Misawa AB - Membrane Storage Shelters - Design-Build

Archived on October 7, 2026. Original response deadline: . Full description on SAM.gov.

Description

Update, 22 July 2026 - Updated SOW drafts. 

The 356th ETSG Contracting Office is posting this pre-solicitation in perparation for soliciting for two (2) design-build projects at Misawa Air Base in Aomori prefecture, Japan. The base requirements for the construction projects can be found in the attached draft Statement of Work (SOW) for each project.

While the formal solicitation will be a consolidation of the two projects, two distinct awards will be made. Offerors will be encouraged to propose for either site 1 or 2 or for both, if able. Two separate awards will be made either way.

An organized pre-solicitation site visit is scheduled for 3 August 2026 at 0900 hours, Japan Standard Time (JST). The meeting place will be at the Misawa Air Base Visitor Control Center, 1 Chome 1-23, Okamisawa, Misawa, Aomori 033-0021. Any potential offeror who will participate the site visit must send an attendees list to SSgt CAMERON SMITH at cameron.smith.16@us.af.mil and SSgt DANIEL CALLAHAN at daniel.callahan.7@us.af.mil via email by 30 July 26, 0900 hours JST. The following information will be needed- documents with names, copies of driver’s licenses, and vehicle(s) make, model, color and license plate.

The Rough Order of Magnitude for each project being solicited for is as follows:
Site 1 (C-1):  $1,000,000 to $5,000,000
Site 2 (A-1):  $3,000,000 to $7,000,000

A formal solicitation with updated SOWs will be posted on 4 August 2026, but another site visit will not be held. 

Please submit all questions to the POCs listed and a response will be provided within 2 business days, and posted onto SAM when applicable.

Full description on SAM.gov

Overview

Agency:
Department of WarDepartment of the Air Force
Office:PACIFIC AIR FORCES.FA5025 356 ECEG PK
Posted:July 21, 2026
NAICS:236220: Commercial and Institutional Building Construction
Last Updated:Oct 28, 2026
First published:
Last updated on SAM.gov:
PSC:Y1GZ: CONSTRUCTION OF OTHER WAREHOUSE BUILDINGS
Set-Aside:No Set aside used
Type:Presolicitation
Place of Performance:Misawa Air Base, Aomori, 033-0021

Award Overview

Possible prior contracts

Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).

Contacts

Contracting Officer

Primary Contact

SSgt Cameron Smith

Secondary Contact

Documents

Files (6)

  • SOW-QKKA261109 (A-1 Updated).pdf

    262 KBAdded in Presolicitation version 4Posted
    Download
  • SOW-QKKA261043 (C-1 Updated).pdf

    242 KBAdded in Presolicitation version 4Posted
    Download
  • Site A1 Drawings.pdf

    6.8 MBAdded in Presolicitation version 1Posted
    Download
  • Site C1-Drawings.pdf

    11 MBAdded in Presolicitation version 1Posted
    Download
  • SOW-QKKA261043 (C-1).pdf

    317 KBAdded in Presolicitation version 1Posted
    Download
  • SOW-QKKA261109 (A-1).pdf

    343 KBAdded in Presolicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1PresolicitationArchived

    Misawa AB - Membrane Storage Shelters - Design-Build

    Notice 71b7f1eceb594f9a851f4bef234dbf86 on SAM.gov

  2. 4
    Version 4PresolicitationArchivedCurrent

    Misawa AB - Membrane Storage Shelters - Design-Build

    Notice 3d9a892b295643409ef9ddc283084672 on SAM.gov

  3. 3
    Version 3Solicitation

    Type changed from Presolicitation to Solicitation

    Misawa AB - Membrane Storage Shelters - Design-Build

    Notice 5191725e789840cc83ada015986b5079 on SAM.gov

Similar Opportunities

Title
Phase
Agency
NAICS
Set Aside
Posted
Deadline
Location
Amendment 0001- The purpose of this amendment is to provide the responses to all RFIs submitted by the August 24th deadline. Additional questions will only be accepted if they relate directly to one of the government responses. Follow-up questions must be submitted by August 28th, at 1200 JST. As of now, there will not be an extension in the proposal submission deadline. If an updated SOW and drawings are not provided before the deadline, the answers in the RFIs will take precedence over any conflicting information within the documents. All other terms and conditions remain the same. The 356th Expeditionary Theater Support Group (356 ETSG/CONS) Contracting Office is posting this solicitation for two (2) design-build construction projects to deliver storage shelters at Misawa Air Base, Japan. Complete project requirements, technical specifications, and performance parameters are detailed in the corresponding attached draft Statement of Work (SOW) and project drawings. The following are the ROMs for each site: Project Magnitude / ROM (Rough Order of Magnitude): Site 1 (C-1) Applicable Proposal ROM: $1,000,000 to $5,000,000 Site 2 (A-1) Applicable Proposal ROM: $3,000,000 to $7,000,000 1. Critical Acquisition Milestones & Deadlines Please review the timeline below carefully. Late submissions or questions will not be entertained unless explicitly authorized by the Contracting Officer. All times are in Japan Standard Time (JST). Site Visit (Completed): An organized pre-solicitation site visit was held on 03 August 2026. No secondary or additional site visits will be hosted. Additional RFI Deadline: 21 August 2026 @ 09:00 AM JST. Additional RFIs must be sent via email to both designated POCs (see below) by this deadline to be answered. RFI Responses Posted: The government's RFI responses will be posted as an amendment to this notice no later than 24 August 2026. With the RFIs, the final SOW, drawings and related updates will be provided as well. Proposal Submission Due Date: 11 September 2026 @ 12:00PM JST. Multiple or Single Award: At this time, the Government intends to make two separate awards (one contract for each site) to the responsible Offeror(s) whose proposal(s) provide the best value to the Government. There is a possibility of one single award, but it is not guaranteed. The Government will conduct two distinct evaluations- one for Site 1 and one for Site 2. Offerors may win one site, both sites, or neither site. 2. Important Submission & Evaluation Instructions Request for Information (RFI) Ground Rules: Resulting from the August 3rd site visit, RFIs were submitted and are currently in the process of being answered. Once the formal RFI responses are posted by August 24th, additional questions will only be accepted if they relate directly to one of the published government responses. This process may result in an extended proposal submission window, but does not guarantee additional response time. Proposal Due Date Clarification: Please ignore any system-generated defaults on SAM.gov or within the SF 1447 block that state "03:00 GMT" as the submission deadline. The official, legally binding deadline for proposal receipt is September 11th, 2026, at 12:00 PM JST. Evaluation Guidelines: The full SF 1447 solicitation document contains all guidelines for proposal submission (Section L) and the evaluation factors for award (Section M). These instructions and evaluation factors will only be amended to correct clerical errors or clear up misunderstandings. 3. Contact Instructions Please direct all questions, RFIs, and final proposal submissions* via email to both of the following Points of Contact: SSgt Cameron Smith: cameron.smith.16@us.af.mil SSgt Daniel Callahan: daniel.callahan.7@us.af.mil * For submissions over 10mb, they will not be accepted by our internal e-mail security measures. Offerors must submit a request for a DoDSAFE link to submit their proposals no later than 48hrs before submission deadline.
Solicitation236220No Set-Aside08/24/202609/11/2026Misawa Air Base, JP-02
Amendment 0002 Correction- RFI reponses were not included with Amendment 0002. Added to attachments, [RFIs-FA502526RB006 (27 Aug Updates)] Amendment 0002- The purpose of this Amendment is to: -Extend the proposal due date from 11 September 2026 to 16 September 2026 at 0000GMT / 0900JST -Update Requirement Description text -Remove requirement for Bond/Guarantee -Update RFI responses with further clarifications (2 clarified responses. Highlighted Yellow) -Add or Replace Updated Section J Attachments: -Replace previous SOW (Rev5) with updated revision 8 -Add updated Drawings (Drawing labeled "########" on SF30 is labeled "Transfer Surface Drawing" on SAM. Original Document name is "米軍工事転移表面") All other terms and conditions remain the same. Amendment 0001- The purpose of this amendment is to provide the responses to all RFIs submitted by the August 21st deadline. Additional questions will only be accepted if they relate directly to one of the government responses. Follow-up questions must be submitted by August 28th, at 1200 JST. As of now, there will not be an extension in the proposal submission deadline. If an updated SOW and drawings are not provided before the deadline, the answers in the RFIs will take precedence over any conflicting information within the documents. All other terms and conditions remain the same. Amendment 0: Due to internal system issues, this amendment will be considered "Amendment 0" for acknowledgement of amendments on block 19 of the SF 1442. We apologize for the inconvenience. Amendment details - Correction in response to RFI. "Block 13.b of the SF 1442" requires a bid bond/guarantee. Disregard this, as a bid bond/guarantee is not required for this requirement. The 356th Expeditionary Theater Support Group (356 ETSG/CONS) Contracting Office is posting this solicitation for a design-build construction project to deliver a membrane shelter at Matsushima Japan Air Self-Defense Force (JASDF) Base, Japan. Complete project requirements, technical specifications, and performance parameters are detailed in the attached draft Statement of Work (SOW) and corresponding project drawings. Project Magnitude / ROM (Rough Order of Magnitude): Between $1,000,000 and $5,000,000 USD. ⚠️ SPECIAL NOTICE: MANDATORY JAPANESE LICENSING REQUIREMENT In accordance with Japanese Construction Industry Law (Law No. 100 of 1949), the Prime Contractor (or the lead entity of a joint venture) MUST hold a valid Japanese Construction License at the time of proposal submission. No Subcontracting of License: To ensure direct performance accountability and robust contract administration, the offering Prime Contractor itself (or the lead entity of a Joint Venture) must hold this license. Relying on a subcontractor's Japanese Construction License to satisfy this requirement is prohibited. Compliance: Offerors must submit proof of the Prime Contractor's license with their technical proposal. Sub-contracting a company with the license will not be permitted. Evaluation: This is a strict pass/fail threshold requirement. Proposals from prime vendors who do not hold this license or cannot demonstrate legal compliance with Japanese construction licensing laws will be determined non-compliant and excluded from evaluation. 1. Critical Acquisition Milestones & Deadlines Please review the timeline below carefully. Late submissions or questions will not be entertained unless explicitly authorized by the Contracting Officer. All times are in Japan Standard Time (JST). Site Visit (Completed): An organized pre-solicitation site visit was held on 05 August 2026. No secondary or additional site visits will be hosted. Additional RFI Deadline: 21 August 2026 @ 09:00 AM JST. Additional RFIs must be sent via email to both designated POCs (see below) by this deadline to be answered. RFI Responses Posted: The government's RFI responses will be posted as an amendment to this notice no later than 24 August 2026. Proposal Submission Due Date: 11 September 2026 @ 09:00 AM JST. 2. Important Submission & Evaluation Instructions Request for Information (RFI) Ground Rules: Resulting from the August 5th site visit, RFIs were submitted and are currently in the process of being answered. Once the formal RFI responses are posted on August 24th, additional questions will only be accepted if they relate directly to one of the published government responses. This process may result in an extended proposal submission window, but does not guarantee additional response time. Proposal Due Date Clarification: Please ignore any system-generated defaults on SAM.gov or within the SF 1447 block that state "00:00 local time" as the submission deadline. The official, legally binding deadline for proposal receipt is September 11th, 2026, at 09:00 AM JST. Evaluation Guidelines: The full SF 1447 solicitation document contains all guidelines for proposal submission (Section L) and the evaluation factors for award (Section M). These instructions and evaluation factors will only be amended to correct clerical errors or clear up misunderstandings. 3. Contact Instructions Please direct all questions, RFIs, and final proposal submissions* via email to both of the following Points of Contact: SSgt Cameron Smith: cameron.smith.16@us.af.mil SSgt Daniel Callahan: daniel.callahan.7@us.af.mil * For submissions over 10mb, they will not be accepted by our internal e-mail security measures. Offerors must submit a request for a DoDSAFE link to submit their proposals no later than 48hrs before submission deadline.
Solicitation236220No Set-Aside08/27/202609/16/2026Higashimatsushima, JP-04
1. BOTTOM LINE UP FRONT (BLUF) The Department of the Air Force, specifically the 66th Civil Engineer Squadron (66 CES) at Hanscom Air Force Base (AFB), Massachusetts, is publishing this Umbrella Program Notice to announce the establishment of Hanscom’s Execution & Rapid Operations (HERO) acquisition framework. Operating under the innovative statutory authority of 10 U.S.C. § 2808a, HERO seeks to completely modernize base infrastructure and execute facility repair and construction projects using flexible, commercial-style Other Transaction Agreements (OTAs). Traditional Federal Acquisition Regulation (FAR) rules do not apply, enabling the Air Force to engage directly with local, regional, and national commercial builders who have limited or no prior federal contracting experience. 2. PROGRAM STRUCTURE & TIMELINE Rather than a single, one-off project solicitation, this Notice establishes the HERO Umbrella Program, which will remain active for one (1) full year from the date of this posting. During this 12-month period, the Government will periodically publish project-specific solicitations, referred to as Areas of Interest (AOIs), directly under this umbrella. Each independent AOI will outline: The specific facility construction, repair, or modernization project requirements. The exact response date, time, and instructions for submitting Solution Briefs. The collaborative delivery model designated for that project, such as Progressive Design-Build (PDB) utilizing open-book Guaranteed Maximum Price (GMP) pricing, or Build-Only (BO) commercial delivery. 3. ELIGIBILITY & PARTICIPATION The HERO framework actively seeks to lower barriers to entry. Unlike prototype OTAs, 10 U.S.C. § 2808a carries no statutory Nontraditional Defense Contractor (NDC) prerequisites and zero cost-share mandates. Commercial general contractors, specialty trades, design-build firms, and joint ventures are all fully eligible and strongly encouraged to monitor this notice and participate. 4. ACTION REQUIRED FOR INTERESTED VENDORS Interested commercial builders and designers should take the following immediate steps to prepare for upcoming HERO projects: Monitor This Posting: Bookmark this SAM.gov notice. All project-specific AOIs will be posted as amendments or linked notices here. Register on SAM.gov: Ensure your company has an active, completely free registration and Unique Entity ID (UEI) on SAM.gov. Form Teaming Alliances: Begin networking with regional design firms, general contractors, and trade subcontractors to build integrated design-build consortia capable of executing rapid, commercial-style projects.
Special Notice236220No Set-Aside10/26/202609/30/20270, MA
Update 26 Oct 26 MACH-1 AOI F-47 Future Campus at Nellis AFB Progressive Design-Build (PDB) Acquisition Additional Industry Engagement Opportunity: In-Person Comments and Questions The Air Force Civil Engineer Center (AFCEC), supported by its Owner's Advisor (OA), is offering an additional opportunity for interested industry participants to provide comments and questions concerning the Draft Announcement of Interest (AOI) and the proposed Progressive Design-Build (PDB) acquisition approach. The Government recognizes that some industry observations, recommendations, and questions are difficult to fully articulate in writing. We welcome the opportunity to listen directly to industry perspectives as we refine the Final AOI and develop our Phase 2 interview approach. Opportunity to Schedule a 30-Minute Industry Comment Session Interested firms may request a 30-minute meeting with the OA team by contacting: NellisF47OA@tetratech.com Available Meeting Dates: Wednesday, 28 October, or Thursday, 29 October 2026 Industry Engagement Closes: COB Thursday, 29 October 2026 Meeting requests will be accepted throughout the industry engagement period, subject to available scheduling capacity. Firms are encouraged to contact the OA as early as possible to facilitate scheduling. Meetings may be recorded to ensure accurate documentation of industry feedback. The OA is actively contacting firms that participated in Industry Day to extend this invitation. However, participation is open to all interested industry firms, regardless of whether they attended Industry Day. This includes prospective PDB prime vendors, joint venture partners, and other members of prospective vendor teams. Due to the accelerated acquisition schedule, meeting availability is limited. The Government and OA will make reasonable efforts to accommodate as many interested firms as possible, but a meeting cannot be guaranteed for every request. All meetings must be completed by COB Thursday, 29 October 2026. Treatment of Industry Comments and Questions The rules governing comments and questions remain unchanged from those established in the Draft AOI posted on SAM.gov. Participation in an industry comment session does not create a separate communications channel for obtaining acquisition clarifications. The following distinctions apply: Comments: Industry observations, recommendations, concerns, and suggestions are welcomed for Government consideration. Comments do not require an individual response. The Government may consider these perspectives when refining the Final AOI, acquisition approach, and Phase 2 interview process. Questions: Requests for clarification, interpretation, or an official Government response concerning the acquisition must be submitted through the Agreements Officer (AO) in accordance with the Draft AOI instructions. The OA will not provide individual answers to acquisition questions during these sessions. Official questions and responses will be made available to all interested vendors through the established acquisition process. These sessions are intended exclusively to gather industry feedback on the Government's proposed AOI approach, including potential barriers to industry participation, limitations affecting competition, and recommendations for improving the AOI and Phase 2 interview process. We are not seeking qualifications, capabilities briefings, teaming arrangement information, or proposals. We are particularly interested in understanding whether any aspects of the Draft AOI or evaluation approach could unnecessarily limit participation or discourage otherwise qualified firms from competing. These sessions are not proposal evaluations or opportunities to obtain advance information concerning Government evaluation decisions. No participating firm will receive preferential acquisition information or consideration as a result of these meetings. Participation or nonparticipation will not independently affect a firm's evaluation. Conclusion of Industry Engagement All industry market engagement conducted by the OA on behalf of AFCEC will conclude at COB Thursday, 29 October 2026, to accommodate the Government's accelerated acquisition schedule. Upon publication of the Final AOI, all direct acquisition-related communications with the OA and AFCEC are prohibited. Vendors shall not attempt to contact OA or AFCEC personnel concerning the acquisition after publication of the Final AOI. From that point forward, all acquisition-related communications, including questions, comments, and requests for clarification, must be directed exclusively through the Agreements Officer, using the procedures established in the Final AOI. AFCEC appreciates industry's continued interest and willingness to contribute its experience to this important Air Force initiative. We value the opportunity to learn from commercial construction practices, collaborative delivery experience, and innovative approaches that may improve the execution of the F-47 Operational Test facilities program. --------------------End Update-------------------- Draft AOI: Industry Questions and Comments The Government welcomes industry questions and comments regarding this Draft Area of Interest (AOI). For purposes of this market engagement, questions and comments will be treated differently, as described below. Questions: Questions are requests for clarification, interpretation, or additional information regarding the Draft AOI and are intended to solicit a written response from the Government. The Government intends to respond to questions received by 4:00 PM Central Daylight Time (CDT) on 26 October 2026, with a target of publishing responses by close of business on 28 October 2026. Questions and Government responses will be made available to all prospective respondents. Comments: Comments are industry observations, recommendations, suggested revisions, or other feedback offered for Government consideration that do not request a response. The Government will take comments received by 4:00 PM CDT on 26 October 2026 under advisement in developing the Final AOI. The Government will not individually respond to or publish industry comments. Submissions After the Deadline: The Government will review and contemplate all questions and comments received after 5:00 PM CDT on 26 October 2026. However, due to the acquisition schedule, the Government cannot guarantee that late submissions will influence development of the Final AOI. The Government may elect to respond to questions received after the deadline following publication of the Final AOI. Industry participants are encouraged to clearly identify each submission as either a Question or Comment. Submissions containing both should distinguish the questions requiring Government responses from comments provided solely for consideration. The Government appreciates industry's participation and welcomes constructive feedback to support development of a clear, competitive, and commercially viable Final AOI. The following represents the anticipated Final AOI SAM.gov description: MACH1 Area of Interest: F-47 Campus at Nellis AFB, Rapid Delivery Progressive Design-Build The 772d Enterprise Sourcing Squadron (772 ESS), in coordination with the Air Force Civil Engineer Center (AFCEC), is seeking highly qualified Design-Build teams to deliver the Rapid Delivery Projects supporting the F-47 mission at Nellis Air Force Base, Nevada, utilizing a Progressive Design-Build (PDB) model. This Area of Interest (AOI) is issued under the Modernized Agile Construction Horizons (MACH1) Umbrella Program Notice, FA8903-OT-MACH1. Any resulting agreement will be an Other Transaction Agreement (OTA) executed under the authority of 10 U.S.C. § 2808a. Respondents shall comply with the MACH1 Umbrella Program Notice and the project-specific requirements established in the attached AOI. Program Overview The F-47 Campus at Nellis AFB is an approximately $1.057 billion total programmed military construction initiative intended to provide the facilities and infrastructure necessary to support the F-47 mission. This amount includes construction, contingency, design, construction security, and other applicable project costs and does not represent the construction agreement value available under this AOI. The present acquisition contemplates award for the Rapid Delivery Projects under Milestones 2 through 4 only, consisting of: Combined Operations and Maintenance Hangar. Reprogramming Laboratory. Simulator Facility. Aircraft Apron with Sunshades. Supporting utilities and infrastructure necessary for permanent operation of the Rapid Delivery facilities. The Government strongly prefers to select one Design-Build team capable of delivering all Rapid Delivery Projects, while reserving the right to select up to four teams if warranted by program requirements and permitted by the applicable acquisition authority. The Government also values organizations possessing the qualifications and resources to support the remaining Nellis F-47 Campus. However, selection under this AOI does not guarantee Milestone 5 or subsequent Agreement(s). Progressive Design-Build Delivery Approach The Government intends to initiate design and preconstruction services following completion of the Planning Charrette Reports establishing the initial mission requirements. The selected Design-Build team will work collaboratively with AFCEC and its Owner's Advisor to advance facility designs, evaluate alternative technical and construction solutions, develop cost and schedule strategies, and establish commercially supportable construction pricing. The Government contemplates negotiating firm-fixed-price construction agreement at approximately 65% design completion, subject to sufficient scope maturity, risk allocation, and commercial cost viability. Advanced design packages, early construction activities, and long-lead procurement may be considered where appropriately justified and authorized. AFCEC seeks a collaborative construction partner committed to delivering the greatest possible mission capability and value for the resources invested. The Government intends to consider innovative design and construction approaches, including industrialized construction methods, commercially effective Agreement commitment strategies, and practical alternatives that improve affordability and schedule performance. Three-Phase Selection Process The Government intends to conduct an expedited three-phase selection process under MACH1: Phase 1: Solution Brief. Respondents will submit qualifications and technical information demonstrating the capabilities of their actual proposed design and construction organizations. The attached AOI establishes ten project-specific technical factors and a maximum of 20 narrative pages, with separately permitted appendices. No construction price or rough-order-of-magnitude construction estimate is required during Phase 1 Submissions. Phase 2: Oral Presentations / Pitch Sessions. Selected respondents will be invited to participate in oral presentations. Detailed instructions and additional technical information will be provided to invited respondents, subject to applicable information-security requirements. Phase 3: Full Phase 3 Submission and Negotiations. The Government intends to conduct direct negotiations with selected respondent(s), subject to applicable authority and Agreements Officer approval. Commercial viability of the price will be evaluated before award. Anticipated Acquisition Schedule AOI Release: October 30, 2026. Initial Industry Questions Due: November 4, 2026. Final Industry Questions Due: November 10, 2026. Phase 1 Solution Briefs Due: November 18, 2026, at 9:00 PM Central Standard Time. Phase 2 Invitations: By December 2, 2026. Phase 2 Oral Presentations: December 14–17, 2026. Phase 3 Invitations: December 22, 2026. Phase 3 Submissions Due: January 15, 2027. Target Initial OTA Award: February 5, 2027. All dates are anticipated and subject to revision by the Agreements Officer. Submission Instructions Respondents shall review the complete attached AOI and MACH1 Umbrella Program Notice for eligibility requirements, technical factors, page limits, qualification-sheet requirements, cybersecurity provisions, and evaluation procedures. Phase 1 submissions shall be unclassified and submitted as a single searchable PDF with the required bookmarks and appendices. Submit Solution Briefs electronically to: 772ESS.PKA.MACH1@us.af.mil Reference the assigned F-47 Future Campus AOI Notice ID in the email subject line. All questions and acquisition communications shall be directed to the Agreements Officer through the designated MACH1 correspondence address. Only authorized Government officials may modify AOI requirements or make commitments binding upon the Government. The Government reserves the right to amend or cancel this AOI, request supplemental information, limit the number of respondents advancing to subsequent phases, or make no award, consistent with applicable authority. The attached AOI establishes the controlling project-specific submission requirements and evaluation procedures.
Pre-Solicitation236220No Set-Aside10/26/202610/26/20260, NV
SUBJECT: — Robins Agile Practices for Infrastructure Development (RAPID) Umbrella Program Notice (10 U.S.C. § 2808a Other Transaction Authority) 1. BOTTOM LINE UP FRONT (BLUF) The Department of the Air Force, specifically the 78th Civil Engineer Group (78 CEG) at Robins Air Force Base (AFB), Georgia, is publishing this Umbrella Program Notice to announce the establishment of the Robins Agile Practices for Infrastructure Development (RAPID) acquisition framework. Operating under the innovative statutory authority of 10 U.S.C. § 2808a, RAPID seeks to completely modernize base infrastructure and execute facility repair and construction projects using flexible, commercial-style Other Transaction Agreements (OTAs). Traditional Federal Acquisition Regulation (FAR) rules do not apply, enabling the Air Force to engage directly with local, regional, and national commercial builders who have limited or no prior federal contracting experience. 2. PROGRAM STRUCTURE & TIMELINE Rather than a single, one-off project solicitation, this Notice establishes the RAPID Umbrella Program, which will remain active for one (1) full year from the date of this posting. During this 12-month period, the Government will periodically publish project-specific solicitations, referred to as Areas of Interest (AOIs), directly under this umbrella. Each independent AOI will outline: The specific facility construction, repair, or modernization project requirements. The exact response date, time, and instructions for submitting Solution Briefs. The collaborative delivery model designated for that project, such as Progressive Design-Build (PDB) utilizing open-book Guaranteed Maximum Price (GMP) pricing, or Build-Only (BO) commercial delivery. Program ParameterDetailsStatutory Authority10 U.S.C. § 2808a (Standalone Facility Construction or Repair Authority)Umbrella Active Period12 Months (Continuous Open Notice)Execution VehicleProject-Specific Areas of Interest (AOIs) & Other Transaction Agreements (OTAs)Key FlexibilitiesNo FAR boilerplate clauses, standard commercial accounting (No CAS), negotiable termsFollow-on AuthorityEligible for non-competitive, sole-source follow-on production construction under § 2808a(c) 3. ELIGIBILITY & PARTICIPATION The RAPID framework actively seeks to lower barriers to entry. Unlike prototype OTAs, 10 U.S.C. § 2808a carries no statutory Nontraditional Defense Contractor (NDC) prerequisites and zero cost-share mandates. Commercial general contractors, specialty trades, design-build firms, and joint ventures are all fully eligible and strongly encouraged to monitor this notice and participate. 4. ACTION REQUIRED FOR INTERESTED VENDORS Interested commercial builders and designers should take the following immediate steps to prepare for upcoming RAPID projects: Monitor This Posting: Bookmark this SAM.gov notice. All project-specific AOIs will be posted as amendments or linked notices here. Register on SAM.gov: Ensure your company has an active, completely free registration and Unique Entity ID (UEI) on SAM.gov. Form Teaming Alliances: Begin networking with regional design firms, general contractors, and trade subcontractors to build integrated design-build consortia capable of executing rapid, commercial-style projects.
Special Notice236220No Set-Aside09/21/202609/16/2027Warner Robins, GA

Additional Details

Solicitation Number

FA502526RB004

Archive Date

Oct 7, 2026

Place of Performance Country

JAPAN

Office Address