GovChime
Notice ID: 8b5427591054a6bc04a2f0d978655d5dCombined Synopsis/Solicitation

CLEANUP OF FLOOD DAMAGE AT COAST GUARD FACILITY

Archived on April 18, 2019. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
3:00 PM UTC−05:00
Posted
March 29, 2019
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
238990: All Other Specialty Trade Contractors
Agency
Department of Homeland SecurityUS COAST GUARD

Notice details

Office
BASE NEW ORLEANS(00029)
Place of performance
9800 J. Pershing Dr. , Omaha, NE, 68112-1503
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Jan 23, 2026

Identifiers

Solicitation number
70Z02919Q8PS027
Notice ID
8b5427591054a6bc04a2f0d978655d5d

Description

This is a combined synopsis/solicitation for services prepared in accordance with the format in subpart 12.6 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation WILL NOT is issued. The solicitation number is 70Z02919Q8PS027. This combined synopsis constitutes a solicitation and incorporates provisions and clauses in effect through Federal Acquisition Circular 2007. This acquisition is Small Business Set Aside. The NAICS is 238990 .The contract type will be a firm fixed price purchase order. The government proposes to solicit from the attached scope of work. Federal Acquisition Regulation (FAR) Clauses and Department of Labor Wage Rates for Services are included in this order and are applicable. Vendors doing business with the Coast Guard must be registered or be willing to register with the System Award Management at www.SAM.gov. Please Email all quotes to Jose Villegas, Jose.d.Villegas@uscg.mil. (504) 253-4896 If you have any questions pertaining to the please use the contractors request for clarification form. Submit all forms prior to the site visit to Jose Villegas at Jose.d.Villegas@uscg.mil This solicitation will be will be evaluated by the following criteria: Past Performance, Response time, Price. 52.237-1: Site visit Offers or quotes are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award 52.237-1 site visit For site visit please contact: Eva Gonzales, (305) 278-6714 or at Eva.M.Gonzales@uscg.mil Evaluation Process: Lowest Price Technically Acceptable. 1. SCOPE OF WORK 1.1. GENERAL REQUIREMENTS: The contractor shall provide all material, labor, disposal, equipment, and services necessary to perform all services as described herein. Services shall include the cleaning of all interior spaces as identified in section 1.4 and removal of any microbial or mold growth identified throughout the interior spaces. 1.2 LOCATION: The project is located at U.S. Coast Guard Cutter Gasconade, 9800 John J. Pershing Drive, Omaha, NE 68112-1503 1.3 BACKGROUND The Facility building for Coast Guard Cutter Gasconade experienced flooding to approximately 2 feet above the floor level. Flooding originated through the facility drains and continued to rise as the river's waterline reached and entered the building. Unit raised valuables and electronics above the flood line; however, the furniture was unable to be moved and was damaged. A floor plan is included to show the layout and dimensions of the facility. After the flooding event, the flooring and wet drywall was removed from the facility. Initial de-humidification efforts were made as well as shown in the pictures below. 1.4 PROJECT REQUIREMENTS General: The contractor shall clean and sanitize the interior spaces thoroughly using appropriate application specific methods. Additionally, the contractor shall treat any mold growth found and finish all spaces with an antifungal/mold inhibitor. These spaces shall include the kitchen, weight room, garage, berthing areas, lounge area, bathrooms and closet spaces, including closet housing HVAC unit, as identified on the site plan. Contractor shall conduct inspection of HVAC ductwork, and as needed, clean using the preferred method based upon the findings of the inspection. During the remediation process, the contractor shall use air scrubbers and dehumidifiers in the area. The size and number of air scrubbers and dehumidifiers shall be determined by the square footage of the area. The remediation company shall determine this and provide submittal of suggested number of equipment per space for approval prior to work beginning. Blowers and fans shall be used to dry out the floors and walls. Dehumidifiers and air scrubbers shall continue to run during and after the completion of cleaning. This equipment (blowers, dehumidifiers, and air scrubbers) shall continue to run for at least 24 hours after the completion of all remediation in each space. Unit personnel will not occupy the areas of work to allow for remediation to be completed per the schedule provided in section 1.6. 1.5 TRAINING Local, State, or Federal certification or licensure of microbial growth remediation or restoration. 1.6 SCHEDULE Contractor has 5 days from award notice to complete this project. 1.7 SCHEDULE OF VALUES NONE REQUIRED . 1.8 SPECIAL REQUIREMENTS NONE REQUIRED 1.9 SUBMITTALS NONE REQUIRED 1.10 HOURS OF WORK CGC GASCONADE FACILITY REMEDIATION OMAHA, NE 5 All Contractor work activities shall be conducted only between the hours of 0800 and 1500 local time, Monday through Friday, excluding all Federal Holidays. Request for work outside normal working hours must be submitted in writing for approval not less than 48 hours in advance. 1.11 CONTRACTOR USE OF PREMISES The Contractor shall be working within an operational Coast Guard installation. The Contractor shall perform and conduct all work to minimize interference with Coast Guard Operations and become familiar with and obey fire and security regulations. 1.12 INSPECTION The Contractor shall keep the unit fully informed of contract operations and plans. A unit representative will be present for commencement of work and again during acceptance of repairs. All work shall be inspected and accepted by the unit or other designated representative. To demonstrate that the materials to be used in this project conform to these specifications, the contractor may pursue any of the following: a. Certificates of compliance with specification requirements signed by an authorized officer of the manufacturer or processor of approved trade association involved. Such certificates shall show the name and address of the contractor and the name and location of the project. The certificate shall be accompanied by all supporting product data so that adequate evaluation by the Government can be made. b. Labeling by the manufacturer on unbroken/unopened containers. c. Official marking or labeling by recognized grading organization or national code association indicating compliance. 1.13 FINAL INSPECTION AND ACCEPTANCE When work is complete and ready for final inspection, the Contractor shall notify the unit to schedule a final acceptance walk-thru prior to completion. 1.14 WATER, ELECTRIC AND TOILET FACILITIES The contractor shall have reasonable use of water and electric utilities located at the Station. The contractor shall furnish, if needed, portable bathroom facilities at the work site. The government reserves the right to revoke these privileges at any time, for any reason. 1.15 REMOVALS All rubbish and trash created as a result of fulfilling this work shall be removed from the site daily at contractor expense. Contractor shall utilize recycling facilities for waste whenever possible. Hazardous materials shall become the property of the contractor and CGC GASCONADE FACILITY REMEDIATION OMAHA, NE 6 shall be removed from the site at contractor expense and disposed of in accordance with local, State, and Federal laws. 1.16 CLEANUP Contractor shall remove all debris generated by this operation by the end of each working day. Excessive equipment or material (removed or new) shall not be stored at the Station without prior approval of the unit. 1.17 PROTECTION OF EXISTING STRUCTURES, UTILITIES, AND WORK The contractor shall supply and maintain protective measures against damage to existing structures, utilities, or interruption of any service. Failure to do so may result in cessation of all work. All damages or interruption of utility services resulting from failure to take necessary precautions shall be repaired or restored at no additional cost to the Government. 1.18 REGULATORY REQUIREMENTS & ENVIRONMENTAL PROTECTION Comply with all Federal, State and local laws including EPA requirements. In addition, comply with ICC building codes, and other regulatory references. Provide safety equipment and worker protection during construction as required by OSHA for construction industry, 29 CFR 1926. The contractor is required to obtain any and all necessary permits. Contractor must use suitable control measures to prevent spills from entering waterways and must notify the Government of any discharges immediately. Contractor is responsible for clean-up of any spills of hazardous material. 1.19 DELIVERY, STORAGE, AND HANDLING Delivery of materials to the job site must be coordinated with the Stations Engineering Petty Officer prior to arrival due to limited lay down areas on Base. All materials shall be in sealed and undamaged containers or wrappings bearing the manufacturer's name, brand designation, specification number, batch number, color and date of manufacturer. Damaged materials shall not be used. POINTS OF CONTACT: A. Civil Engineering Unit Miami District 8 Facility Asset Manager: B. LTJG Jordan Groff - (305) 278-6752 A.. USCGC GASCONADE Engineering Petty Officer: B. MKC Richard Hebert - (402) 451-7681 - End of Scope -

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

Select documents to download

Showing 3 of 3 items

Document
Source
Agency
Posted Date
File Size
Actions
Combined Synopsis/SolicitationUS COAST GUARDMar 29, 2019-
Combined Synopsis/SolicitationUS COAST GUARDMar 29, 2019-
Combined Synopsis/SolicitationUS COAST GUARDMar 29, 2019-

Lifecycle

Solicitation:70Z02919Q8PS027
  1. Combined Synopsis
  1. Combined SynopsisCurrentMar 29, 2019

    CLEANUP OF FLOOD DAMAGE AT COAST GUARD FACILITY

    Notice 8b5427591054a6bc04a2f0d978655d5d on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 124PSA27Q0027 is issued as a Request for Quotation (RFQ) for replacement of cattle shades. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238990 The small business size standard is $19.0M. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
-Combined Synopsis11/24/2026
This project includes all work to demolish the existing fuel system. The existing fuel system consists of, but is not limited to, a 5,000-gallon diesel tank, diesel dispenser, concrete containment, light poles, and Automatic Tank Gauge.
-Market Research10/01/2026
The Department of Homeland Security (DHS), Immigration and Customs Enforcement (ICE) is issuing a request for quotation under solicitation 192127FHOFPS0001 a contractor to furnish all labor, supervision, materials, equipment, tools, fasteners, transportation, and incidentals necessary to provide and install black privacy screening at the Houston Field Office secure parking-lot perimeter fencing, entry/exit gates, and sallyport fencing in accordance with the attached Statement of Work (SOW). The associated North American Industrial Classification System (NAICS) code for this procurement is 238990– All Other Specialty Trade Contractors. Amendment 0001: Please see attached Amendment 0001 for information about a site visit.
-Combined Synopsis11/12/2026
This description is intended to summarize the project at a high level for procurement purposes. Interested parties must refer to the full SOW for complete technical requirements, detailed scope elements, design and construction deliverables, environmental obligations, safety standards, and administrative procedures. The SOW governs all expectations for this procurement. Project Overview The National Laboratory of the Rockies (NLR) is soliciting design‑build services for installation of new perimeter fencing along the North boundary of the South Table Mountain (STM) Campus. The work includes designing and installing new fencing, removing designated sections of existing chain‑link fence, and completing all related construction activities in accordance with NLR’s design standards, construction specifications, and DOE site requirements. Portions of the work require coordination with the State Historic Preservation Office (SHPO). Interested parties must reference the full Statement of Work (SOW) for all detailed scope, technical requirements, and performance expectations. Design‑Build Requirements The Subcontractor shall develop and submit design documents consistent with NLR’s required 50% and 90% design reviews, followed by preparation of a complete 100% Issued‑for‑Construction package. All design work must comply with applicable codes, NLR Design Standards, and required CAD/BIM formats. Throughout the effort, the Subcontractor must maintain alignment with NLR’s design‑to‑cost objectives and utilize Procore for all project documentation, including drawings, specifications, RFIs, and submittals. Construction Requirements All construction activities must comply with NLR’s safety, security, and environmental guidelines, including requirements for site access, personnel qualifications, and safe work practices. The Subcontractor is responsible for completing all utility locates before performing any excavation and must implement erosion control, material handling, and environmental protection measures as required. Waste prevention, recycling, and proper tracking of off‑site disposal activities must be performed in accordance with the SOW and associated exhibits. Management, Coordination, and Quality Assurance The Subcontractor shall provide qualified project management and on‑site supervision, maintain an approved Quality Assurance Plan, and participate in all required meetings, field observations, testing, and commissioning activities. The Subcontractor is responsible for coordinating deliveries, securing access authorization for personnel, and following all NLR and DOE security protocols. At project completion, the Subcontractor must deliver accurate as‑built documentation, testing records, and turnover materials in accordance with NLR standards and support NLR’s Beneficial Occupancy process.
-Solicitation11/11/2026
Market Research Only – Not a Request for Proposal Title: Counter-Unmanned Aircraft System (C-UAS) Netting Installation for Aircraft Sunshade Structures Notice Type: Sources Sought NAICS Code: 238990 – All Other Specialty Trade Contractors Response Due Date: 13 November 2026, 4:00 PM Local Time Submit Responses To: matthew.lahr.3@us.af.mil 1. Purpose The United States Air Force is conducting market research to identify qualified sources capable of providing all design, materials, labor, and equipment necessary to furnish and install counter-Unmanned Aircraft System (UAS) netting on existing aircraft sunshade structures. A primary purpose of this notice is to determine whether this requirement can be set aside for small businesses under the SBA guidelines for NAICS 238990. The Government is seeking to determine the availability and capability of small business concerns (including 8(a), HUBZone, SDVOSB, and WOSB) to perform this work. This notice is issued solely for market research and small business set-aside determination purposes in accordance with FAR Part 10. It does not constitute a Request for Proposal (RFP), Invitation for Bid, or any other form of solicitation. The Government does not guarantee that a contract will result from this notice, and the Government will not reimburse any costs incurred by interested parties in preparing or submitting a response. The Government is also interested in unique and innovative solutions, including any proof-of-concept or operational C-UAS netting installations already fielded or under evaluation at other Department of Defense installations. 2. Requirement Overview The contractor shall design, furnish, and install counter-UAV netting on all four sides of six (6) existing aircraft sunshade structures. Each structure is approximately: Length: 630 feet Width: 65 feet Height: 30 feet Configuration: 6 bays per structure A drawing of the aircraft sunshade structures is attached to this notice. Primary Objective: Prevent Group 1 (“small”) Unmanned Aerial Vehicles from penetrating the interior of the sunshade structures to protect aircraft and personnel. 3. Technical Requirements (Minimum) The proposed netting system must meet or exceed the following: Material: UV-resistant, moisture-resistant, capable of withstanding temperatures up to 400°F. Polyester or Nylon are preferred. Tensile strength: 200 lbs or greater. Mesh opening: Netting squares no larger than 3 inches across. Performance: Capable of stopping Group 1 small UAVs from penetrating the structure without compromising the netting. Wind Load: Must meet Miami-Dade County Wind Load rating requirements. Retractability: Netting installed on the north- and south-facing sides shall be quickly and easily retractable to allow normal aircraft entry and exit. Engineering Support: The contractor shall utilize licensed professional engineers (as applicable). Structural engineers may be required to evaluate the load capacity of the existing metal sunshade structures and design appropriate attachment methods. The contractor is responsible for all design, material procurement, fabrication, installation, testing, and any structural modifications required for a complete and functional system. 4. Capabilities Package Requirements All interested parties (large and small businesses) are encouraged to submit a capabilities package limited to 10 pages total. The package must include, at a minimum: a. Company name, CAGE code, UEI number, business size status (including small business size standard under NAICS 238990), and socioeconomic category (if applicable). b. Relevant past performance on similar projects (large-scale netting, screening, protective systems, or specialized fabric installations on metal structures, preferably aviation-related). c. Technical approach or conceptual design solution addressing the material, performance, wind-load, retractability, and engineering requirements. d. Experience with structural engineering analysis and load calculations on existing metal structures. e. Description of any innovative or unique C-UAS netting solutions your company has developed or installed. f. Rough Order of Magnitude (ROM) pricing and estimated period of performance (optional but highly desired). g. Any other information demonstrating your company’s ability to successfully perform this requirement. Small businesses are especially encouraged to respond and clearly identify their business size status. 5. Submission Instructions Email your capabilities package to: matthew.lahr.3@us.af.mil Subject Line: “C-UAS Sunshade Netting Sources Sought – [Company Name]” Deadline: No later than 13 November 2026, 4:00 PM Local Time 6. Disclaimer This Sources Sought notice is for information and planning purposes only. Responses will be used to assess industry interest and capability, and specifically to determine whether a small business set-aside is feasible. The Government is under no obligation to issue a solicitation or award a contract as a result of this notice. The Government will not pay for any information submitted in response to this notice.
-Market Research11/13/2027

Additional Details

Solicitation Number

70Z02919Q8PS027

Archive Date

Apr 18, 2019

Office Address

NEW ORLEANS, LA, 70117