127EAX26Q0014 External Documents.pdf

    9.5 MBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • 127EAX26Q0014 0001.pdf

    119 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • Attachment 5 - Schedule of Items.xlsx

    12 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • 127EAX26Q0014 Rock Creek Road Maintenance.pdf

    9.2 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationArchived

    Rock Creek Road Maintenance

    Notice 6ca8c5fc99cb409ab7a5b76e887a9c9a on SAM.gov

  2. 3
    Version 3Combined Synopsis/SolicitationArchivedCurrent

    Rock Creek Road Maintenance

    Notice ab713ee42b444003a9d5876b694a874d on SAM.gov

  3. 6
    Version 6Award NoticeArchived

    Type changed from Combined Synopsis/Solicitation to Award Notice

    Rock Creek Road Maintenance

    Notice 71c941c6d3534bfa94fea40f91ee3e86 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

127EAX26Q0014

Archive Date

Apr 25, 2026

Office Address

Albuquerque, NM, 871023498