Notice ID: b2ed5011fde845018fca07ca60417888Solicitation
USAID Southern Africa Mobilizing Investment.
Archived on April 28, 2022. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 9:00 AM UTC−11:00
- Posted
- March 1, 2022
- Notice type
- Solicitation
Notice details
- Office
- USAID/SOUTH AFRICA
- Place of performance
- Pretoria, Gauteng
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- 72067422R00004
- Notice ID
- b2ed5011fde845018fca07ca60417888
Description
The United States Agency for International Development (USAID) is seeking proposals to provide delivery services and technical assistance to support USAID Southern Africa Mobilizing Investment as described in the attached Request for Proposals (RFP). USAID anticipates awarding one (1) cost-plus-fixed-fee (CPFF) term type contract for a five-year period to the responsible offeror whose offer conforms to the solicitation requirements and is the most advantageous to the US Government, price and other factors considered. The procurement will be conducted through full and open competition, under which any type of organization (large or small commercial [for profit] firms, educational institutions, and nonprofit organizations) is eligible to compete. The procedures set forth in Federal Acquisition Regulation (FAR) Part 15 apply. Offerors should not strive to meet the maximum amount; rather, Offerors should propose costs that are appropriate, realistic and reasonable, and in accordance with the proposed approach for achieving results. Cost proposals will be evaluated as part of a best value determination. Offerors are responsible for ensuring proposals are received at USAID by the due date and time as specified in Section L. Failure to comply with the submission date will deem any submission unacceptable and it will not be reviewed or evaluated. USAID requires that offers remain valid for 180 days. Section L of the RFP sets forth all instructions for the preparation and submission of required proposal content, including critical dates/times for the submission of questions, and the proposal submission closing date and time. Section M states the criteria by which proposals will be evaluated. Oral explanations or instructions given before award of the contract will not be binding. The authorized geographic code for procurement of goods and services under this activity is 935. The North American Industry Classification System (NAICS) code for this activity is 541990. Under 13 CFR 121.201, the U.S. Small Business size standard is $15M of annual receipts. This RFP in no way obligates USAID to award a contract nor does it commit USAID to pay any cost incurred in the preparation and submission of a proposal. Award of a contract under this RFP is subject to availability of funds and other internal USAID approvals. A detailed solicitation can be found under attachments.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
72067422R00004- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 2×SolicitationCurrentFeb 7, 2022
USAID Southern Africa Mobilizing Investment.
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The United States Agency for International Development (USAID) is issuing this Broad Agency Announcement (BAA) to seek participants to co-create, co-design, co-invest and collaborate on creating, piloting and scaling innovative research and development interventions utilitzing innovative health practices to help reduce disease and mortality rates worldwide. USAID invites organizations and companies to submit an Expression of Interest (EOI) and participate in generating novel tools and approaches that accelerate and sustain improved health outcomes in lowand- middle-income countries (LIMIC). | 66% | Special Notice | Open |
This Justication and Approval provides the rationale and Competition Advocates Approval of Restricting a $10 Million opportunity to Local Entities as ADS 302.3.4.5(f) using the Authority at AIDAR 706.302-70(b)(3)(i). Concerns or questionis about this restriction to eligibility should be addressed to Andre-Guy Soh at asoh@usaid.gov by September 30, 2024. The related solicitation is Request for Proposal (RFP) Number 72052724R00002 for Institutional Strengthening of the Government of Peru to implement the National Counternarcotics Policy | 61% | Special Notice | Open |
This is a combined synopsis/solicitation for commercial services prepared in accordance with the format set forth at Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) FAR 12.202(b)(1) (Apr. 20, 2026) [adopted via Department of Health and Human Services (HHS) FAR Class Deviation (CD) No. 2025-09, Amendment 1 (Nov. 3, 2025)]. This announcement constitutes the only solicitation. Offers are being requested, and a separate written solicitation will not be issued. This acquisition is exclusively set aside for 8(a) concerns. Status as an 8(a) concern is determined by the Small Business Association (SBA) in accordance with 13 Code of Federal Regulations (CFR) part 124. Solicitation number 75F40127R00003 is issued as a request for proposal (RFP) for On-Site Records Information Management (RIM) services. The Government anticipates awarding a single Indefinite Delivery, Indefinite Quantity (IDIQ) contract that will allow for Time-and-Materials (T&M), Labor-Hour (LH), and Firm-Fixed Price (FFP) type Task Orders.This anticipated IDIQ will contain a five (5) year ordering period, which shall be from the date of award through five (5) years unless extended as applicable. Please carefully review all the attached solicitation documents (RFP 75F40127R00003, and Attachments A-F) for a full description of this effort and for instructions on how to submit questions and proposals within the given deadlines. | 57% | Combined Synopsis | 12/01/2026 |
*** 11/16/2026: AMENDMENT 07 ISSUED - SEE SUMMARY OF AMENDMENT AT BOTTOM OF POSTING*** ***SUMMARY ONLY - SEE ATTACHED COMBINED SYNOPSIS/SOLICITATION DOCUMENT FOR FULL DETAIL*** APS _ Combined Synopsis/Solicitation Brief: Combined Synopsis/Solicitation for Commercial Items Agile Professional Services ("APS”) Department of the Army Project Name: Agile Professional Services ("APS") Solicitation Number: W900KK-26-R-A023 NAICS Code: 541990 (All Other Professional, Scientific, and Technical Services) Set-Aside: Total Small Business Set-Aside Contract Type: Labor Hours/T&M 1. General Information This combined synopsis/solicitation is issued by Army Contracting Command - APG - Orlando Division to procure Agile Professional Services ("APS"). The acquisition is structured to support critical technical and professional operations under a flexible framework, to be proposed and developed by the successful offeror. Key acquisition parameters include: • Set-Aside Status: 100% Total Small Business Set-Aside. • Small Business Size Standard: $19.5M, or as defined by SBA regulations. • Primary NAICS Classification: 541990 — All Other Professional, Scientific, and Technical Services. • Contract Vehicle Type: Labor Hours/T&M 2. Solicitation Details This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. This combined synopsis/solicitation is prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2025-06, effective August 27, 2025.and DFARS Publication Notice (DPN) July 2, 2026. As described in the attached FAR 52.212-2, The Army will adopt aspects of FAR Part 15 evaluation procedures. Considering the novel, and commercial, nature of these services this is deemed necessary to balance fairness, transparency, and competition with the interests of expediency and flexibility 3. Description of Requirement CPE ST3 has a need for Agile Professional Services (APS) support services to provide the organization with the ability to augment its Military and Government Civilian workforce in order to execute its mission. The services will be limited to providing professional support services, under a Performance Based Services model, to CPE ST3 and CPE ST3 customers for limited requirements which are related to CPE ST3’s mission. Since its inception, CPE ST3 has relied on contractor support to conduct its mission in all phases of life cycle management due to insufficient personnel within the organization to successfully perform the required services. This model of a Government footprint with a scalable contractor workforce has enabled CPE ST3 to be very flexible and agile in its mission to support the changing needs of the Army. The services to be performed will include related activities in support of all aspects of providing responsive integrated and interoperable infrastructure for simulation, training, testing, and threat solutions. APS support services are required for effective, efficient, and responsive full lifecycle management of efforts to include, but not limited to: vision statements and doctrine, development of architectures, program support (e.g., acquisition and budget planning, business and financial programming and execution, modeling, simulation, simulator, training device, and instrumentation development, documentation, fielding and execution, system analysis and integration, integrated logistics support, strategic planning, contingency and mission support, security cooperation/international relations, program oversight, independent verification validation and test evaluation, prototype development, sustainment and operations, and analysis of emerging technologies support), and subject matter experts on military tactics, techniques, and procedures. Potential areas of growth are envisioned but not limited to be in the areas of Cyber and Information Warfare, Robotics, Unmanned Vehicles, Home Station Training, Multi-Sensory Simulation, Artificial Intelligence, Hypersonics, Directed Energy, Electronic Warfare, Autonomous Systems, Multi-Domain Integration, Target and Threat Systems, Environment Modeling, Human Performance Training, Security Cooperation, Nuclear Engineering, and Medical Training. The critical performance requirement is the successful development and transition of CPE ST3 from a traditional, staffing-based support model to a task-based, outcome-driven Agile delivery framework that is to be developed by the Performer. Success will be measured by the contractor's ability to develop and iterate, through performance under the resultant contract, a framework that both provides the following, and is able to be replicated across future requirements. 4. Period of Performance / Performance Locations: Total Performance Period shall not exceed 66-months: Base Period – (15-Mar-27 to 14-Sep-27) Agile Development and Transition In Option Period 1 – (15-Sep-27 to 14-Sep-28) – Enterprise Performance Option Period 2 – (15-Sep-28 to 14-Sep-29) – Enterprise Performance Option Period 3 – (15-Sep-29 to 14-Sep-30) – Enterprise Performance Option Period 4 – (15-Sep-30 to 14-Sep-31) – Enterprise Performance Option Period 5 – (15-Sep-31 to 14-Mar-32) – Enterprise Performance and Transition Out Option Period 6 – (15-Mar-32 to 14-Sep-32) – Option to Extend the Term of Service under FAR 52.217-8 * Work will be performed at Government facilities, Contractor facilities, and Remote locations. Primary Government sites include Orlando, FL, and Redstone Arsenal, AL (including 24/7 operations). Additional Government sites include: Fort Campbell, KY; Fort Hood, TX; Fort Drum, NY; Fort Irwin, CA; Fort Polk, LA; Fort Rucker, AL; Fort Bragg, NC; Hohenfels, Germany; and Camp Humphreys, South Korea. 5. Applicable FAR Provisions/Provisions: See Attachment 7. The provisions and clauses apply to this acquisition and are incorporated by reference or full text as applicable. The full text of the FAR and DFARS clauses may be accessed electronically at https://www.acquisition.gov/. 6. Proposal Submission Instructions Phase II responses to this solicitation are due by 30 November 2026 / 10:00am (Eastern). Submission due dates for all subsequent Phases will be issued via Advisory Notifications / Invitations. a. Electronic Submission Requirement All proposals must be submitted electronically via the Department of Defense Secure Access File Exchange (DoD SAFE) application at https://safe.apps.mil . Hardcopy submissions or proposals sent directly via standard email will not be accepted. b. DoD SAFE Link Upon issuance of Phase II Notification / Invitation, the Government will be issuing each respective Offeror (2) DoD SAFE links. Links will be sent to the POC identified in the Phase I Cover Letter: DoD SAFE Link #1 - Pick Up - JIRA Data: Each Offeror will receive an email from DoD SAFE with a link in which to download all the JIRA Data and Instructions. DoD SAFE Link #2 - Drop Off - Phase II Proposal Submittal: Each Offeror will receive a secondary email from DoD SAFE with a link to upload all their respective documents for Phase II, including the final PowerPoint Presentation and their attendee list for Oral Presentations. Link Validity: Once the Government issues the pick-up and drop-off, each Offeror will receive automated emails from DoD SAFE containing the unique links and instructions. These links are valid for exactly 14 days from the date of receipt. WARNING: The Government will not be held responsible for late proposals resulting from an offeror's failure to submit a drop-off by the established deadline. c. Submission Protocol Upon receipt of the automated DoD SAFE email link: Click the link inside the automated email to access the secure upload portal. Upload all required solicitation attachments, ensuring they are named clearly. Click "Submit" or "Drop-off" to complete the upload process. d. Timeliness of Submissions The Submission Timeframe: For a submission to be considered timely, the completed DoD SAFE upload must be finalized, and the automated system notification must arrive in the Government recipients' inboxes on or before the official Proposal Due Date and Time. Upload Buffer: Depending on your network speed and the size of your proposal volumes, uploads can take time. Offerors are highly encouraged to start their upload several hours before the deadline. Technical difficulties, network latency, or Offeror delays in upload initiation will not be used as a justification to accept late submissions. * Late Submissions: Late submissions will be handled in accordance with FAR 52.212-1(f). See FAR 52.212-1, Instructions to Offerors — Commercial Items; for proposal submission instructions. 7. Additional Information i. Questions: The deadline to submit questions for this RFP has passed. ii. Security Clearance Requirements: See DD254 for specifics. a. Probable Facility Clearance without Storage b. Probable Secret, Top-Secret, and TS/SCI requirements for certain employees. 8. Attachments: i. Statement of Objectives (SOO), dated 8 September 2026 ii. FAR 52.212-1 – Instructions to Offerors - Proposal Submission instructions iii. FAR 52.212-2 – Evaluation Criteria – Evaluation Plan iv. Wage Determinations a. WD 2015-4377 REV 33 20260820 NC b. WD 2015-4553 REV 31 20260730 FL c. WD 2015-4603 REV 34 20260820 AL d. WD 2015-4631 REV 34 20260812 AL e. WD 2015-4719 REV 34 20260812 KY f. WD 2015-5197 REV 33 20260812 LA g. WD 2015-5237 REV 32 20260812 TX h. WD 2015-5629 REV 29 20260513 CA i. WD 2015-5775 REV 32 20260812 NY v. PWS Template vi. QASP Template vii. Provisions and Clauses viii. CDRLs a. A001 – Contractor’s Progress and Status Report b. A002 – Phase-Out Transition Plan c. A003 – Agile Dashboard d. A004 – Agile Management Plan ix. DD 254 a. SAP Addendum (incorporated into Attachment 9 (“ix.”)) b. SCI Addendum (incorporated into Attachment 9 (“ix.”)) x. APS Pricing Workbook xi. Army DSO JIRA Settings (TO BE PROVIDED PRIOR TO PHASE II PROPOSAL SUBMISSIONS) xii. Compliance Matrix (Government Format) Acknowledgement of Amendments: 1. Amendment 01: The purpose of this amendment was to provide Attachment-6_Quality_Assurance_Surveillance_Plan_(QASP)_Proposal_Template_-_APS_20260903 2. Amendment 02: The purpose of this amendment was to do provide responses to Industry questions, to revise the Combined Synopsis/Solicitation, to provide for revised submission dates, and to provide updated Attachments 1, 2, 3, 4.e, 5, and 10. 3. Amendment 03: The purpose of this Amendment was to update the proposal submission instructions incorporating submission requirements and instructions for the use of DOD SAFE as the sole method of submission. 4. Amendment 04: The purpose of this amendment was to update the Combined Synopsis Solicitation, Proposal Submission Instructions -1, Evaluation -2, and the Pricing Workbook for clarity and changes to Phase II information. This amendment does NOT impact the Phase I Proposal Submission Requirements / Deadline. 5. Amendment 05: The purpose of this Amendment was to update the following: 1) Revise Section 7 (Proposal Submission Instructions) of the Combined Synopsis/Solicitation Attachment, updating the DoDSAFE "drop request" date, updating the submission due date; and 2) Revise Section 6 of the SAM.Gov posting to reflect the above. 6. Amendment 06: The purpose of this Amendment was to update the following: a) Revise Attachment 10 – APS Pricing Workbook with revised Periods of Performance, b) Revise and incorporate the Government’s required template for Attachment 12 – Compliance Matrix, c) Revise Attachment 02 - FAR 52.212-1 – Instructions to Offerors - Proposal Submission instructions with the Government’s required template usage for Attachment 12 – Compliance Matrix, d) Revise Attachment 03 - FAR 52.212-2 – Evaluation Criteria – Evaluation Plan with the Government’s required template usage for Attachment 12 – Compliance Matrix, and e) Revise Section 5 of the SAM.Gov posting for the Period of Performances and Government’s Tentative Milestone Schedule. 7. Amendment 07: The purpose of this Amendment was to update the following: a) Update the Combined Synopsis Solicitation and Proposal Submission Instructions -1 to reflect revised Phase II guidance. b) Revise Section 6 of the SAM.Gov posting to reflect the above **SUMMARY ONLY - SEE ATTACHED COMBINED SYNOPSIS/SOLICITATION DOCUMENT FOR FULL DETAIL*** | 57% | Combined Synopsis | 11/30/2026 |
This Commercial Solutions Opening (CSO) solicitation is issued in accordance with R-DFARS 212.70, Defense Commercial Solutions Opening NAICS Code and Associated Description: 541990 - All Other Professional, Scientific, and Technical Services Federal Agency Name and Contracting Officer Address: FA7014 - Air Force District of Washington, Secretary of the Air Force Enterprise Contracting Division (AFDW/PKS)AFDW/PKS is soliciting White Papers from interested offerors under this Two-Step CSO. The Department of the Air Force (DAF) seeks innovative commercial-service solutions to enhance acquisition and program management support capabilities through artificial intelligence (AI), automation, data interoperability, workflow improvements, and analytical efficiencies. The Government is particularly interested in solutions that improve the effectiveness and efficiency of existing mission-support functions, including acquisition processes, Defense Industrial Base analysis, information technology integration, and Modernized Process Model (MPM) capabilities. First Step: WHITE PAPER DUE DATE AND TIME: White Papers will be accepted until Friday, 20 November 2026 at 12:00 PM ET. White Papers may be submitted at any time during this period. White Papers received after specified date and time, will be considered late in accordance with FAR 52.212-1(f).Second Step: PROPOSAL DUE DATE AND TIME: To be provided in the Requests for Proposal sent to offerors that submit White Papers considered to be of further interest to the Air Force. Proposals received after specified date and time, will be considered late in accordance with 52.212-1(f).White Papers shall be submitted through the Solicitation Module of the PIEE at https://piee.eb.mil via the Solicitations offer tab NLT 20 November 2026 by 12:00 P.M. EST. White Papers submitted by email or hand-carried will not be evaluated (exception for system outage, see below). For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf. It is the offerors responsibility to obtain written confirmation of receipt of all electronic files of the full proposal by the contracting office. In the event the Solicitation Module is down, the alternate method for proposal submission is via email to the CS and CO. The offeror must obtain prior written approval from the CO or CS to use the alternate submission method. The Offeror shall obtain written approval from the Contracting Officer or Contracting Specialist to submit the proposal via an alternate method. The only alternative method the Government will consider is email. This posting has been amended to reflect NAICS 541990. *This posting has been amended to provide answers to vendor questions. | 57% | Solicitation | 11/20/2026 |
Additional Details
Solicitation Number
72067422R00004
Archive Date
Apr 28, 2022
Place of Performance Country
ZAF
Office Address
PRETORIA, ZAF