GovChime
Notice ID: 3f98b4d2ba2f4d379e483c8e98cb04d2Combined Synopsis/SolicitationArchived

908th Electric Munitions Gate (Amendment 0002)

Archived on October 10, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:00 PM CDT
Posted
September 24, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
NAICS 23 Construction (reported as 230000)
Agency
Department of WarDepartment of the Air Force

Notice details

Office
AIR EDUCATION AND TRAINING COMMAND.FA3300 42 CONS CC
Place of performance
Montgomery, Alabama, 36112
PSC
5660: FENCING, FENCES, GATES AND COMPONENTS
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
FA330026R0035
Notice ID
3f98b4d2ba2f4d379e483c8e98cb04d2

Description

The United States Government (USG) requires a Electric Gate solution for the outside of multiple buildings.  The contractor shall furnish all necessary equipment, labor, supervision and materials.  All work is to be performed in accordance with this SOW and is subject to the terms and conditions of the contract and as specifically cited in the contractor’s proposal. 

 This project shall include: 

- 1 gate 21 foot long by 7 foot tall, metal chain-link with a round metal frame.

- 21x7 foot metal chain-link gate with round metal frame with a motor to open and close. “Munitions driver would be able to open the MSA gates via keypad while still inside of their vehicle thus adding more security and control of all loaded explosives.”

- Located North of Building 1286

- 1 gate 25 foot long by 7 foot tall, metal chain-link with a round metal frame.

                - 25x7  foot metal chain-link Gate with round metal frame with a motor to open and close.

“Munitions driver would be able to open the MSA gates via keypad while still inside of their vehicle thus adding more security and control of all loaded explosives.”

                - Located North of Buildings 1281 & 1282

- 2 each motors to open and close the above gates.

- Contractor shall attend site visit

- Contractor shall work through the 42nd Civil Engineering (CE) for installation of temporary power connections

- Start up and commissioning of the electric solution shall be completed within one (1) day of the execution of the contract

- Contractor shall provide delivery and pickup of rented items

- Contractor shall be responsible for all maintenance of provided rental items to include refueling

- Contractor shall coordinate with 42CE and/or customer for install/removal of rental items

- Provide any necessary certifications, drawings and manufacturer warranties 

- All work in accordance with (IAW) existing codes and regulations 

- Electrical installations must be completed by a certified electrician in accordance with NFPA 70. Flexible power cords must not pass through walls, floors, doors, or ceilings. Any penetrations in walls and ceilings must be appropriately fire stopped. Ensure a facility assessment is completed to ensure facility systems can support this request. Properly label breakers for emergency shutoff and power isolation.

- Any hot work (grinding, cutting, brazing, soldering, hot tapping) requires permits. Contact the fire prevention office to obtain permits prior to work beginning

Power Supply Locations: Power Supply for the 25’x7’ gate shall come off the electrical panel at either Bldg 1281 or 1282 depending on which side of the entrance driveway the motor is on. The cutting of concrete and (or) asphalt will be needed to get power conductors in duct below grade. Power Supply for the 21’x7’ gate shall come off the electrical panel for Bldg 1286, . Power conductor in duct can be direct buried in dirt with no concrete or asphalt crossings.

Vendor shall call in Underground Locates to Alabama One Call (Call Before You Dig Folks – 811) and make a call in to Base CE to get Base Operations to locate facilities.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (8)

  • RFP Electric Munitions Gate (Amendment 0002).docx

    30 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • Questions and Answers (Amendment 0002).docx

    28 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • SOW 908th Munitions Gate (Amendment 0002).docx

    40 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • SOW 908th Munitions Gate (AMENDED).docx

    40 KBAdded in Combined Synopsis/Solicitation version 2Posted
    Download
  • Questions and Answers.docx

    27 KBAdded in Combined Synopsis/Solicitation version 2Posted
    Download
  • SOW 908th Munitions Gate.docx

    39 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • RFP Electric Munitions Gate.docx

    30 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Clauses and Provisions.pdf

    58 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationArchived

    908th Electric Munitions Gate

    Notice 6d7b411bbd13416fa764e4a05dccd508 on SAM.gov

  2. 2
    Version 2Combined Synopsis/SolicitationArchived

    908th Electric Munitions Gate (Amendment 0001)

    Notice d9bff46ec38e4445a46d80603e017f26 on SAM.gov

  3. 4
    Version 4Combined Synopsis/SolicitationArchivedCurrent

    908th Electric Munitions Gate (Amendment 0002)

    Notice 3f98b4d2ba2f4d379e483c8e98cb04d2 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

FA330026R0035

Archive Date

Oct 10, 2026

Office Address

MAXWELL AFB, AL, 36112-6334