GovChime
Notice ID: c8173ded53ac4a84b65abb24738f7ab9SolicitationArchived

Pedestal and Bridge Crane

Archived on February 10, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:00 PM CST
Posted
January 9, 2026
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
333923: Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
Agency
Department of WarDepartment of the Army

Notice details

Office
AMC.ACC.ACC-CTRS.ACC RI.W6QK ACC-RI
Place of performance
Rock Island, Illinois, 61299
Last updated
Nov 4, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W519TC-26-Q-A060
Notice ID
c8173ded53ac4a84b65abb24738f7ab9

Description

The Rock Island Arsenal has a requirement for the following item 

The Government intends to make a firm fixed price (FFP) award to the lowest priced, responsive, responsible vendor whose quote, conforms to the RFQ requirements and represents the lowest total evaluated price. Discussions are not anticipated. 

Payment will be completed via Wide Area Work Flow (WAWF) 

Quote MUST include shipping to Rock Island Arsenal, IL 61299 

Site Visit information is within the solicitation

Quotes are due by 12 PM, Jaunary 26, 2026 

Certificate of Conformance is required

Please review the attached RIPD, Evaluation Criteria and CDRL for more detailed information. Please leave detailed notes on the RIPD if you comply to each section. If you do not comply - please explain into detail why.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (5)

  • Solicitation Amendment W519TC26QA0600001.pdf

    3.8 MBAdded in Solicitation version 3Posted
    Download
  • Solicitation Amendment - W519TC26QA0600001 Professional Appearance.pdf

    3.3 MBAdded in Solicitation version 3Posted
    Download
  • 26-2-05 CDRL.pdf

    465 KBAdded in Solicitation version 1Posted
    Download
  • RIPD E4000-26-2-05 Pedestal Crane.pdf

    213 KBAdded in Solicitation version 1Posted
    Download
  • 26-2-05 Evaluation Criteria.pdf

    131 KBAdded in Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1SolicitationArchived

    Pedestal and Bridge Crane

    Notice 7604127db9414884bd28948060704bc4 on SAM.gov

  2. 3
    Version 3SolicitationArchivedCurrent

    Pedestal and Bridge Crane

    Notice c8173ded53ac4a84b65abb24738f7ab9 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Scope of Work Project Overview: Provide and install Variable Frequency Drives (VFDs) for two bridge crane hoists (Yale Hoists), ensuring compliance with electrical classification requirements: Class 1, Div. 1, Group D and Class 2, Div. 1, Groups E, F, and G. Both hoists are located indoors and have a hook height of approximately 30 feet. Specific model and serial numbers are as follows: Model: FEW30-31TR10D6 (1 of 2) Serial: CK2334RM (1 of 2) Level of Service The contractor shall provide a complete turnkey solution for the project. This service level includes providing all necessary labor, materials, equipment, and project management required for the successful installation and commissioning of the VFDs on the two specified bridge cranes. 2 additional enclosures will be required to be mounted to the frame of the bridge crane. The required site visit will determine optimal location. The final deliverable must be a fully operational and integrated system that is compliant with all standards mentioned herein. The contractor is expected to manage all project phases, from the initial site assessment to final documentation and training, ensuring minimal disruption to ongoing operations. 1. Site Assessment: Conduct an initial site assessment to evaluate the existing crane setup and electrical infrastructure. Identify any structural modifications required for the safe and secure installation of the new VFDs, controls, and associated protective enclosures. The contractor will be responsible for executing all necessary and approved structural modifications as part of the turnkey installation. Verify the electrical classification requirements and ensure all necessary safety measures are in place. 2. Equipment Procurement: Procure VFDs suitable for the specified electrical classifications and crane specifications. Ensure all equipment is certified for use in hazardous locations. Include specific model and serial number (FEW30-31TR10D6, CK2334RM) for one of the hoists. 3. Installation: Install VFDs on each of the two bridge cranes, following manufacturer guidelines and safety protocols. Ensure proper wiring and connections are made to integrate the VFDs with the existing crane control systems. Install necessary protective enclosures and grounding to meet the specified electrical classifications. 4. Testing and Commissioning: Perform initial testing of the VFDs to ensure proper functionality and integration with the crane systems. Conduct load testing to verify the performance and safety of the VFDs under operational conditions. Make any necessary adjustments or calibrations to optimize performance. 5. Documentation: Provide detailed documentation of the installation process, including wiring diagrams, equipment specifications, and safety compliance records. Submit final reports and test results to the project stakeholders. 6. Training: Provide training to crane operators and maintenance personnel on the operation and maintenance of the new VFDs. Ensure all personnel are familiar with the safety protocols and emergency procedures related to the VFDs. 7. Warranty and Support: Provide a warranty for the installed VFDs and offer ongoing support for any issues or maintenance needs. 8. Project Timeline: The period of performance for this contract is six (6) months, beginning March 1, 2026. All work, including site assessment, procurement, installation, testing, commissioning, and training, must be completed within this timeframe. The offeror must provide a detailed project timeline with milestones for each phase of the project that fits within this required period of performance. 9. Safety Compliance: Ensure all work is performed in accordance with relevant safety standards and regulations, including NFPA 70 (National Electrical Code) and OSHA requirements.
92%
Combined Synopsis01/05/2026
Chain and Hoist10A2016 GANTRY A SERIES STEEL ADJUSTABLEHEIGHT include Wheel Brakes and FestooningNER2G080SHarrington 8 Ton NER2 Hoist with Geared Trolley 10 foot HOL and 16 foot Pendant
86%
Combined Synopsis04/22/2026
Gantry Crane
84%
Combined Synopsis05/12/2026
Gantry Crane w/ electric hoist
79%
Solicitation02/16/2026
Outdoor Motorized Gantry Crane
78%
Combined Synopsis07/07/2026

Additional Details

Solicitation Number

W519TC-26-Q-A060

Archive Date

Feb 10, 2026

Office Address

ROCK ISLAND, IL, 61299-0000