WWYK250096 - Repair Stormwater Spill Gate 11 Structure
Responses closed . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM CDT
- Posted
- July 23, 2026
- Notice type
- Solicitation
- Set-aside
- Women-Owned Small Business Sole Source
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- AIR FORCE MATERIEL COMMAND.AIR FORCE SUSTAINMENT CENTER.FA8137 AFSC PZIOC
- Place of performance
- S Coffeyville, Oklahoma, 73145
- PSC
- Z2KA: REPAIR OR ALTERATION OF DAMS
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- FA813726R0032
- Notice ID
- 73b0335254dd4fe0b3c1c99b75069fcc
Description
UPDATE 10 July 2026
The PRE-BID RFI responses have been uploaded.
The proposal due date is 10 Aug 2026 NLT 02:00PM CST.
UPDATE 22 June 2026
The site visit sign in sheet has been posted. The RFI due date is 25 June 2026 at 2:00 PM CST.
This posting is for Tinker AFB – WOSB construction contractors with NAICS 237990.
Project Solicitation Number: FA813726R0032
Project Title: WWYK250096 - Repair Stormwater Spill Gate 11 Structure
Project Location: Tinker Air Force Base
WWYK250096 - Repair Stormwater Spill Gate 11 Structure- The work to be performed under the terms of this Order consists of furnishing all materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish the repair of the concrete spill gate structure (Spill Gate 11 / Outfall 9) to reestablish the existing channel flow that conveys stormwater upstream from within TAFB outside the perimeter fence via Solider Creek at Tinker Air Force Base (AFB), Oklahoma (reference the project drawings for additional location information).
Project specific documents are attached to this posting.
If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses.
After review of the attached project specific documents, if you are interested to attend the Initial Site Visit, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. The POC emails are austin.elm@us.af.mil and sharla.flowers_brandon.1@us.af.mil. Your RSVP email must be received by 2:00pm CT on 12 June 2026. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access.
After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
The proposal will be due 20 July 2026 at 2:00PM CST.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (13)
- Download
250095-Pre BID RFIs.pdf
1.6 MBAdded in Solicitation version 4Posted - Download
250096-Site Vist Sign in Sheet.pdf
5.0 MBAdded in Solicitation version 3Posted - Download
Solicitation - FA813726R0032.pdf
663 KBAdded in Solicitation version 2Posted - Download
250096- EAL List - BLANK to Contractors.xlsx
62 KBAdded in Solicitation version 2Posted - Download
Att 10_250096_SOW.pdf
370 KBAdded in Solicitation version 2Posted - Download
Att 12_250096_Drawings.pdf
9.7 MBAdded in Solicitation version 2Posted - Download
WD.pdf
206 KBAdded in Solicitation version 2Posted - Download
Att 4_250096_RMDFco.pdf
297 KBAdded in Solicitation version 2Posted - Download
Att 11_250096_Submittal Register.pdf
132 KBAdded in Solicitation version 2Posted - Download
2020 TAFB Facility Standard.pdf
5.8 MBAdded in Solicitation version 2Posted - Download
2026 TAFB Mechanical Standard.pdf
1.2 MBAdded in Solicitation version 2Posted - Download
2026 TAFB Electrical Standard - Signed.pdf
523 KBAdded in Solicitation version 2Posted - Download
2026 TAFB FIRE PROTECTION STANDARD.pdf
341 KBAdded in Solicitation version 2Posted
Lifecycle
- 1Version 1Presolicitation
WWYK250096 - Repair Stormwater Spill Gate 11 Structure
- 2Version 2Solicitation
Type changed from Presolicitation to Solicitation
WWYK250096 - Repair Stormwater Spill Gate 11 Structure
- 3Version 3Solicitation
WWYK250096 - Repair Stormwater Spill Gate 11 Structure
- 4Version 4Solicitation
WWYK250096 - Repair Stormwater Spill Gate 11 Structure
- 5Version 5SolicitationCurrent
WWYK250096 - Repair Stormwater Spill Gate 11 Structure
Similar Opportunities
Additional Details
Solicitation Number
FA813726R0032
Archive Date
Jun 5, 2027
Office Address
TINKER AFB, OK, 73145-9125